Planning Board Meeting & Work Session — 2026-02-03 — Agenda
Text below is an automated extract for searching and reading. Check the original for formatting, tables, diagrams and scanned pages. Captured text is not an editorial review.
Needs text review. The last captured version is retained.
Source provenance
- Captured
- October 27, 2026 at 9:17 PM Eastern
- Original SHA-256
- 7c7cd0ea91cd4bf96b6f0dd41f02e7745ad7825f7806c49b4b93152ed03774ea
- Format
- PDF · 152 pages
Page 1
TOWN OF CORTLANDT
PLANNING BOARD
Steven Kessler, Chairperson Town Supervisor
Thomas A. Bianchi, Vice-Chairperson Town Hall, 1 Heady Street Richard H. Becker, MD
Cortlandt Manor, NY 10567
Nora Hildinger Main #: 914-734-1080 Town Board
Kevin Kobasa Fax #: 914-788-0294 James F. Creighton
Peter McKinley Cristin Jacoby
Jeff Rothfeder Planning Staff email: Robert Mayes
Karen Timko, Alternate chrisk@townofcortlandtny.gov Joyce C. White
Kellan Cantrell, Alternate
TO JOIN THE MEETING REMOTELY USE THE ZOOM LINK BELOW:
https://us02web.zoom.us/j/89767557891?pwd=aPjNe7RNV1Ixv1XThGGcqblL2sdOp5.1
WORK SESSION……………………………………………………..FEBRUARY 3, 2026 6:00 PM
1. Discuss February 3, 2026 Regular Planning Board Meeting Agenda.
MEETING AGENDA………………………………………………….……... PLANNING BOARD
TOWN OF CORTLANDT
6:30 TUESDAY EVENING*
FEBRUARY 3, 2026
1. PLEDGE TO THE FLAG
2. ROLL CALL
3. CHANGES TO THE AGENDA BY MAJORITY VOTE
4. ADOPTION OF THE MINUTES OF THE MEETING OF JANUARY 6, 2026
5. CORRESPONDENCE
a. Receive and file the 2025 Annual Report.
6. RESOLUTION
PB 2025-17 a. Application of 2051 Cortlandt Holding, LLC for Amended Site Plan approval
for the addition of 5 parking spaces at the existing gas station located at 2051 E.
Main St. Drawing latest revised December 22, 2025. (see prior PB 2019-1)
7. PUBLIC HEARING (ADJOURNED FROM PREVIOUS MEETING)
________ _Public
___Hearing: _ ____
Application of the Yeshiva Ohr Hameir for Site Plan_approval,
PB 2025-7 a.
___Special
_ _ _ __and a Wetland
an amended _ _ _
___the repurposing of other
Permit for a University, College or Seminary
__51,730
The Yeshiva Ohr Permit for a proposed ____sq. ft. dormitory__building,
_ _
Hameir public _______including
_
buildings on site, and site improvements
_ _ _ _ _ _ _ _
stormwater, landscaping and
hearing has been building façade
_ _
renovations_ located at the ____ Ohr Hameir campus
existing Yeshiva
adjourned to the at 141 Furnace
_ _ _ ___ Rd. Drawings latest revised December
Woods ____17, 2025. (see
____
March 3rd Planning _____ ____
prior PB 7-09)
Board meeting.
Page 2
PB 2025-5 b. Public Hearing: Application of VS Construction Corp. for Site Plan approval
and for Tree, Wetland and Steep Slope permits for a proposed 96,850 sq. ft.
Assisted Living Facility located in the Medical Oriented District (MOD) at 2003
Crompond Road. Drawings latest revised November 20, 2025.
8. OLD BUSINESS
PB 2025-18 a. Application of 70 Roa Hook Realty LLC for Site Development Plan approval
to redevelop the site of the partially constructed Crystal Clean Carwash facility
to a proposed vehicle showroom and service facility for property located at 70
Roa Hook Rd. Drawings dated January 22, 2026 (see prior PB 13-16)
PB 2025-11 b. Application of Dakota Recycling Service, LLC and Dakota Concrete Services,
LLC for the property of Briga Enterprises Inc. & Bilotta Realty of Westchester
Inc. for Amended Site Plan approval for the existing Dakota Recycling Services
and Dakota Concrete Services for property located at 2099 Albany Post Rd.
Drawings dated January 20, 2026 (see Prior PB’s 2024-3, 8-03, 15-99 & 29-95).
9. NEW BUSINESS
PB 2026-2 a. Application of Oregon Homes Inc. for Preliminary Plat approval and for Steep
Slope and Tree Removal Permits for a proposed 7-lot major subdivision, for 6
residential lots and one mixed use parcel, for property located at 1127 Oregon
Road and 2 Red Mill Road. Drawings dated November 5, 2025.
PB 2026-3 b. Application of VS Construction for Site Development Plan approval and for
Steep Slope and Tree Removal Permits for a proposed 9,600 sq. ft. commercial
building located on future parcel 3 within the Medical Oriented District for
property located at 2003 Crompond Rd. Drawings dated January 21, 2026.
10. ADJOURNMENT
Next Regular Meeting; TUESDAY, MARCH 3, 2026 at 6:30* PM
Agenda information is also available at www.townofcortlandt.com
* Regular meeting will begin at the conclusion of the work session
2|Page
Page 3
TOWN OF CORTLANDT
DEPARTMENT OF PLANNING & COMMUNITY DEVELOPMENT
Chris Kehoe, AICP – Director Town Supervisor
Richard H. Becker, MD
Town Hall, 1 Heady Street
Planning Staff: Cortlandt Manor, NY 10567
Heather LaVarnway, CNU-A, AICP Town Board
Main #: 914-734-1080 James F. Creighton
Michelle Robbins, AICP
Rosemary B. Lasher Cristin Jacoby
Robert Mayes
Joyce C. White
MEMO
TO: Dr. Richard H. Becker, Town Supervisor
Members of the Town Board
Steven Kessler, Chairperson
Members of the Planning Board
FROM: Chris Kehoe, AICP
Director of Planning & Community Development
RE: Annual Planning Board Report - 2025
DATE: January 21, 2026
Please find attached a copy of the 2025 Annual Planning Board Report
CRK/crk
Enc.
cc: Thomas Wood, Esq., Town Attorney
Michael Cunningham, Esq., Deputy Town Attorney
Michael Preziosi, P.E., Director DOTS
Art Clements, AAC
Wendy Talio, CAC
Tino Martin, PRC
Laroue Shatzkin, Town Clerk
Page 4
2025 ANNUAL REPORT - PLANNING BOARD
2025 MAJOR SUBDIVISIONS GRANTED PRELIMINARY APPROVAL
None
2025 MAJOR SUBDIVISIONS GRANTED FINAL APPROVAL
None
2025 MINOR SUBDIVISIONS GRANTED PRELIMINARY APPROVAL
1) PB 2024-2, George McCombe, 107 Mountainview Rd, PB Res. 12-25
2025 MINOR SUBDIVISIONS GRANTED FINAL APPROVAL
1) PB 2024-2, George McCombe, 107 Mountainview Rd., PB Res. 12-25
2025 PRELIMINARY SUBDIVISION APPROVAL TIME EXTENSIONS
1) PB 5-16, Pomona Development – 3 Lot Subdivision PB Res. 5-25, 7-25 & 17-25
2025 FINAL SUBDIVISION APPROVAL TIME EXTENSIONS
1) PB 2023-5, Evergreen Subdivision – 2 Lot Subdivision – PB Res. 2-25, 10-25 & 15-25, 19-25
2025 AMENDED SUBDIVISION APPROVALS
None
2025 PERFORMANCE SECURITY REDUCTIONS
None
2025 SPECIAL PERMITS WITH SITE DEVELOPMENT PLAN APPROVAL
1) PB 2025-10, PSW Realty, Electrical Contractor, 2015 Albany Post Rd., PB Res. 21-25
2025 SPECIAL PERMIT RENEWALS
1) PB 2024-7, Yeshiva Ohr Hameir, 141 Furnace Woods Rd., PB Res 1-25
1) PB 2025-13, MCAS Roofing, 1006 Albany Post Rd., PB Res. 22-25
1
Page 5
2025 SPECIAL PERMIT RECOMMENDATION TO TOWN BOARD
None
2025 SITE DEVELOPMENT PLAN APPROVALS
1) PB 2024-1, 3 Locust Ave. Self-Storage, PB Res. 4-25
2025 SITE DEVELOPMENT PLAN AMENDMENTS
1) PB 2024-3, Briga Enterprises Inc. & Bilotta Realty, 2099 Albany Post Rd., PB Res. 8-25
2) PB 2025-4, Floor & Décor, 2094 E. Main St., PB Res. 9-25
3) PB 2025-6, Wal-Mart Storage Containers, 3133 E. Main St., PB Res. 14-25
4) PB 2025-9, Yuka’s Patio, 2011 Albany Post Rd., PB Res. 25-25
2025 SITE DEVELOPMENT PLAN TIME EXTENSIONS
1) PB 2022-4 Gurdjieff Foundation, Inc., PB Res. 3-25
2) PB 6-15 Hudson Ridge Wellness Center, Inc. PB Res. 11-25
3) PB 2020-10, Cortlandt CSG, LLC, Solar Energy System, Lexington Avenues, PB Res. 13-25
4) PB 2022-10 Bilal Ahmad, Hotel, PB Res. 18-25
5) PB 2021-1, NRP Properties, 119 Oregon Rd. – PB Res. 20-25
6) PB 2023-2 – JJM Summit Realty, Dental Office, 1 Jerome Dr., PB Res. 24-25
2025 SITE PLAN TIME EXTENSIONS TO OBTAIN BUILDING PERMIT
1) PB 2020-6, Palisades Fuel, 2060 E. Main St., PB Res 16-25 & 23-25
2025 CELL TOWER SPECIAL PERMIT & SITE PLAN APPROVAL
None
2025 CORRESPONDENCE ITEMS
1) PB 16-99 Hollowbrook Golf Club 2024 Annual Water Monitoring Report, Receive and File
2
Page 6
2) PB 2019-1, Gasland Traffic Monitoring Protocol, 2051 E. Main St., Receive and File
2025 ACCESSORY APARTMENTS
1) Gomez, 60 Waterbury Parkway, PB Res. 6-25
2025 WETLAND PERMITS
None
2025 STEEP SLOPE PERMITS
None
2025 TREE REMOVAL PERMITS
None
2025 SEQR DEIS/FEIS REVIEW
None
3
Page 7
ANNUAL REPORT- 2025 PLANNING BOARD
PLANNING BOARD PRELIMINARY PLAT APPROVALS
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Minor Subdivisions
Number of Plats 6 6 0 1 0 0 0 0 0 0 1 0 1 0 0 0 0 1 0 0 1
Number of Lots 6 6 0 2 0 0 0 0 0 0 2 0 2* 0 0 0 0 2 0 0 2
Major Subdivisions
Number of Plats 5 3 4 5 0 2 2 0 0 0 1 0 0 0 0 2 0 0 1 0
Number of Lots 11 8 26 15 0 20 5 0 0 0 27 0 0 0 0 5 0 0 3 0
Condominium Units 147
(NYS Section 278)
Preliminary Subdivision
Time Extensions 11 15 17 12 17 11 7 3 2 2 2 2 2 2 0 0 0 0 1 2 3
Time Extensions Denied
Amendments 2 2 1
Denials 1
PLANNING BOARD FINAL PLAT APPROVALS
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Minor Subdivision
Number of Plats 4 6 2 0 0 2 0 0 0 0 0 1 1 0 0 0 0 1 0 0 1
Number of Lots 8 6 4 0 0 4 0 0 0 0 0 2 2* 0 0 0 0 2 0 0 2
Major Subdivision
Number of Plats 0 6 5 4 2 2 2 5 2 1 0 1 0 0 1 1 0 0 0 0 0
Number of Lots 0 20 11 5 8 6 4 13 151 4 0 14 0 0 27 3 0 0 0 0 0
Condominium Units/
NYS Section 278 147 92 16 147 56**
Reapproval 3
Final Subdivision 2 2 7 15 14 13 9 16 20 17 8 8 7 8 7 5 8 4 0 3 4
Time Extensions
Time Extensions Denied 1
* 2 lot commercial subdivision
** Pondview Commons
Page 8
ANNUAL REPORT- 2025 PLANNING BOARD
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Site Development Plans (SDP) 4 7 6 9 4 4 1 1 4 4 1 2 6 5 1 4 2 1 1 1
SDP Amendments 3 2 2 3 1 1 1 2 3 1 2 2 9 15 6 6 0 1 1 2 4
SDP with Special Permit 1 4 1 1 2 3 1 1 1 1 2 2 1 2 3 1 2 3 1
SDP TOTALS 8 11 9 13 7 8 3 4 7 6 4 6 17 21 9 13 3 4 5
SDP Time Extensions 2 3 4 5 7 5 2 1 1 0 0 1 1 1 1 0 5 4 6 6 6
SDP Time Extensions Denied
SDP Denials 1
Cell Towers (Co-Locate, Re-Cert, New) 7 2 2 2 1
Solar Energy Systems SDP & Special Permit 1
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Zoning Code Amendment 2 3 4 1 3 2 2 1 0 1 1*** 4
Recommendations
Wetland Permits 4 4 4 5 2 3 2 1 1 2 1 2 1 1 0 5 0 2
Tree Removal Permits 5 1 2 1 3 2 4 1 6 1 2 2
Steep Slope Permits 4 2 4 5 1 2 1 1 1 2 2 0 2 1 2 2
Special Permits Renewals 1 1 0 3 1 3 1 3 2 3 2
Special Permit Recommendations 1** 0 0 1
Lot Line Adjustments 3 2 2 0 1 1 2 3 2 2 2
Lot Line Adj. Time Extensions 2 0 0 1 0 1
Performance Security Reductions 2 0 1 1 2 2 1 1 1 1 2
Accessory Apartments 1 2 1 2 1 1 1
Cluster Recommendations 0 0 0 0
DEIS Scopes 2 3 0 1 1 0 0
*Includes Jacobs Hill Village PVD 103 Apartments and 58 Condominiums
**RRUSP Pondview Recommendation
*** RRUSP Amendment Recommendation to Town Board
Page 9
DRAFT
TOWN OF CORTLANDT RESOLUTION NO. 5-26
PLANNING BOARD
PB 2023-3
WHEREAS, an application for Planning Board approval of an Amended Site Development Plan
pursuant to Chapter 307 of the Town of Cortlandt Code was submitted by 2051 Cortlandt
Holding, LLC for 5 additional parking spaces at an existing gas station as shown on a drawing
entitled “Amended Site Development Plan” prepared by Cronin Engineering, P.E., P.C., latest
revision dated December 22, 2025, and
WHEREAS, the subject property is located at 2051 E. Main St., is approximately 42,100 sq. ft.,
in size, is zoned HC, highway commercial and is designated on the Town of Cortlandt Tax Maps
as Section 23.20, Block 3, Lot 13, and
WHEREAS, as required by Article 8 of the New York State Environmental Conservation Law
for the proposed Unlisted Action the applicant completed and submitted Part 1 of the Short
Environmental Assessment Form dated November 11, 2025, and
WHEREAS, the Planning Board approved the Site Development Plan for the construction of the
gas station, convenience store and other site improvements by Resolution 6-20 and the site has
been constructed and is operating as a gas station with a convenience store and deli, and
WHEREAS, since opening parking has been an issue at the site with some employees parking
on adjacent roadways, and
WHEREAS, the subject site plan amendment proposes 5 new parking spaces and the re-striping
of 2 existing parallel spaces to better define the parallel spaces, and
WHEREAS, none of the improvements are proposed in the wetland or wetland buffer but do
require the removal of an existing tree and grass area that will be required to be replanted, and
WHEREAS, the subject application was referred to the Town Engineering Division for their
1
Page 10
review and comment.
NOW THEREFORE BE IT RESOLVED, that pursuant to Section 617.7 of the SEQR
Regulations, as stated in this Resolution and throughout the course of this application as
contained in the minutes of the public hearing and other regular meetings of the Planning Board,
the Planning Board considered the impacts which may be reasonably expected to result from the
proposed action by comparing them against the applicable criteria in said section and finds that:
1. The proposed action will not result in a substantial adverse change to existing air quality,
ground or surface water quality and quantity, traffic or noise levels; a substantial increase in solid
waste production; nor generate a substantial increase in potential for erosion, flooding, leaching
or drainage problems.
2. The proposed action will not result in the removal or destruction of large quantities of
vegetation or fauna; will not substantially interfere with the movement of a resident or migratory
fish or wildlife species; will not impact a significant habitat area; and will not result in any
substantial adverse impacts on a threatened or endangered species of animal or plant, or the
habitat of such a species, or other significant adverse effects to natural resources.
3. The proposed action will not result in the impairment of the environmental characteristics of a
Critical Environmental Area.
4. The proposed action will not result in the creation of a material conflict with the adopted 2016
Town Sustainable Comprehensive Master Plan and Town Zoning Ordinance.
5. The proposed action will not result in the impairment of a character or quality of important
historical, archeological, architectural or aesthetic resources or of existing community or
neighborhood character.
6. The proposed action will not significantly impact the use of either the quantity or type of
energy.
2
Page 11
7. The proposed action will not create a hazard to human health.
8. The proposed action will not result in a substantial change in the use or intensity of use, of
land including agricultural, open space or recreational resources, or in its capacity to support
existing uses.
9. The proposed action will not encourage or attract a substantially larger number of people to the
subject property compared to the number of people who would come to such place absent the
action.
10. The proposed action will not create a material demand for other actions which would result
in one of the above consequences.
11. The proposed action will neither result in changes in two or more elements of the
environment, no one of which has a significant impact on the environment, nor when considered
together result in a substantial adverse impact on the environment.
12. The proposed action will neither result in two or more related actions undertaken, funded or
approved by an agency, none of which has or would have a significant impact on the
environment, nor when considered cumulatively, meet one or more of the criteria in this section,
and the Planning Board considered possible long-term, short-term and cumulative impacts and
found no significant effects which would result as a consequence of the proposed action, and
FURTHER BE IT RESOLVED that the Planning Board as lead agency in this matter finds that
based on Part 1 of the Short Environmental Assessment Form (EAF) prepared by Keith
Staudohar dated November 11, 2025 and Part II of the Short EAF prepared by the Planning
Department dated February 3, 2026 and based on the subject site development plan and the
record of this application and for reasons stated in this resolution including the analysis of the
criteria stated in 617.7(c)(i)-(xii), the proposed project will have no significant, adverse
environmental impact upon the environment and therefore the Planning Board adopts said Part II
3
Page 12
of the Short EAF and a Negative Declaration and that no Draft Environmental Impact Statement
is required with regard to this matter, and
FURTHER BE IT RESOLVED that the application of 2051 Cortlandt Holding, LLC for
Planning Board approval of an Amended Site Development Plan pursuant to Chapter 307 of the
Town of Cortlandt Code for 5 additional parking spaces at the existing gas station as shown on a
drawing entitled “Amended Site Development Plan” prepared by Cronin Engineering, P.E., P.C.,
latest revision dated December 22, 2025 is APPROVED subject to the conditions listed below
and that the Chairman of the Planning Board be authorized to endorse approval on said Site
Development Plan upon compliance by the applicant with such conditions as listed below, and
FURTHER BE IT RESOLVED that approval of said Site Development Plan shall be valid for
a period of twelve (12) months from the date of this Resolution to satisfy all conditions of
approval and to obtain the signature of the Planning Board Chairman on the Site Development
Plan. If there is no substantial change in the condition of the site and/or its environs, Site
Development Plan Approval may be extended by the Planning Board for a maximum of two (2)
additional years, granted in one-year intervals, upon timely application by this applicant and a
written explanation of the reasons for the delay which require the granting of a time
extension, and
FURTHER BE IT RESOLVED that the approved site plan with the Planning Board
Chairman’s signature shall be valid for a period of twelve (12) months from the date of signing.
If there is no substantial change in the condition of the site and\or its environs, Site Development
Plan Approval may be extended by the Planning Board for one (1) additional period of one (1)
year, upon timely application by this applicant and a written explanation of the reasons for
the delay which require the granting of a time extension.
4
Page 13
CONDITIONS AND MODIFICATIONS:
1. Add the appropriate signature block to the subject drawing and coordinate with the
Planning Office to (a) obtain the required signatures from the Director of Planning, the
Director of Environmental Services, the Planning Board Engineer and the Planning Board
Chairman on the subject drawing set and (b) submit four paper prints and an electronic
.pdf of said drawing to the Planning Office following the Chairman’s signature on the site
plan.
2. Obtain the signature of the Receiver of Taxes on an appropriate form indicating that
taxes on the subject property have been paid.
3. The applicant is advised that the conditions of this approval must be satisfied and the
site plan drawing signed by the Planning Board Chairman and any required State, County
and Town permits obtained prior to beginning any related work on the subject property.
4. The subject site plan shall be revised to increase the height of the proposed 24” tall dry
stacked decorative wall to a minimum of 30” to the satisfaction of the Planning Department
and the Department of Technical Services.
5. In addition to relocating the existing 2” oak as noted on the subject site plan, the site plan
shall be further modified to show additional landscaping and planting to the satisfaction of
the Director of Planning.
TO BE CONSIDERED FOR ADOPTION: FEBRUARY 3, 2026
5
Page 14
Westchester County Planning Board Referral Review
Pursuant to Section 239 L, M and N of the General Municipal Law and
Section 277.61 of the County Administrative Code
Kenneth W. Jenkins
Westchester County Executive
January 13, 2025
Chris Kehoe, AICP, Planning Director
Cortlandt Town Hall
1 Heady Street
Cortlandt Manor, NY 10567-1254
County Planning Board Referral File CTD 25-009 – Evergreen Manor Parcel 1
2003 Crompond Road
Site Plan Approval
Dear Mr. Kehoe:
The Westchester County Planning Board has received a site plan (revised November 20, 2025) and
related materials for an application to construct a new assisted living facility. The proposed building
would be part of the ongoing Evergreen Manor development plan, located on the site of the former
Evergreen Manor Hotel at 2003 Crompond Road (SBL 33.12-2-8). The 28.36-acre property recently
underwent a zoning change to the newly-created MOD – Medical Oriented District as well as a general
environmental impact analysis for the Evergreen Manor plan, for which we received a referral and
commented in a letter dated December 31, 2019 (CTD 19-005).
The proposed building would be located on a new 6.028-acre parcel (Parcel 1) created within the
northeastern corner of the Evergreen Manor property. The site fronts on Crompond Road, with Nancy
Lane and Cypress Lane forming dead-ends along the eastern side of the property. The site is located near
the New York Presbyterian hospital, which encouraged the Town to establish the MOD zone in order to
leverage development capabilities around the hospital. The site is mostly open wooded and yard areas,
along with the former hotel building and associated driveway which are to be demolished. The full plans
for the Evergreen Manor development call for a new street to connect to Crompond Road at the
intersection of Conklin Avenue, which would form the western boundary of the proposed new parcel.
The proposed 96,980 square-foot building would be three stories and contain 100 assisted living units,
with 118 beds. Due to the terrain, the main entrance would be located on the second floor of the building
at the rear, with a vehicular drop-off leading to a driveway connecting to the new street. A parking lot
with 66 spaces is proposed behind the building, connecting to the driveway as well as an emergency
access route leading to Crompond Road. Indoor and outdoor amenity areas are proposed for residents,
and new landscaping is proposed around the site along with retaining walls to manage the terrain.
We have reviewed this application under the provisions of Section 239 L, M and N of the General
Municipal Law and Section 277.61 of the County Administrative Code and we offer the following
comments:
1. Pedestrian circulation.
We appreciate that the applicant indicates that a sidewalk is proposed along the street frontage for the
other sections of the Evergreen Manor development, which would provide a safe pedestrian connection
432 Michaelian Office Building
148 Martine Avenue
White Plains, New York 10601 Telephone: (914) 995-4400 Website: westchestergov.com
Page 15
Referral File No. CTD 25-009 – Evergreen Manor Parcel 1
January 13, 2026
Page 2
from the development to points west, including the Hospital. However, while sidewalks are proposed
within Parcel 1 to connect the building to the parking area, as well as a connection to the other sections
of Evergreen Manor, we note that the street sidewalk does not continue along the Parcel 1 frontage, and
additionally the proposed building is oriented away from both Crompond Road and the proposed new
street. While we understand that assisted living facilities involve special security concerns regarding
access to the building, such concerns should not preclude pedestrian infrastructure for employees and
visitors, as well as for pedestrians wishing to pass along the street. We recommend that the sidewalk
fronting Crompond Road be extended along the full frontage of the proposed Parcel 1, in order to provide
safe pedestrian access within the neighborhood and establish a means for future sidewalk extensions east
along Crompond Road.
We also recommend that the Town considers establishing a full crosswalk network at the intersection of
Crompond Road and the proposed new street/Conklin Avenue. The proposed Evergreen Manor
development as a whole will increase the number of residents in the area, and safe pedestrian access is
an important consideration in order to provide full access to the sites. We note that the nearest crosswalk
is located a half-mile from the Conklin intersection, which bypasses the Hospital and the nearest Bee-
Line bus stops, and does not allow for safe crossing to the small commercial cluster on Taylor Avenue.
Including a full pedestrian crosswalk system at this intersection would benefit not only future residents
of Evergreen Manor, but also existing residents of the surrounding neighborhood.
2. Construction within a regulated stream/wetland buffer.
The proposed development involves disturbance within a wetland buffer area. The County Planning
Board consistently recommends that construction and alteration of land within regulated wetlands and
stream/wetland buffers should be avoided. This recommendation extends to the siting of stormwater
management facilities. We note that the impacts to the wetlands were discussed during the
Environmental Impact analysis, and the Town determined that the proposed mitigation measures were
sufficient to offset the proposed encroachment. We recommend that the Town and the applicant
continue to work to ensure that sufficient measures are maintained within the landscaping plan to fully
mitigate the disturbance to the wetland buffer.
We note the regulations for stream and wetland permitting through the NYS DEC have recently been
updated. The applicant should submit a Parcel Jurisdiction Determination application to NYS DEC to
identify any required permits for the proposed project. More information can be found at the NYS
DEC website: https://dec.ny.gov/nature/waterbodies/wetlands/freshwater-wetlands-
program/freshwater-wetland-jurisdictional-determination.
3. Transportation demand management.
We note that 66 parking spaces are to be provided on the site, yet the zoning code requires only 59
spaces. Ensuring that the transportation needs of residents, employees, and visitors are accommodated
through means other than private automobiles is an important factor in reducing the dependency on
private vehicle trips and lessening the impact of excessive parking spaces. The County’s
Transportation Demand Management Toolkits provide strategies for municipalities, employers, and
developers to reduce the need for single-occupancy vehicle commutes, which could help avoid the
need to park private vehicles. We recommend that the Town and applicant review these Toolkits,
Page 16
Referral File No. CTD 25-009 – Evergreen Manor Parcel 1
January 13, 2026
Page 3
which can be provided by the Planning Department, to ensure transportation needs are met while
reducing the space set aside for vehicles. The County’s Smart Commute Program can also assist
employers to implement TDM strategies.
4. NYS DOT review.
Crompond Road (US Route 202/NYS Route 35) is a State highway. The Town should forward a copy
of the application to NYS DOT to identify any required permits for the proposed project and to
evaluate potential traffic impacts to Crompond Road.
5. Bee-Line bus stop.
We note that the full Evergreen Manor development plan may increase ridership of the Bee-Line bus
system as new uses are constructed on the site. As the current closest bus stops are located in front of
the Hospital, (as noted above without the benefit of a crosswalk to connect the eastbound and
westbound stops), the Town and the applicant should contact the County Department of Public Works
and Transportation to discuss the possibility of installing a new bus stop at the corner of Conklin
Avenue and Crompond Road.
6. Bicycles and personal e-mobility devices.
We encourage the applicant to include a bicycle parking area for visitors and employees in order to
provide full parking options within the site. We also recommend that the applicant includes a power
supply for the charging of e-bicycles within this bicycle parking area.
7. Stormwater management.
We appreciate that the applicant proposes to install a bioretention basin and utilize permeable pavement
within the emergency access driveway, which will provide on-site stormwater management within the
property. We encourage the applicant to explore additional at-grade stormwater management solutions
that treat runoff on-site wherever possible, such as using pervious paving for parking areas, or the
installation of vegetative rain gardens within the landscaped areas.
8. Sewage flows
The proposed development will increase sewage flows from this site into the existing sewage
infrastructure. This increased flow will add to the volume of sewage flow requiring treatment at a Water
Resource Recovery Facility operated by Westchester County. Since 2010, it has been the policy of the
County Planning Board that municipal governments should require applicants to identify mitigation
measures that offset projected increase in flow, in order to comply with the County Environmental
Facilities Sewer Act. The best means to do so is through reductions in inflow/infiltration (I&I) at a ratio
of three for one for market rate units and a ratio of one for one for affordable units.
The County Planning Board further recommends that the Town implement a program that requires
inspection of sewer laterals from private homes for leaks and illegal connections to the sewer system,
such as from sump pumps. These private connections to the system have been found to be a significant
Page 17
Referral File No. CTD 25-009 – Evergreen Manor Parcel 1
January 13, 2026
Page 4
source of avoidable flows. At a minimum, we encourage the Town to enact a requirement that a sewer
lateral inspection be conducted at the time property ownership is transferred and any necessary corrective
action be enforceable by the municipal building inspector.
9. Recycling.
The Town should require the applicant to verify that there is sufficient space to accommodate the storage
needs for recyclables under the County’s recycling program. County regulations for recycling may be
found at: https://environment.westchestergov.com/recycling.
10. Green building technology.
We encourage the applicant to include as much green, or sustainable building technology as possible
within the proposed development. We note that no indication has been provided towards the utilization
of the rooftop. We recommend that the applicant consider incorporating a solar array or a green roof in
order to provide further environmental remediation within the site. In addition, the Town and the
applicant should give consideration towards the provision of electric vehicle parking capabilities within
the proposed parking area.
11. Universal Design.
We encourage the Town to consider the principles of universal design in this development, in addition
to any building standards required by ADA regulations. Universal Design standards allow all residents
and visitors to fully engage in our public and residential spaces. Universal Design is also an important
means of enabling household residents to age in place, as well as to provide accessible pedestrian access
and parking for persons with mobility issues.
Please inform us of the Town’s decision so that we can make it a part of the record.
Thank you for calling this matter to our attention.
Respectfully,
WESTCHESTER COUNTY PLANNING BOARD
Bernard Thombs
Chair, Westchester County Planning Board
BT/mv
cc: Blanca Lopez, Commissioner, Westchester County Department of Planning
Vincent Kopicki, Commissioner, Westchester County Department of Environmental Facilities
Steve Elie-Pierre, Director of Maintenance, Westchester County Department of Environmental Facilities
Craig Lader, Director of Transportation Planning, Westchester County Department of Planning
Heather Reiners, Smart Commute Program Coordinator, Westchester County DPW&T
Anne Darelius, NYS Department of Transportation, Region 8
Christopher Lee, NYS Department of Transportation, Region 8
Page 18
TOWN OF CORTLANDT
DEPARTMENT OF PLANNING & COMMUNITY DEVELOPMENT
Town Hall, 1 Heady Street Town Supervisor
Cortlandt Manor, NY 10567 Richard H. Becker, MD
Chris Kehoe, AICP – Director Main #: 914.734.1080
Town Board
Planning Staff: James F. Creighton
Heather LaVarnway, CNU-A, AICP Cristin Jacoby
Michelle Robbins, AICP Robert Mayes
Joyce C. White
MEMORANDUM
TO: Planning Board Members
FROM: Chris Kehoe, AICP, Planning Director, Department of Planning & Community Development
Heather LaVarnway, CNU-A, AICP, Planner, Department of Planning & Community Development
SUBJECT: PB 2025-5 Application of VS Construction Corp. for Site Plan approval and for Tree, Wetland and
Steep Slope permits for a proposed 97,700 sq. ft. Assisted Living Facility located in the Medical
Oriented District (MOD) at 2003 Crompond Road. Drawings dated January 23, 2025.
DATE: January 16, 2026
The Planning Department issued an initial review of the subject application in a letter dated 3/22/25. Numerous
technical meetings have been held with Town staff and the applicant and their representatives, resulting in
revised plans submitted to the Town. This review memo addresses the plan set (2 packets) with sheets SP-0.1
through EX-1.0, labeled “Site Plan Application – Parcel 1” with a revised date of November 20, 2025.
• NOTE: Sheet SP-0.2 Removals Plan is listed on the sheet index but was not included in the submission.
COMMENTS
Upon review of the revised plan set, we offer the following observations and comments:
1. Retaining Walls: This project includes the construction of over 2,400 linear feet of retaining walls, with
an average height of 8-12 feet and some areas extending up to 18 feet tall. These walls will be a
prominent site feature of this project; their massing and visual impacts are important considerations for
the Planning Board to understand and evaluate. As such:
A. The section of retaining wall that curves around in front of the building, at the intersection of
Route 202 and the new cul-de-sac, will be 14 feet tall. The applicant shall investigate the
possibility of tiering this section of wall and adding robust plantings between levels, in an effort
to reduce their visual impact at this important intersection.
B. The applicant shall provide material samples to the Board, along with photos of installed
examples, so they can evaluate the proposed material(s)/color(s).
2. Perspective Renderings: The applicant previously provided two perspective views of the project (sheet
A0.0 showing view from the intersection at 202 and new road, and sheet A0.1 showing view of the main
entrance facade on the south side of the building). These views shall be revised to include a standard
scale figure (6-foot-tall) for reference. The following additional perspective views – showing the building,
retaining walls, proposed landscape treatment, and the standard scale figure – shall be provided:
A. View from Route 202 looking southwest, in area of emergency access road;
B. Straight-on view from Route 202, halfway between emergency access and traffic light at new
cul-de-sac intersection.
Page 19
C. View from the new road looking southeast, in the area about halfway between Route 202 and
the vehicular entrance to the assisted living site.
3. Fences: There are numerous fence labels shown on sheet SP-1.0 but it is not clear what types of fencing
are proposed in which locations. A few labels are tagged to detail #11 on sheet SP-6.1 but none of the
other labels include detail references, and the only fence detail provided is for a chain link fence. It
appears that more than one type of fencing is proposed as the perspective renderings show a black iron
fence atop some of the retaining walls, and a white aluminum fence in some areas. The applicant shall
show details for all proposed fence types, and clearly label every section of fence on the plan with
reference to the associated fence detail. Chain link fencing should be avoided where possible. Any
fenced outdoor areas that will be programmed for resident use shall be labeled accordingly.
4. Landscaping:
A. The Site Landscape Plan (sheet SP-4.1) shows broad plant categories and notes the total number
of plants proposed in each category, along with examples of specific plants that may be selected
for that category, but a precise list and corresponding key to the landscape plan is not shown. A
standard planting schedule is required, and shall include the name, quantity (not area), and size
at planting of each plant material selected, along with a plant-specific key to the landscape plan.
Generic plant material entries such as “Quercus SPP” are not sufficient.
B. The applicant should evaluate a less linear approach to the landscaping along Route 202
between the emergency access road and the new cul-de-sac. Acknowledging that the 60”-
diameter underground drainage pipe running parallel to Route 202 in this vicinity could
influence the location and types of plantings between the building and the road, areas should be
identified where larger groupings of trees/shrubs could be clustered, with some specimen trees
included between clusters. This could help break up the view of the building from Route 202,
while also providing opportunities to highlight portions of the building in areas where the
plantings open up.
C. The five (5) evergreens shown at the corner of the building near the intersection of 202 and the
new cul-de-sac are too few, and spaced too far apart. Additional and varied trees should be
added to this area, to help soften the view of the 3-story building as it sits atop a ±14-tall
retaining wall.
D. The applicant shall clarify whether any landscaping is proposed within the fenced-in areas
flanking the main entrance, the interior courtyard, and any other fenced areas on site. If so, that
information should be added to the landscape plan.
E. The Site Grading and Drainage Plan (sheet SP-2.0) shows numerous stormwater planters around
the foundation of the building (both along the exterior and within the courtyard). No detail is
provided explaining how these planters will be designed, and the Site Landscape Plan shows
other landscaping treatments where the stormwater planters are shown on SP-2.0. The
applicant shall clarify whether the stormwater plans are actually proposed and, if so, provide a
detail and maintenance plan for them, along with a planting schedule showing the specific type,
quantity and size of their proposed plant materials.
F. Wherever possible, native/indigenous plant materials should be selected in favor of non-natives.
5. Parking Lot Landscaping: Per §307-22, the minimum required landscaping for parking lots with 30 or
more vehicles must be included within the perimeter of the lot. The calculations provided at the bottom
right of sheet SP-4.1 indicate that a 1,285 square foot “landscape perimeter” has been provided. The
applicant shall provide a colored plan graphic clearly showing the parking lot area, and the associated
landscaped areas within that perimeter that area being counted towards parking lot landscaping. These
areas must be within the perimeter of the parking lot.
Page 20
6. Lighting:
A. The overall lighting levels in most areas of the site are acceptable, though there are some hot
spots in the 2-4 footcandle range, primarily around the pole fixtures. The applicant should
evaluate whether the lighting plan can be modified to eliminate those hot spots.
B. The applicant shall provide fixture specifications for the proposed bollard light fixture, and
clarify how many bollards are proposed. The Lighting Plan (SP-5.1) shows five bollards (B1-B5)
but the fixture schedule indicates only three are proposed.
C. The applicant shall clarify whether any outdoor lighting is proposed beneath the porte-cochere.
If so, fixture details shall be provided and the associated photometrics shall be added to the
lighting plan.
D. The applicant shall clarify whether any exterior wall-mounted light fixtures are proposed. If so,
fixture details shall be provided and the associated photometrics added to the lighting plan.
E. The Sentry “acorn style” fixture does not appear to be Dark Sky compliant. No BUG ratings were
provided and we are concerned that, depending on where within the fixture the LEDs are
located, there could be substantial glare issues. If acorn-style fixtures are preferred by the
applicant, we suggest finding an alternative fixture that is Dark Sky compliant and where the
bulbs are hidden up in the cap of the acorn, which could help to reduce glare.
7. Tree Removals: The applicant shall provide a clear, detailed list of all trees proposed to be removed, and
an accounting of whether any are specimen/protected trees and/or on steep slopes of 25% or greater.
8. Steep Slopes:
A. A more granular analysis of the slopes between 15-30% is necessary. As such, the applicant shall
revise the Steep Slopes Map for Overall Site (sheet SP-12.0) to differentiate between slopes of
15-20%, 20-25%, and 25-30%. The corresponding map legend shall clearly label what each color
used represents.
B. On the Steep Slopes Map (Parcel 1), sheet SP-12.1, the applicant shall apply a level of
transparency to the proposed building and parking area in order to ensure that the areas of
steep slope disturbance are still visible.
9. Signage: The applicant shall provide as much information as is known regarding how signage will be
handled for the site, such as sign type, location, size, and whether/how it may be illuminated. Advance
consideration should be given to how the signage for the assisted living facility will integrate with other
signage that may be requested as the parent parcel is further developed in the future.
10. Trash Enclosure: The applicant proposes to surround the trash enclosure with aluminum fencing. A
more durable material should be considered for this area as aluminum fencing is easily damaged and
may not hold up over time. Per §154-4. A of the Town zoning code, acceptable materials include “wood
lumber, composite lumber, masonry, concrete or a suitable sturdy material conditioned to withstand
the weather.” Chapter 154 of the Town’s zoning code has additional dumpster enclosure standards that
should be reviewed.
11. Refuse Vehicle Maneuvering: The Parcel 1 Refuse Vehicle Maneuvering Plan (sheet SP-11.2) shows the
truck approaching the dumpsters at an angle versus head-on, calling into question how the truck would
be able to lift the dumpsters. The applicant shall evaluate the proposed design to either confirm its
functionality as proposed, or revise as necessary.
Cc: Dr. Richard Becker, Supervisor Chris Lapine, P.E., Planning Board Engineer
James Creighton, Town Board Liaison VS Construction
Michael Cunningham, Esq., Deputy Town Attorney David Steinmetz, Esq.
Catherine Brosnan, P.E., Assistant Civil Engineer Matthew Steinberg, AICP, DTS
Michael Preziosi, P.E., Director of Technical Services Michael Stein, R.A.
Mark Gratz, P.E., DTS Steve Marino, PWS
Page 21
TO: Town of Cortlandt Planning Board
FROM: Christopher Lapine, PE, LaBella Associates, DPC
DATE: January 20, 2026
RE: 2003 Crompond Road – Evergreen Terrace Parcel 1
LaBella has performed a review of the latest revised site plan application titled “2003 Crompond Road,
Cortlandt Manor, New York, Parcel 1.
The following documents were submitted for our review:
November 20, 2025 Submission
• Response Letter from DTS Provident, dated November 20, 2025
• Submatric Design Calculations For Retaining Walls, dated October 29, 2025
• Stormwater Management Summary Draft – November 20, 2025
• Site Plan Application – Parcel 1 for 2003 Crompound Road prepared by DTS Provident
Design Engineering, LLP.
1. Cover Sheet, Revised November 20, 2025
2. Sheet SP-0.1 – Parcel 1 - Master Site Plan, last revised November 20, 2025
3. Sheet SP-0.2 – Site Removals Plan, last revised November 20, 2025
4. Sheet SP-1.0 – Parcel 1 - Site Layout Plan, ,last revised November 20, 2025
5. Sheet SP-2.0 – Parcel 1 - Site Grading and Drainage Plan, last revised November 20,
2025
6. Sheet SP-3.0 – Parcel 1 - Site Utility Plan, last revised November 20, 2025
7. Sheet SP-4.1 – Parcel 1 - Site Landscape Plan, last revised November 20, 2025 (Review
by Town Planning)
8. Sheet SP-4.2 – Plant List and Planting Details, last revised November, 2025 (Review by
Town Planning)
9. Sheet SP-5.1 – Site Lighting Plan, last revised November 20, 2025 (Review by Town
Planning)
10. Sheet SP-5.2 – Site Lighting Details, last revised November 20, 2025 (Review by Town
Planning)
11. Sheet SP-6.1 – Parcel 1 - Site and Utility Details, last revised November 20, 2025
12. Sheet SP-6.2 – Parcel 1 - Site and Utility Details, last revised November 20, 2025
13. Sheet SP-6.3 – Site and Utility Details, last revised November 20, 2025
14. Sheet SP-6.4 – Site Details – Retaining Walls, last revised November 20, 2025
15. Sheet SP-6.5 – Site Details – Retaining Walls, last revised November 20, 2025
16. Sheet SP-6.6 – Site Details – Retaining Walls, last revised November 20, 2025
17. Sheet SP-6.7 – Site Details – Retaining Walls, last revised November 20, 2025
18. Sheet SP-6.8 – Site Details – Retaining Walls, last revised November 20, 2025
19. Sheet SP-6.9 – Site Details – Retaining Walls, last revised November 20, 2025
20. Sheet SP-6.10 – Site Details – Retaining Walls, last revised November 20, 2025
Page 22
Page 2
21. Sheet SP-6.11 – Site Details – Retaining Walls, last revised November 20, 2025
22. Sheet SP-7.1 – Erosion and Sediment Control Plan, last revised November 20, 2025
23. Sheet SP-7,2 – Erosion and Sediment Control Plan, last revised November 20, 2025
24. Sheet SP-7.3 - Erosion and Sediment Control Details, last revised November 20, 2025
25. Sheet SP- 8.0 – Driveway Profile, last revised November 20, 2025
26. Sheet SP-9.0 – Utility Profiles, last revised November 20, 2025
27. Sheet SP-10.0 -Tree Removals Plan, last revised November 20, 2025 (Review by Town
Planning)
28. Sheet SP-11.0 – Emergency Service Vehicle Maneuvering Plan, last revised November
20, 2025
29. Sheet SP-11.1 – Refuse Truck Turning Movements, dated November 20, 2025
30. Sheet SP-11.2 – Delivery Truck Turning Movements, dated November 20, 2025
31. Sheet SP-12.0 – Steep Slopes Map for Overall Site, dated November 20, 2025
32. Sheet SP-12.1 - Steep Slopes Map (Parcel 1), dated November 20, 2025.
33. Sheet EX1.0 – Existing Conditions Plan, dated November 20, 2025
Our office offers the following comments:
Administrative
1. ALL plans subsequently submitted to the Town for review must be designed for construction
and be complete for review by all regulatory agencies having jurisdiction (e.g. WCDOH,
WCDEF, NYSDEC, NYSDOT, etc.).
2. ALL approvals must be received by regulatory agencies having jurisdiction prior to
commencement of ANY construction activities.
3. It is understood, and Engineer’s Report has been submitted to the Town Department of
Technical Services for review. When received, please provide the Planning Board a copy of
the letter from the Town’s Water Division indicating that the water system has the capacity
to provide finished water storage for the project after all other committed flows.
4. The on-site water supply, with the exception of building lateral, will become a public water
supply. A written request addressed to the Town Supervisor and Town Board must be
submitted by the applicant regarding the water mains. The applicant shall submit a written
request that identifies all utilities and infrastructure proposed for dedication to the town.
This shall also include a Map, Plan and Report (MPR) to the Town for the water facilities.
5. The applicant has indicated they will consider trench stabilization measures as part of the
final design. This comment will remain until addressed.
6. The applicant has provided responses to the comments issued by the fire department. The
fire department should review the most recent submission to determine if the applicants’
responses adequately address their concerns.
Submatric Design Calculations For Retaining Walls, dated October 29, 2025
1. Was a geotechnical report reviewed to aid in the design and selection of the in-situ soil design
parameters, allowable bearing capacity?
2. As indicated in the retaining wall design calculations, has the geotechnical engineer reviewed
the soil parameter assumptions?
3. Has the geotechnical engineer confirmed the foundation soils can safely support the MSE wall
design?
Page 23
Page 3
4. Fence at top of wall is indicated to be 3-ft behind front face of wall(s) and therefore not included
in design. Verify with project team if this is met everywhere. Include additional forces on upper
geogrid if condition is not met.
5. The use of a sleeve-it is mentioned, at these potential locations, do the geogrid lengths need to
be adjusted.
6. Verify if the building foundation imparts loading onto Wall 4B geogrids, no surcharge is included
in the design calculations.
Plans
1. SP-1.0 –Please provide dimensions associated with the setbacks.
2. SP-1.0 – The applicant has indicated they will provide details of the proposed emergency gate
and will be coordinated with the fire code official and included on the plans prior to final
approval.
3. SP1.0 – Shift ADA signage to northern portion of sidewalk so as to not impede sidewalk and
accessible path.
4. SP1.0 - Provide callout for asphalt, curbing, and sidewalk details, and where curbing is flush
with pavement.
5. SP1.0 – Provide maintenance requirements for proposed grass pavers.
6. SP1.0 – Provide door locations.
7. SP-2.0 – Revised the plans to include all proposed topographic lines. It appears proposed
contours are missing from the access and parking areas.
8. SP-2.0 – Spot elevations depict slope in parking lots of less than 1 % on eastern side of the
building, which will create ponding and icing conditions. Please revisit the grading. Additional
catch basins may be warranted.
9. SP2.0 – Provide spot elevations within courtyard area, and top of curb and bottom of curb to
distinguish between flush and standard curbing heights; as well as in ADA accessible areas to
demonstrate compliance with required slopes.
10. SP-2.0 – The secondary walkway has slopes in excess of 18%. Please revisit grading and
provide accommodating slope. How is drainage area captured and directed to the stormwater
management system.
11. SP-2.0 – Provide an outlet for the proposed stormwater planters with detailed information
including sizing and elevations.
12. SP2.0 – The outlet of ES-BM-13 is lower than the bottom elevation of the bioretention basin.
13. SP-2.0 –The retaining wall underdrains on the eastern side of the parcel should not be directed
to stormwater management practices.
14. SP-2.0 – The slope arrows for the proposed driveway is not consistent with the slopes shown
on sheet SP-8.0. Revise the plans for consistency.
15. SP-2.0 - Provide a drainage swale along the top of retaining wall 1.
16. Sp-2.0 – Delineate watershed of roof top for each planter.
17. SP2.0 – Provide pipe size in and out, invert in and out, and rim elevation of underground sand
filter.
18. SP-2.0 – Depict underdrains beneath asphalt pavement on the plans.
19. SP-2.0 – Ponding depth depicted is 0.5-ft as opposed to 1.0-ft shown in report.
20. SP2.0 – Revisit DMH-BM3 rim elevation as it is considerably higher than adjoining grades.
21. SP-2.0 – The 14-foot retaining wall at northwest corner of the building appears imposing
especially below the footprint of the building, Provide terracing of the retaining wall to create
planting pockets for greenery to soften the hard structure appearance on-site at the main entry
to site.
Page 24
Page 4
22. SP-3.0 –A 1,500-gal grease trap has been added to the plans. The applicant should provide
appropriate sizing for grease trap, sampling manhole, and connection to exterior sanitary
system.
23. SP-3.0 – It does not appear sufficient room is provided between the sanitary sewer manholes
BM5 and BM3 and the proposed storm sewer. Revise the plans for constructability.
24. SP3.0 – Maintain 10-ft separation between water line and SMH-BM1.
25. SP4.1 – Confirm placement of 5-foot diameter culvert along Crompond Road will not impact
proposed landscaping.
26. SP-6.2 –Provide a detail for the outlet control structure for all stormwater management
practices (including DMH-BM-3).
27. SP-6.2 – Provide dimensions (length, width, depth) for the riprap outlet protection, as well as
d50 size of stone.
28. SP-6.2 – Provide drainage manhole details for DI BM-6, DI BM-5, and DMH-BM-3 where there
are 5-foot diameter inlet and outlet pipes; stormwater planter; bio-retention; and
underground sand filter detail.
29. SP-6.3 – Provide drop manhole details for BM4 and MA3.
30. SP-6.4 – (sheet 2 of 30) Note 2.4.1. Confirm the project engineer verified the loading
conditions. The wall design indicates no building foundation loads were considered.
31. SP-6.4 – (sheet 2 of 30) Note 2.6.1 indicates a maximum allowable bearing of 3,500 psf is
required. Confirm this value aligns with the geotechnical report.
32. SP-6.4 – (sheet 3 of 30) Confirm limits of disturbance allows for safe excavation for the
indicated geogrid lengths (e.g. tiered RWs 1 and 2 are being constructed into a hill side).
33. SP-6.4 – (sheet 3 of 30) Wall 3 is set back 5-ft from property line and has a geogrid length of
9 feet and 1-foot of drainage stone. Revise property line or design. .
34. SP-6.4 – (sheet 4 of 30) Shows a wall drain discharging into the basin. This conflicts with
general note 1 on sheet SP-6.4 (wall drain shall not discharge to any stormwater treatment
practice).
35. SP-6.5 – (sheet 8 of 30) Geogrid length for RW1F should be adjusted to L=17 feet per design
calculations and as indicated on callout (sheet 9 of 30).
36. SP-6.9 – (sheet 23 and 24 of 30) RW design case 5B should be referenced with
corresponding geogrid length.
37. SP-6.9 – (note 2 on sheet 25 of 30) Note 2 states the use of a sleeve-it is indicated if a fence
post is to be set directly behind the wall units. Provide a detail for the sleeve-it indicating
embedment/placement within the geogrid.
38. SP-6.9 – (sheet 25 of 30 No footing drain is identified in the crushed stone zone directly
behind the segmental block units. Verify this is the design intent.
39. SP-6.10 –(sheet 26 of 30) Upper tier walls are shown to discharge onto grade supported by
lower tier wall. Verify lower tier design considers additional water into reinforced zones.
40. SP-6.10 – Typical details for geogrid around utilities (e.g. catch basins) and if utility lines are
within the reinforced zone should be provided.
41. SP7.1 – Provide a construction sequence detailing the implementation of erosion and
sediment control measures prior to the start of construction. The current work schedule
provided needs to be expanded to include the phasing of specific project improvements.
42. SP-7.1 – Provide additional silt fence around the northern edge of material stockpile 1 to
protect all downhill areas.
43. SP-7.1 – Consideration of interim erosion and sediment control measures should be
considered to allow the construction of the retaining walls.
44. SP-7.1 – The outlet of the sediment traps 1 and 2 should be depicted on the plans.
45. SP-7.1 – Provide the locations for the dewatering/ washout pits
Page 25
Page 5
46. SP-7.1 – Provide the following:
a. Provide pipe sizes on sediment trap detail and provide size and spacing of riser pipe
perforations in accordance with the NYSSSESC.
b. Provide maintenance schedule and requirements for practices.
47. SP-7.1 - The plans show an arrow that appears to depict a temporary swale between two
dewatering pits. This swale appears to be directed uphill. The applicant should review the plans
and confirm the direction of this swale.
48. SP7.1 – Provide NYSDOT approved for Sediment Trap 3 discharge connection to their
drainage.
49. SP-8.0 – Driveway grades are inconsistent with proposed contours and spot elevations shown
on Sheet SP-2.0.
50. SP-9.0- Hydrant stationing has not been provided on sheet SP-9.0 There are two hydrants
shown between station 2+00 and 5+00 without stationing.
51. SP-11 –The fire department having jurisdiction will need to opine on the proposed fire access
layout.
52. SP-11.1 – The revise refuse truck turning plan demonstrates the vehicle can’t access the
refuse containers for front loading. Revise the plan to show the proposed vehicle accessing
and loading refuse at this location.
Stormwater Management Summary Draft – November 20, 2025
1. Provide SWPPP which is compliant with the NYS DEC SWDM and the GP-0-25-001 and adheres
to the Findings Statement of the Medical Oriented District (MOD) adopted March 20, 2023.
2. The applicant should confirm that the existing conditions watershed map matches the
previously submitted plans for the evergreen manor road to be dedicated to the down. On the
map shown there are discrepancies in watersheds and impervious areas. For example,
existing conditions DA-2 has an impervious area of 0.05 acres and proposed conditions has
an impervious area of 0.0 acres. Neither appears to be accurate based upon the amount of
impervious delineated in the watershed mapping. Additionally, the existing driveway and
dwellings are removed as part of as part of the Subdivision plans and their impervious area is
included in the pre-development watershed area for Parcel 1.
3. The applicant should review the post-developed conditions map for consistency with the rest
of the plans. The following discrepancies have been noted:
a. The stormwater routing shown does not match what is shown on SP-2.0 and does not
include the proposed stormwater management practices. For example, the 60-inch
detention pipe is shown as 240-lf of 60-inch diameter on a flat slope at elevation of
352.04; where Sheet SP-2.0 delineates 3 sections of pipe set at different elevations
with a 0.5% slope.
b. The site layout on the drainage study does not fully match the site plan set.
4. The post-developed map should be revised to indicate which areas are directed to specific
treatment practices and areas delineated.
5. The existing bio-retention area associated with main access road has a different outlet invert
and pipe size in HydroCadd model than in Evergreen Manor Main Access Report. Please
correct.
6. Provide sizing calculations for each stormwater management practice and sediment trap
based on the area directed to it for treatment. Sizing calculations shall be based on the NYS
DEC SWDM criteria.
7. Provide the results of the soil testing to support bio-retention infiltration design.
Page 26
Page 6
8. Time of concentration for drainage area for Pre-1E should match the same condition as the
drainage model for the subdivision,
9. The HydroCAD model should be revised to include the proposed stormwater planters.
10. The HydroCAD model shows an increase in peak flows at design point 2 and 3, as a result of
the proposed project, the applicant should review these areas and revise the model as
needed.
11. The HyrdoCAD model should include detention calculations to show how the CPv is provided.
12. Per Part III.A.2. of the GP-0-25-001, describe how the project considers future physical risk
due to climate change.
13. Provide a draft maintenance agreement for post development stormwater management
practices for review by the Town Attorney.
14. One foot ponding included in model for stormwater practice, and only 0.5-ft shown on plans,
Please rectify.
15. The wetland adjacent to Crompond Road and its outlet should be modeled as DP1.
Page 27
January 21, 2026
Hon. Steven Kessler
Chairman of the Town of Cortlandt Planning Board
and Members of the Planning Board
1 Heady Street
Cortlandt Manor, New York 10567
Re: VS Construction Corp. – Evergreen Manor Parcel 1 – Assisted Living Facility
2003 Crompond Road (PB 2025-5)
Dear Chairman Kessler and Members of the Planning Board:
On behalf of VS Construction Corp and in connection with the Evergreen Manor Parcel 1 Assisted
Living Facility Site Plan we offer the following responses to comments received from the Westchester
County Planning Board, dated January 13, 2025.
Pedestrian Circulation
1. Comment: We appreciate that the applicant indicates that a sidewalk is proposed along
the street frontage for the other sections of the Evergreen Manor development,
which would provide a safe pedestrian connection from the development to
points west, including the Hospital. However, while sidewalks are proposed
within Parcel 1 to connect the building to the parking area, as well as a
connection to the other sections of Evergreen Manor, we note that the street
sidewalk does not continue along the Parcel 1 frontage, and additionally the
proposed building is oriented away from both Crompond Road and the
proposed new street. While we understand that assisted living facilities involve
special security concerns regarding access to the building, such concerns should
not preclude pedestrian infrastructure for employees and visitors, as well as for
pedestrians wishing to pass along the street. We recommend that the sidewalk
fronting Crompond Road be extended along the full frontage of the proposed
Parcel 1, in order to provide safe pedestrian access within the neighborhood
and establish a means for future sidewalk extensions east along Crompond
Road.
Page 28
Chairman Kessler and Members of the Planning Board January 21, 2026
Re: Evergreen Manor Parcel 1 - ALR Site Plan Page 2
We also recommend that the Town considers establishing a full crosswalk
network at the intersection of Crompond Road and the proposed new
street/Conklin Avenue. The proposed Evergreen Manor development as a whole
will increase the number of residents in the area, and safe pedestrian access is
an important consideration in order to provide full access to the sites. We note
that the nearest crosswalk is located a half-mile from the Conklin intersection,
which bypasses the Hospital and the nearest BeeLine bus stops, and does not
allow for safe crossing to the small commercial cluster on Taylor Avenue.
Including a full pedestrian crosswalk system at this intersection would benefit
not only future residents of Evergreen Manor, but also existing residents of the
surrounding neighborhood.
Response: The proposed sidewalks are consistent with the proposed action reviewed
during the SEQR process to provide pedestrian accessibility within the
Medical Oriented District (MOD) between the Evergreen Manor site and the
New York-Presbyterian Hudson Valley Hospital (NYPH). As part of the off-
site roadway improvements, new crosswalks are proposed at the intersection
of Route 202/35 (Crompond Road) and the Gyrodyne driveway/NYPH
entrance driveway at all approaches. Additionally, new crosswalks are
proposed at the intersection of Crompond Road and Lafayette Avenue on
the northbound and eastbound approaches.
Construction Within a Regulated Stream/Wetland Buffer
2. Comment: The proposed development involves disturbance within a wetland buffer area.
The County Planning Board consistently recommends that construction and
alteration of land within regulated wetlands and stream/wetland buffers
should be avoided. This recommendation extends to the siting of stormwater
management facilities. We note that the impacts to the wetlands were
discussed during the Environmental Impact analysis, and the Town
determined that the proposed mitigation measures were sufficient to offset the
proposed encroachment. We recommend that the Town and the applicant
continue to work to ensure that sufficient measures are maintained within the
landscaping plan to fully mitigate the disturbance to the wetland buffer.
We note the regulations for stream and wetland permitting through the NYS
DEC have recently been updated. The applicant should submit a Parcel
Page 29
Chairman Kessler and Members of the Planning Board January 21, 2026
Re: Evergreen Manor Parcel 1 - ALR Site Plan Page 3
Jurisdiction Determination application to NYS DEC to identify any required
permits for the proposed project. More information can be found at the NYS
DEC website: https://dec.ny.gov/nature/waterbodies/wetlands/freshwater-
wetlandsprogram/freshwater-wetland-jurisdictional-determination.
Response: The proposed wetland mitigation is being coordinated with the Town. It is
the Applicant’s understanding that the new regulations would not currently
apply to the Project in accordance with 6 NYCRR Part 664, as it did not
require a JD prior to January 1, 2025, and has a Final Environmental Impact
Statement for the project which has been accepted by a lead agency pursuant
to Part 617 of this Title prior to January 1, 2025.
Transportation Demand Management
3. Comment: We note that 66 parking spaces are to be provided on the site, yet the zoning
code requires only 59 spaces. Ensuring that the transportation needs of
residents, employees, and visitors are accommodated through means other than
private automobiles is an important factor in reducing the dependency on
private vehicle trips and lessening the impact of excessive parking spaces. The
County’s Transportation Demand Management Toolkits provide strategies for
municipalities, employers, and developers to reduce the need for single-
occupancy vehicle commutes, which could help avoid the need to park private
vehicles. We recommend that the Town and applicant review these Toolkits,
which can be provided by the Planning Department, to ensure transportation
needs are met while reducing the space set aside for vehicles. The County’s
Smart Commute Program can also assist employers to implement TDM
strategies.
Response: The Applicant has reviewed the County’s Transportation Demand
Management TDM) Toolkit. There are two existing bus stops within a half
mile of the proposed project near Crompond Road at NYPH (serving Bee
Line Bus Route 18) and Crompond Road at Buttonwood Road adjacent to
the Gyrodyne driveway (serving Bee Line Bus Route 16). Together, these
bus routes provide access to Peekskill Metro-North Rail Station along with
downtown Peekskill and other commercial shopping centers within
Cortlandt, Yorktown, Somers and Mahopac. As suggested by the TDM
Toolkit, the Applicant can post bus information for the benefit of its
residents, staff and guests.
Page 30
Chairman Kessler and Members of the Planning Board January 21, 2026
Re: Evergreen Manor Parcel 1 - ALR Site Plan Page 4
Additionally, as discussed in response to Comment 1, off-site traffic
improvements include the installation of new sidewalks and crosswalk, which
will improve the pedestrian experience and connectivity within the MOD.
As part of the site plan review process, the Applicant will continue to evaluate
its proposed parking to provide a sufficient number of parking spaces to
accommodate its program and meet the minimum required parking.
NYS DOT Review
4. Comment: Crompond Road (US Route 202/NYS Route 35) is a State highway. The
Town should forward a copy of the application to NYS DOT to identify any
required permits for the proposed project and to evaluate potential traffic
impacts to Crompond Road.
Response: Comment noted. Highway Improvement Plans are currently under review by
the NYSDOT as part of its review of the proposed development in the
MOD, including the proposed project.
Bee-Line Bus Stop
5. Comment: We note that the full Evergreen Manor development plan may increase
ridership of the Bee-Line bus system as new uses are constructed on the site. As
the current closest bus stops are located in front of the Hospital, (as noted
above without the benefit of a crosswalk to connect the eastbound and
westbound stops), the Town and the applicant should contact the County
Department of Public Works and Transportation to discuss the possibility of
installing a new bus stop at the corner of Conklin Avenue and Crompond
Road.
Response: The Applicant will contact Westchester County DPW&T to discuss bus stop
locations. It is noted that the existing bus stop at the Gyrodyne driveway,
located within approximately 0.3 miles of the project site, will be improved as
part of the off-site roadway improvements. Additionally, the new sidewalks
from the Evergreen Manor project site will be constructed along Crompond
Road to provide improved access to the bus stop.
Page 31
Chairman Kessler and Members of the Planning Board January 21, 2026
Re: Evergreen Manor Parcel 1 - ALR Site Plan Page 5
Bicycles and Personal E-Mobility Devices
6. Comment: We encourage the applicant to include a bicycle parking area for visitors and
employees in order to provide full parking options within the site. We also
recommend that the applicant includes a power supply for the charging of e-
bicycles within this bicycle parking area.
Response: Comment noted. The Applicant will continue to review with the Town.
Stormwater Management
7. Comment: We appreciate that the applicant proposes to install a bioretention basin and
utilize permeable pavement within the emergency access driveway, which will
provide on-site stormwater management within the property. We encourage
the applicant to explore additional at-grade stormwater management
solutions that treat runoff on-site wherever possible, such as using pervious
paving for parking areas, or the installation of vegetative rain gardens within
the landscaped areas.
Response: Comment noted.
Sewage Flows
8. Comment: The proposed development will increase sewage flows from this site into the
existing sewage infrastructure. This increased flow will add to the volume of
sewage flow requiring treatment at a Water Resource Recovery Facility
operated by Westchester County. Since 2010, it has been the policy of the
County Planning Board that municipal governments should require
applicants to identify mitigation measures that offset projected increase in
flow, in order to comply with the County Environmental Facilities Sewer Act.
The best means to do so is through reductions in inflow/infiltration (I&I) at a
ratio of three for one for market rate units and a ratio of one for one for
affordable units.
The County Planning Board further recommends that the Town implement a
program that requires inspection of sewer laterals from private homes for leaks
and illegal connections to the sewer system, such as from sump pumps. These
private connections to the system have been found to be a significant source of
avoidable flows. At a minimum, we encourage the Town to enact a
requirement that a sewer lateral inspection be conducted at the time property
Page 32
Chairman Kessler and Members of the Planning Board January 21, 2026
Re: Evergreen Manor Parcel 1 - ALR Site Plan Page 6
ownership is transferred and any necessary corrective action be enforceable by
the municipal building inspector.
Response: The Applicant is coordinating with the Town of Cortlandt regarding I&I
reduction measures.
Recycling
9. Comment: The Town should require the applicant to verify that there is sufficient space to
accommodate the storage needs for recyclables under the County’s recycling
program. County regulations for recycling may be found at:
https://environment.westchestergov.com/recycling.
Response: The proposed refuse enclosure has been designed to accommodate two 6-
foot-wide dumpsters (up to 8-yard capacity each) that will provide sufficient
capacity to store recyclable materials in compliance with the County’s
regulations for recycling. Recycling will be collected on a weekly basis, at a
minimum.
Green Building Technology
10. Comment: We encourage the applicant to include as much green, or sustainable building
technology as possible within the proposed development. We note that no
indication has been provided towards the utilization of the rooftop. We
recommend that the applicant consider incorporating a solar array or a green
roof in order to provide further environmental remediation within the site. In
addition, the Town and the applicant should give consideration towards the
provision of electric vehicle parking capabilities within the proposed parking
area.
Response: The proposed building will be designed to comply with the latest applicable
energy codes. The Applicant will continue to review with the Town.
Universal Design
11. Comment: We encourage the Town to consider the principles of universal design in this
development, in addition to any building standards required by ADA
regulations. Universal Design standards allow all residents and visitors to
fully engage in our public and residential spaces. Universal Design is also an
important means of enabling household residents to age in place, as well as to
Page 33
Chairman Kessler and Members of the Planning Board January 21, 2026
Re: Evergreen Manor Parcel 1 - ALR Site Plan Page 7
provide accessible pedestrian access and parking for persons with mobility
issues.
Response: Comment noted.
We look forward to continuing our review of this application with the Planning Board.
Very truly yours,
DTS PROVIDENT DESIGN ENGINEERING, LLP
Matthew N. Steinberg, AICP
Senior Associate
Enclosure(s)
cc: D. Steinmetz, VS Construction, Benchmark Senior Living
Page 34
Brad K. Schwartz
bschwartz@zarin-steinmetz.com
January 21, 2026
By E-mail and Overnight Mail
Hon. Steven Kessler
Chairman of the Town of Cortlandt Planning Board
and Members of the Board
1 Heady Street
Cortlandt Manor, New York 10567
Re: 70 Roa Hook Realty LLC – Application for Site Plan Approval
Dear Chairman Kessler and Members of the Town Board:
We make this application on behalf of 70 Roa Hook Realty LLC, the owner of 70 Road
Hook Road, for Site Plan Approval to permit parts sales and service/repair of Peterbilt trucks at
the property (our client is no longer seeking to separate the approvals for these operations). Our
client is excited about bringing Leal Peterbilt to Cortlandt. Leal Peterbilt is a commercial Peterbilt
truck dealership and service provider based in New York, with locations throughout the greater
New York City region. We request placement on the Planning Board’s February 2 agenda for a
presentation and to formally begin the review process.
As brief background, in November 2017, the Planning Board issued site plan and other
approvals for a car wash at the property. The building was mostly constructed, but a certificate of
occupancy was not issued pending completion of certain punch list items. The car wash project
stalled and never started operations.
Our client purchased the property in 2025 with the intent of modifying the previously
approved building and site improvements to accommodate Leal Peterbilt of Westchester. Some of
these modifications include increasing the size of the service bays to accommodate trucks, adding
bays and removing a portion of the existing building, an addition to the building, and new parking
configuration to facilitate truck turning movements.
The following materials are being submitted through the OpenGov portal:
• Project Description – describing the operations of Leal Peterbilt of Westchester,
including anticipated daily traffic and parking activity
• Short EAF
• Site Plans, prepared by John J. Gilchrist Architect
Phone: (914) 682-7800 www.zarin-steinmetz.com 81 Main Street, Suite 415
Direct: (914) 220-9793 White Plains, New York 10601
Page 35
Town of Cortlandt Planning Board
January 21, 2026 | Page 2
• Topographic Survey, prepared by Rowan Land Surveying, PLLC, dated January
15, 2026
Our consultant team is also working on other items, including an updated traffic/parking
report by Kimley-Horn (John Canning, PE), confirming certain drainage improvements with
NYSDOT, and confirming prior well and septic approvals with Westchester County DOH. We
want to begin the application process to receive the Planning Board’s initial feedback, knowing
that all this and any other additional information requested by the Board and Staff will be provided
during the process.
Thank you for the Board’s attention.
Respectfully submitted,
ZARIN & STEINMETZ LLP
By: ____Brad Schwartz ___
Brad Schwartz
cc: Michael J. Cunningham, Esq.
Chris Kehoe, AICP
Heather Lavarnway, CNU-A, AICP
Chris Lapine, PE
Leal Peterbilt Team
Page 36
January 15th, 2026
Leal Peterbilt of Westchester (LPW)
70 Roa Hook Rd, Cortlandt Manor NY 10567
Scope of business and activities.
General Overview of Leal Peterbilt (not Cortlandt specific)
Leal Peterbilt is a commercial Peterbilt truck dealership and service provider based in New York,
serving the greater New York City region including Queens, Staten Island, Long Island, Bronx, Yonkers
and Westchester.
Our core scope of business and activities centers on supporting customers in buying, servicing,
and maintaining Peterbilt brand trucks and related equipment.
Primary Business Activities
New and Used Truck Sales
The dealership sells new Peterbilt commercial trucks—heavy-duty vehicles primarily used in
freight hauling, construction, and other industrial transport sectors—as well as pre-owned trucks
for customers looking for more budget-friendly options.
Parts and Accessories
Leal Peterbilt stocks and sells genuine Peterbilt parts and accessories, which are critical for
continuing maintenance, upgrades, or repairs of commercial trucks.
Service and Maintenance
We provide truck servicing and repair work, often including routine maintenance, diagnostics,
and warranty or post-warranty repairs to keep fleets running efficiently.
Support Services
In addition to sales and maintenance, offerings typically include financing support,
rentals/leasing, and possibly or service contract options, helping customers manage truck
ownership costs and uptime.
Overview of Leal Peterbilt of Westchester (Cortlandt specific)
Daily activities. Here’s a clear picture of the typical daily activities expected at LPW.
Hours of Operation
Monday to Friday from 7 am to 5 pm. Saturday from 8 am to 12 pm. Sundays Closed
Leal Peterbilt
101 Union Ave, Ronkonkoma, NY 11779
Page 37
Truck Sales.
95% of our trucks sales are conducted at customers’ locations where our sales professionals can
understand the customers’ operations and needs. As a result, they recommend truck models and
configurations, providing pricing and financial options.
Occasionally we will enjoy a potential buyer as a walk in, or a curious person that would like to see
and feel a new truck, but those are few and rare. Typically, we do not keep stock trucks for retail sales;
most of our trucks come in from the factory, they get prepped and they are picked up by the final user
within a week. However, we could potentially keep one or two dump trucks for display since it
projects a beautiful and elegant look to the location.
For the first year or so, LPW will employ one person for Truck Sales. Since all our truck sales contracts
are electronic, such person will operate from his home office mainly. However, we expect him/her to
visit the dealership and make sure that the trucks sold are being prepped accordingly.
Parts Sales & Inventory Management
Thanks to AI, most of our parts sales are done either through phone orders or online (ecommerce).
Some of our most efficient Outside Sales Personal work from home. Our phone lines are forwarded
to our parts salesman cellphones. However, from time to time our parts team assists customers at
the parts counter. Maybe once a day.
LPW parts personnel receive truck replacement parts early in the morning (around 4-5am by box
truck) and before noon (around 10-11am by Fed Ex, UPS or comparable vans). We accommodate the
parts received either in the warehouse or directly inside our parts delivery van. The parts delivery van
will leave our site early in the morning, no later than 8 am and run the delivery route. If necessary, we
will run a second route after 11 am. In other words, our delivery van (usually a Ford Maverick or
similar) will run in and out of the location twice a day.
Service & Repairs
LPW is planning to run 7 bays for service. Trucks come in for warranty work and larger repairs. We do
not provide maintenance service or repairs on trailers. Exclusively on Trucks.
There will be 3 technicians at max capacity, perhaps in 14 to 16 months, including one Service
Manager / Foreman who will communicate with customers on scheduling, updates, service needs,
cost estimates, and time to completion.
Once a truck is brought to our facility, it could stay for service for a day or a few weeks, depending on
the diagnosis, the repair and the ability to source the parts.
Leal Peterbilt
101 Union Ave, Ronkonkoma, NY 11779
Page 38
We hope to have at least two turns per service bay per month. In other words, we are planning to have
14 trucks to come in and out of the shop per month.
As mentioned before, we do not allow trailers inside our locations. Not for parking, not for dropping
off. Our customers know that. We only allow dump trucks, concrete mixer trucks, garbage trucks,
oil and fuel trucks, roll offs, box trucks, conventional sleeper tractors and day cab tractors. The
largest length of any of these vehicles to be serviced will be less than 30 Ft.
We expect that some customer trucks will be parked outside the service bays waiting for a bay to be
available for maintenance. No more than 7, one truck on cue per service bay.
Back-Office & Administration
Administrative work. Billing or invoicing will be done at the location. Payroll, filing warranty claims,
updating customer records, and preparing reports is done remotely at our Staten Island location.
Once per week a Senior Manager of our team will be visiting the LPW store to review goals,
priorities, training, inventory and anything else needed to run the business accordingly.
Some vendors also like to stop by and support the stores. Usually once a month in most cases
that a vendor like Cummins, Eaton, Paccar Parts or similar will stop by, scheduled, and work a
training session with a member of our team.
In closing
Employees at location
For Parts Sales. 2 counter and one delivery.
For Service. 3 Techs and one Manager
Vehicles in and out at location
Two deliveries from vendors (by box trucks and vans), one at 4-5 am and one at 10-11 am.
One delivery truck (Ford Maverick or similar) will come in and out twice a day.
Achieving the expected rotation in service, 14 trucks per month.
Occasionally one senior manager visits per week and one vendor visits per month.
Leal Peterbilt
101 Union Ave, Ronkonkoma, NY 11779
Page 39
Short Environmental Assessment Form
Part 1 - Project Information
Instructions for Completing
Part 1 – Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on
information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as
thoroughly as possible based on current information.
Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the
lead agency; attach additional pages as necessary to supplement any item.
Part 1 – Project and Sponsor Information
Name of Action or Project:
Leal Peterbilt of Westchester
Project Location (describe, and attach a location map):
70 Roa Hook Road, Cortlandt Manor, NY 10567
Brief Description of Proposed Action:
Site Plan Approval for certain site improvements and building modifications to facilitate parts sales and service/repair of Peterbilt trucks.
Name of Applicant or Sponsor: Telephone:
70 Roa Hook Realty LLC E-Mail: mauricio.leal@peterbiltnyc.com
Address:
8 Dora Lane
City/PO: State: Zip Code:
Holmdel NJ 07733
1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, NO YES
administrative rule, or regulation?
If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that
✔
may be affected in the municipality and proceed to Part 2. If no, continue to question 2.
2. Does the proposed action require a permit, approval or funding from any other government Agency? NO YES
If Yes, list agency(s) name and permit or approval:Planning Board Site Plan Approval, WCDOH Septic & Well, NYSDOT
Drainage ✔
3. a. Total acreage of the site of the proposed action? __________
0.6442 acres
b. Total acreage to be physically disturbed? __________
0.05 acres
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor? __________
0.6442 acres
4. Check all land uses that occur on, ar adjoining r near the proposed action
Rural (non-agriculture) ndustrial ✔ Commercial Residential (suburban)
Agriculture a r
Page 1 of 3 SEAF 2019
Page 40
5. Is the proposed action, NO YES N/A
a. A permitted use under the zoning regulations?
✔
b. Consistent with the adopted comprehensive plan? ✔
NO YES
6. Is the proposed action consistent with the predominant character of the existing built or natural landscape?
✔
7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? NO YES
Hudson River, Reason:Exceptional or unique character, Agency:Westchester County, Date:1-31-90
If Yes, identify: Annseville
________________________________________________________________________________
Creek
✔
NO YES
. a. Will the proposed action result in a substantial increase in traffic above present levels?
✔
b. Are public transportation services available at or near the site of the proposed action?
✔
. Are any pedestrian accommodations or bicycle routes available on or near site of the proposed
action?
✔
9. Does the proposed action meet or exceed the state energy code requirements? NO YES
If the proposed action will exceed requirements, describe design features and technologies:
_____________________________________________________________________________________________
✔
_____________________________________________________________________________________________
10. Will the proposed action connect to an existing public/private water supply? NO YES
If No, describe method for providing potable a r: _________________________________________
Private Well ✔
_____________________________________________________________________________________________
11. Will the proposed action connect to existing wastewater utilities? NO YES
If No, describe method for providing wastewater treatment: ______________________________________
On-site septic system. ✔
_____________________________________________________________________________________________
. a. r nan r b an a n ab n ar a a r r NO YES
n a na r a r r a r a a b n r n b
n r ar r a n an r r r a n b b r n n ✔
a r r a
✔
b. r r an r n a n ra a n an ar a na a n r
ar a a n a r r r a n ar a a n n r
. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain NO YES
wetlands or other waterbodies regulated by a federal, state or local agency?
✔
b. Would the proposed action physically alter, or encroach into, any existing wetland or waterbody?
✔
If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: _____________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
Page 2 of 3
Page 41
4. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply:
Shoreline Forest Agricultural/grasslands Early mid-successional
Wetland ✔ Urban Suburban
15. Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or NO YES
Federal government as threatened or endangered?
✔
16. Is the project site located in the 100-year flood plan? NO YES
✔
NO YES
17. Will the proposed action create storm water discharge, either from point or non-point sources?
If Yes, ✔
a. Will storm water discharges flow to adjacent properties? ✔
b. Will storm water discharges be directed to established conveyance systems (runoff and storm drains)? ✔
If Yes, briefly describe:
_____________________________________________________________________________________________
On site stormwater will discharge into an existing system that conducts stormwater under Route 9 and into Annseville Creek.
_____________________________________________________________________________________________
18. Does the proposed action include construction or other activities that result in the impoundment of water NO YES
or other liquids (e.g. retention pond, waste lagoon, dam)?
If Yes, explain purpose and size n n
✔
____________________________________________________________________________________________
_ Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste
19. NO YES
management facility?
If Yes, describe: _______________________________________________________________________________
✔
_____________________________________________________________________________________________
20.Has the site of the proposed action or an adjoining property been subject of remediation (ongoing r NO YES
completed) for hazardous waste?
If Yes, describe: _______________________________________________________________________________
✔
_____________________________________________________________________________________________
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF
MY KNOWLEDGE
Applicant/sponsor name: John J Gilchrist Architect PC ______________________ Date: 1-21-2026
__________________________
_____________________
Signature: _____________________________________________________ Architect
PRINT FORM Page 3 of 3
Page 42
JOHN J
GILCHRIST
Zoning Schedule
AWE-2 Annsville Waterfront Enhancement District Ordinance Proposed
Sign Summary ARCHITECT
M.U.T.C.D. Specification
Number
Desc. A Professional Corporation
(a) Minimum Lot Area 7,500 28,061 Width Height
(b) Minimum Lot Width 50 173 Table of Required
R1-1 30" 30"
(c) Maximum Building Coverage 30% 24.1% Permits
(d) Yards 10 44 1. Town of Cortlandt Site Plan
R3-2 24" 24" Approval, Steep Slope Permit, Tree
Required Front Yard 10 166.8
9' Removal Permit & Building Permit
"E
05'00 2. Westchester County Department
Required Side Yard 10 16.1 West/30.1 East NO N49° HAL
T of Health Well & Septic approvals
ASP
R7-1 12" 18" PARKING 3. New York Department of
Required Rear Yard 10 32.8 ANY
TIME Transportation Road Opening
Permit
(e) Maximum Height (stories) 2.5 1 5
3 2 .8 '
(f) Maximum Height (feet) 35 30 R7-8 12" 18" Index
2 4 .0 '
one story addition
5
34.6'
376 sq ft
1. Zoning Plan
2. Site Plan
R8-31 T
Existing Floor Area 4,649 HAL
T
3. LandscapingMEN Plan
S27°24'00"E
12" 6" ASP
CNC.
4. ED
EPART
CU Building Plans & Elevations
TIV
Additions 2,107 EXE
12" 6" TRAVELED 16.1'
30.1' NYS
N/F 22.15-
TAX
#
2 -1
Total Building Area 6,756 WAY
40.0'
7:00 AM TO
162.08'
9:00 AM
R8-3hP 24" 18" 20.0' 10.0'
CNC.
&
Employees 6 4:00 PM TO
6:00 PM
WEEKDAYS
Total 6 NO
one story addition
CNC.
PARKING CNC.
R8-31 12" 18" FIRE
LANE
1,731 sq ft
1 STORY
STRUCTURE #70 CNC.
16.1' 18.0' 98.0' 30.1'
34.1'
N/F NYS EXECUTIVE DEPARTMENT
R8-31 portion of building to remain
ASPHALT
3,359 sq ft
54.0'
38.4'
AREA=28060.8445±SQ.FT.
ACRES=0.6442±
TAX#22.20-2-1
CNC.
CNC.
E 1–22-26 for review JJG
4"
2 STORY
R 15'
N27°24'00"W 190.08'
'2
0 '
sign per schedule portion of building to be removed °1 .89
2 9-29-25 for review JJG
N2 60
NYS DISK
R8-31 1,290 sq ft FOUND
F O UND Date Issue Initial
5 0 .6
58.0' P.
IPE
N P OF PRO T
O HAL
R3-2 "No Left Turn"
'
I R E P
Zoning Plan
' N S
0.66 NER A
ASPHALT
4" wide white epoxy paint
OF
30.0'
E
44'
striping typical R ED G
CO
flanged channel
post per NYSDOT TRAVELED
WAY
New Sales & Service Building
W
7'-0"
new 3' x 8'freestanding business
'24" for
identification sign °07
S43
11 2.78
' FO
GL
INE SB R3-2 "No Left Turn"
NB
Leal Peterbilt
LINE 70 Roa Hook Road
7 FOG
Town of Cortlandt
SB
1 NB Westchester County
R7-8 "ADA Parking" New York
IRON ROD "W Lot 1 Block 2 Section 22.20
FOUND ON 2 '22
4°5 0'
PROP. CORNER S3 63.2 NB
OAD
R
T SB OOK NB
H AL
A H IDG
E
R3-2 "No Left Turn"
RO
P R
F AS L EB NYR7-5P "7 AM - 9 AM
O IL
GE E9 SV 4 PM - 6 PM WEEKDAYS"
T D UT -ANN
AL E SB R O LL Note: If safety or operational issues arise the
PH US KSKI time restriction on NB left turn entering may
AS TRY E
PE . 185
0)
be removed & all left turns prohibited
12" concrete EN Y H
footing 36" below WA (S.
grade - 3,000 psi @
28 days NB PLAN
Zoning Plan NORTH
INE
SB NB GL
FO Scale: 1" = 20.0'
PQ E
G
LIN
R EEK 0 10' 20' 40' NY 024343-01 exp 03-31-2027
FO SB C
Traffic Sign Detail Prepared with information taken from It is a violation of the law for any person, unless
IL LE acting under the direction of the licensed architect,
EV
"Property Survey & Topography 70 Roa Hook
C. S
to alter any item in the plans, specifications or
N
CO RB AN N Rd (US RT 9) Cortlandt Manor, New York reports to which the seal of the architect has been
applied in any way. If an item bearing the seal of an
Prepared for Steven Auth" by Rowan Land
CU NB architect is altered, the altering architect shall affix
Surveying, PLLC dated October 14, 2017 to this item the seal and the notation "altered by"
followed by the architect's signature and the date of
AL such alteration and a specific description of the
MET D
NB U AR alteration.
G
L
RAI
IL
U AR
D
RA
existing 45MPH SPEED LIMIT
sign to be relocated 250' east
John J Gilchrist
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp.,
GEBCO, USGS, FAO , NPS , NRCAN, G eoBase, IGN, Kadaster NL,
Ordnance S urvey, Esri Japan, METI, Esri China (Hong Kong),
ME
TAL
G
Architect
swisstopo, MapmyIndia, © O penS treetMap contributors, and the GIS A Professional Corporation
User Community
8 Coach Lane
Site Location Plan Upper Saddle River
SCALE: 1" =100'
New Jersey 07458
Phone 201 573 1877
JJGAPC@gmail.com
Peterbilt
1" = 20.0'
1 of 5
250311
Page 43
N/F NYS EXECUTIVE DEPARTMENT
25.1
JOHN J
CLEARED TAX# 22.15-2-1
GRAVEL
AREA
GILCHRIST
General Notes 20 17 ARCHITECT
20
25
a. Prior to any construction beginning, the Applicant shall obtain a building 28.6
22.8
A Professional Corporation
20
permit administered through the Department of Technical Services – Office of 18.3
Code Enforcement.
16.6 15.2
PQ
b. Prior to the issuance of a building permit, the Applicant shall submit all third 36.4
27.2
16
party permits and approvals.
14.5
35
15
c. The Applicant shall organize a pre-construction meeting with representatives 33.2 14.6
17
34.6 30 19.0
16
34.8
of the Town of Cortlandt and NYSDOT. 15.6
IRON ROD
15
34 16.6
FOUND ON
25 PROP. CORNER 13
d. Prior to the issuance of a building permit, the Applicant’s Contractor shall 20 IR F 14
15.3 I
RF
submit a clearing and grading stakeout sketch as prepared by a licensed 30
15.7
1.2' 15.6 13.7
15.1 15.2
professional land surveyor that shall delineate the approved work area. All silt 0.3' dumpster & recycling area
10'
27.8 15.4 15.7
fencing shall be installed along this line and proper erosion and sedimentation 10'
26
25.6 22.5 17.4
15.5 garbage & recycling is the responsibility
12 of
9' 14.9 14.9 U
25
controls shall be installed and inspected. 166.8
WELL
22
the Owner through private carting services 17.7
00"E
9°05'
15
15
12
N4
CC 14.6
e. No construction debris or recycled material is permitted on site. All imported 15.2 HAL
T domestic water well
24.6 17 ASP
25
to well
10
14.8 15.4
fill shall be laboratory tested and determined to be clean fill in accordance with 20 X CC 15.7 15.6
new bollards per detail9.7
applicable NYSDEC guidelines for residential and commercial fill. 24.8 16.2 A
CRW
0.7'
14.3 CC 12.6
15.2
5
1.36' RIM:14.41' 12.5
B
i n i mu m
IRF
3 2 .8 '
f. Garbage and recycling is the responsibility of the Owner through private INV A: 12.97' 4"PVC 14.8 9.7
15
14.4
24.4 INV B: 11.21' 15"CPP 13
carting services. 16.3 A
12
15.7
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp.,
2 4 .0 '
14.1 14.8 15.2
RIM: 14.2'
5
34.6'
100' m
Site Location Plan
B INV A: 10.68'
N/F NYS EXECUTIVE
g. The Owner/Applicant is advised that no blasting is permitted onsite without GEBCO, USGS, FAO , NPS , NRCAN, G eoBase, IGN, Kadaster NL,
INV B: 10.68' 14.5 14 13.4
376 sq ft
17
15"CPP 14.2 15.3 13.6
Ordnance S urvey, Esri Japan, METI, Esri China (Hong Kong),
15.1 15.1 15.1 15.2
an approved rock removal and blasting plan as approved by the Department of 23.8
CRW
14.8
15.1 15.6
11.4
DEPARTMENT
15
swisstopo, MapmyIndia, © O penS treetMap contributors, and the GIS
15
Technical Services.
SR
T
MEN
T 12.7
HAL
S27°24'00"E
ART
W
23
ASP TAX# 22.15-2-1 User Community
15.1 15.4 12.5 D EP
16.2 15.0 CNC. 15.7
TIVE
W 15.5
h. At the completion of construction a comprehensive as-built survey is required 14.3
15.2 15.1 U
SR EXECU
NYS
14.7
30.1' 2 -1
and shall be prepared by a NYS licensed land surveyor.
14.4 U U
15.1
N/F 22.15-
TRAVELED 16.1' U 15.2 15.7 15.7
TAX #
WELL 15.0
N
BASI
:
LET '
CHAMBERS
WAY CHAMBERS
40.0'
X UNDER14.9 15.3
E IN 5 H
PIP PP: 12. C
CAT
UNDER
i. At the completion of construction, the Applicant’s Engineer shall certify that 18 '
: 7.38 "CMP
22.8
24"C L
all retaining structures were built in accordance with the approved plans on file
22.6
M E
' 12
U
RI
: 6.23 " PIPE
162.08'
24"C
with the Town and that all factors of safety for sliding, overturning and 15.5
20.0' 10.0'
16.4
V 1
20
CNC.
IN '8
: 3.63
15.6
settlement have been met. CP
INV 2 .63' 24" R
PP
14.6 ROOF
DRAIN 21.4
:3
15
INV 3
(TYPICAL) 14.9
15.1
20
j. A foundation survey is required to be submitted to the Department of Technical 15.2
16
22.3 22 16.0
16.3
Services upon completion which shall verify that all footings and setbacks including 2
CNC.
15.0 15.2 CNC. 15.3 17.5 27.4
1 STORY 15.2 15.1
15
28.1
granted variances have been met 1,731 sq ft 14.2
CNC.
CO U U U U U
STRUCTURE #70
18.6'
U
1
21.0'
15.0 15.0
25
k. Copies of permit & approved plans shall always be on the work site during 16.1' 18.0' 98.0' 30.1' 3
A 34.1' U 15.2 15.1
15 P
construction 21.8
RIM: 14.10'
14.5 14.8 15 16.7 21.5
12 " CM 7.76
20
21.5
N/F NYS EXECUTIVE DEPARTMENT 23.5 20
20
INV A: 10.26' U U ASPHALT
SB
B
4.0'
10.8'
TAX# 22.15-2-1 INV B: 10.26' U
l. Excess cut soil shall be legally disposed of off site. No rock crushing is proposed. 1–22-26 for review JJG
17
15"CPP
3,359 sq ft
54.0'
15.2
14.8
14.7 SB SSB
B
18
CHAMBERS
EOA
UNDER 16.1
m. On site soil to be used for any purpose on site shall be certified by the design U 15.2 14.4 9-29-25 for review JJG
10
38.4'
21.6 15.3 CRW 15.0 15
professional and approved by town engineer. 14.5
AREA=28060.8445±SQ.FT. 14 13.5
9 8 SB
15 ACRES=0.6442± 13.4 14
14.1 U
TAX#22.20-2-1 12.5
SB Date Issue Initial
CNC.
CNC.
E 15
12.4 10
4"
0.2' 13.7
2 STORY 13.5 CC 13.7 9.30
R 15'
N27°24'00"W
10.3
2
Site Plan
20.9 U ' SRW 8.5
10 9'
21
13
14.6 14.8 14.6
2° 0.8 8.6
NB
NYS DISK 2 LINE SB
14.7 8.8
1,290 sq ft N 6 FOG
14.9
12.2 FOUND 8.5 9.6
0
21.5 CC
13.4
12.4
U N D 1 8.9
FO
12.4
12
SB
5 0 .6
58.0' 12
P.
IPE PRO
9.6
15 190.08'
9.6
N P 9.22
LT NB
IRO NE OF
8.8
'
HA9.7
14.3
22.2
' SP NB
0.66 NER FA
ASPHALT 14
9.6 8.16
ET:
22
EO
30.0'
IIRF
RF UTL 9
44'
21.5
R 9.5
D G E O 9.2'
CO 10.3
14.2 12.1
P
13.8 13.5
10.0 10.3
IIPF
PF E 9.7 PI
PP: SB
N/F NYS EXECUTIVE 24"C
9.6
12.3
CC
10
9.7 9.9 9.57 New Sales & Service Building
DEPARTMENT TRAVELED
9.7
CC 9.7 10
9.9
NB for
13 RIM: 11.77' SRW
10.2 9.8 GRAVEL 9.6 10.27
WAY 9.6
Leal Peterbilt
RIM: 13.73' 13.6 RIM: 9.35'
6' curb terminal
NB
INV A: 7.33' 15"CPP 11.1
TAX# 22.15-2-1 21.4
14.5 A INV A: 9.45'
INV B: 9.35'
INV B: 9.17' 4"PVC CC
INV: 7.58' CC
5
20 INC C: 7.2' 15"CPP
B
15"CPP 10' external curb extension
15"CPP 12.8 12.2 A 9.84
B
CC C new pavement 8.53 6.71 70 Roa Hook Road
10.1
13.9 13.2
CC
W
10.7 9.5
GRAVEL 10.18
NB
Town of Cortlandt
12.6
'24 "11.7 Flood Linesawcut pavement 2' from white line
new 100 Year10.2
A B
°07 CC Westchester County
S1343 Elev. 10.5 NGVD 1929
13.5 D
10
SB
E
15.5 RIM: 13.51'
' 10.2
GL
IN New York
2.78
INV A: 6.21' C 12.5
FO 8
13 INV B: 6.21'
1 1 10.2
NB 5.63 Lot 1 Block 2 Section 22.20
LINE
Oil15Water Separator 12.5 INC C: 6.0' 11.5 8.80
9.9
FOG
10.3
top 10.5 15"CPP
L
RAI
10.19
7
90.8
see detail on drawing 7 10.2 10 B RD
100 YearSFlood Line GUA
'
A
NB AL
MET
12.4
10.4
11.7 Elev 10.5 NGVD 1929
12 10.51
B
10' external curb extension (Elev 9.5 NAVD) 7.10
IRON ROD "W
'22
CC
10.4
11.7 FOUND ON 2
4°5 0'
11.6
9.13
S3 63.2 NB
12.2 IPF 6' curb terminal
PROP. CORNER 10.38
D
RIM: 9.59' 10.5
OA
11
INV A: 5.72' 15"CPP 8
R
INV B: 5.44' 24"RCP
OK
IRF
10.8
NB
O
IRF
T SB 5
11.5
AL10.6
A H DG
E 7.35
24
H RI
RO
11.2 10.9
P
10.36
AS EB
11.4
"R
F ILL
11.3
99.
CC
10.7 O 9.36 9 V
CP
10.8
GE TE S 2
7'
D N
AL
T E SB R OU LL-AN
PH US KSKI
AS TRY 10.86 10.7 E
PE . 185
0)
EN Y H
(S.
10.66
WA
10.9
11
11.1
CC
97
10
NB
.1'
PLAN
NY 024343-01 exp 03-31-2027
10.9
10.8
E
7.84
Site Plan NORTH It is a violation of the law for any person, unless
acting under the direction of the licensed architect,
LIN 5
SB NB FO
G
Scale: 1" = 20.0'
to alter any item in the plans, specifications or
reports to which the seal of the architect has been
applied in any way. If an item bearing the seal of an
E
11.54
G
LIN 9.59
R EEK 0 10' 20' 40' architect is altered, the altering architect shall affix
to this item the seal and the notation "altered by"
FO SB C Prepared with information taken from
LLE
followed by the architect's signature and the date of
7.68
.
10.8
VI "Property Survey & Topography 70 Roa Hook such alteration and a specific description of the
ONC 10.76 R
TE RK) 24" RCP
N N SE Rd (US RT 9) Cortlandt Manor, New York
alteration.
C RB A A
John J Gilchrist
W A EL: 1.3' Prepared for Steven Auth" by Rowan Land
CU NB E OF ER M
G T Surveying, PLLC dated October 14, 2017
ED H WA
G
(H I
Architect
AL
MET D
NB U A R
G
IL
RA
9.72 9
RA
IL A Professional Corporation
SB RD
LG
U A
8 Coach Lane
TA
SB ME Upper Saddle River
11.43 8.20
New Jersey 07458
10.80
7.22
Phone 201 573 1877
. NB
NC B JJGAPC@gmail.com
CO UR 7 Peterbilt
C
NB LINE 1" = 20.0'
G
2 of 5
FO
250311
Page 44
JOHN J
Permanent Seeding: Tree Removal & Protection Notes GILCHRIST
Permanent seeding will be applied immediately after the final 1. All removal of trees on property are to be minimized
ARCHITECT
design grades are achieved at the site but no later than 14 days & shall be tagged by the contractor & inspected by the A Professional Corporation
N/F NYS EXECUTIVE DEPARTMENT
after construction activities have permanently ceased. After Town of Cortlandt prior to cutting. Tree wells shall be CLEARED TAX# 22.15-2-1
25.1
the entire site is stabilized, any sediment that has accumulated constructed around all trees that would be impacted as GRAVEL
AREA
will be removed and hauled off site to a licensed landfill a result of cutting & filling 20 17
facility. Construction debris, trash, and temporary BMP’s will
20
25 22.8
28.6
also be removed in areas disturbed during removal will be 2. All trees designated for preservation shall be clearly 20
18.3
seeded immediately. marked w/ a bright colored ribbon or other easily 16.6 15.2
27.2
discernible method. 36.4 16
Seedbed Preparation: 35
14.5
33.2 15 14.6
17
34.6 30 19.0
16
34.8
a. Topsoil will be spread over final graded areas at a minimum 15.6
15
34 16.6
depth of four inches. 25
20 IRF 13 14
15.3 I
RF
b. The seedbed will be free of rocks, woody debris and other 30
15.7
1.2' 15.6 13.7
objectionable material. 15.1 15.2
0.3'
27.8 15.4 15.7
26
c. Fertilizer will be applied to the seedbed as specified in the 25.6 22.5 17.4
15.5
14.9 14.9 U 12
25 WELL
appendix. 22
15
17.7
15
12
CC 14.6
d. Topsoil will be loosened by raking, tilling or other suitable 17
15.2 HAL
T
24.6
ASP
methods. 25
10
14.8 15.4
8'-0" 20 CC 15.7 15.6 9.7
Installation schedule: Portions of the site where construction
0.7'
14.3
24.8 16.2 CRW CC 12.6
A
15.2
5
1.36' RIM:14.41' 12.5
IRF B
activities have permanently ceased will be stabilized, as soon
3 2 .8 '
INV A: 12.97' 4"PVC 14.8 9.7
15
14.4
3'-0"
24.4 INV B: 11.21' 15"CPP 13
16.3 A
12
15.7
as possible but not later than 14 days after construction ceases.
2 4 .0 '
14.1 14.8 15.2
RIM: 14.2'
5
34.6'
B INV A: 10.68'
INV B: 10.68' 14.5 14 13.4
376 sq ft
17
13.6
Maintenance and Inspection: All seeded areas will be inspected 4" x 4" steel post 23.8
CRW
15"CPP 14.2
14.8
15.1
15.1 15.1 15.1 15.2
15.6
15.3
11.4
3'-0"
R8-31 15 15
SR
T
MEN
T 12.7
HAL
weekly during construction activities for failure until a dense ART
W
23
ASP 15.1 15.4 12.5 D EP
16.2 15.0 CNC. 15.7
TIVE
W 15.5
14.3
15.2 15.1 U
SR EXECU
cover of vegetation has been established. If failure is noticed 14.4
14.7
U U
15.1 30.1' NYS
N/F 22.15-
2 -1
TRAVELED 16.1'
WELL
U
15.0
15.2 15.7 15.7
TAX #
:
LET '
CHAMBERS
on the seeded area, the area will be seeded, fertilized and WAY CHAMBERS
40.0'
UNDER14.9 15.3
E IN 5
22.8
UNDER PIP PP: 12. 18
Freestanding Sign Detail
22.6
U
24"C
mulched immediately. After construction is complete at the site
24"C
16.4
15.5
20.0' 10.0'
20
CNC.
15.6
permanent stabilization measures will be monitored until final 1–22-26 for review JJG
PP
14.6 ROOF
landscaped areas to be mulched w/ 21.4
SCALE: 1/4" = 1'-0" 15
DRAIN
(TYPICAL) 14.9 3" of hemlock bark mulch
15.1
20
stabilization is reached. 15.2
9-29-25 for review
16
limit of disturbance
22.3 22 16.0
16.3 JJG
CNC.
15.0 15.2 CNC. 15.3 17.5 27.4
1 STORY 15.2 15.1
15
28.1
1,731 sq ft 14.2 U U U U U
U
STRUCTURE #70 CNC.
Date Issue Initial
15.0 15.0
25
16.1' 18.0' 98.0' 30.1'
Landscaping Plan
A 34.1' U 15.2 15.1
15
Plant List 21.8 14.5 14.8 15 16.7 21.5
RIM: 14.10'
20
21.5
N/F NYS EXECUTIVE DEPARTMENT 23.5 20
20
R8-31 B
INV A: 10.26' U U ASPHALT
TAX# 22.15-2-1 INV B: 10.26' U
17
Key Scientific Name Common Name Quantity Size
15"CPP
3,359 sq ft
54.0'
15.2
14.8
14.7 SB SSB
B
18
CHAMBERS
UNDER 16.1
DW Cornus Sericea "Flaviramea" Yellow Twig Dogwood 2-3” U 15.2 14.4
38.4'
21.6 15.3 CRW 15.0 15
AREA=28060.8445±SQ.FT. 14
RJ Juniperus Horizontalis "Wilton" Wilton's Blue Rug Juniper 2 gallon 14.1
14.5
U
15 ACRES=0.6442± 13.4 14
13.5
12.5
TAX#22.20-2-1
ML Kalmia latifolia Sarah Sarah Mountain Laurel 2 gallon
CNC.
0.2' 2 STORY
CNC.
13.5
R 15'
CC
13.7
13.7 15
12.4
10.3
10 New Sales & Service Building
8.5
GC Chamaecyparis pisifera Golden Cyprus 2 gallon 20.9 U SRW
for
X
21
13
14.6 14.8 14.6 8.6
BS
WA
Picea pungens Waldbrunn
Azalea Delaware Valley White
Waldbrunn Dwarf Blue Spruce
White Azalea
5 gallon
5 gallon 21.5
R8-31
CC
14.7
14.9 1,290 sq ft
13.4 12.2
12.4
NYS DISK
FOUND
UND
10
8.5
8.9
8.8
9.6 Leal Peterbilt
12
12.4
2DW FO SB 70 Roa Hook Road
5 0 .6
58.0' 12
P.
PIPE PRO
9.6
15
9.6
R Rhododendron Northern Starburst Rhododendron 3 gallon N 9.22
LT Town of Cortlandt
IRO NE OF
8.8
R3-2 "No Left Turn"
'
HA9.7
14.3
22.2
' SP
50 RJ 0.66 NER FA Westchester County
ASPHALT 9.6
4" wide2white epoxy paint 14 ET:
EO
30.0'
IIRF
2 RF UTL 9
44'
21.5 striping typical R 9.5
D G E O 9.2' New York
CO 10.3
14.2 12.1
10.0
E PIP
PP:
10.3
13.8 13.5 IIPF
P F 9.6 9.7
24"C
18 RJ 12.3
CC 9.7 9.9 9.57 Lot 1 Block 2 Section 22.20
10 9.7 10
CC 9.7
TRAVELED 10.2 9.8 GRAVEL 10.27 9.9
13 RIM: 11.77' SRW 9.6
21.4 WAY 14.5 A
RIM: 13.73'
INV A: 9.45'
13.6
INV A: 7.33' 15"CPP
INV B: 9.17' 4"PVC
11.1
RIM: 9.35'
INV: 7.58' CC
9.6
NB
INV B: 9.35' CC
20 INC C: 7.2' 15"CPP 15"CPP
15"CPP B
12.8 12.2 A 9.84
B
CC C 8.53
10.1
CC 10.7 9.5
10.18 state right of way to be seeded
NB
13.9 13.2 GRAVEL
new 3' x 8'freestanding business 12.6 11.7
10.2
A
identification sign 13.5
B CC
D 13
RIM: 13.51' 10 INE SB R3-2 "No Left Turn"
15.5
INV A: 6.21' C
10.2
GL
12.5
FO 8
13 INV B: 6.21' 10.2
NB
15 12.5 INC C: 6.0' 11.5 9.9
8.80
LINE
FOG
15"CPP 10.3
10.19
7 10.2 10
SB
REMOVE ENOUGH WHOLE BRANCHES TO REDUCE
FOLIAGE BY 1/3 (ALWAYS PRUNE TO NODE OR A
NB
12.4
CROTCH RETAINING NORMAL PLANT SHAPE, DO DO NOT CUT LEADER 10.4
11.7
NOT CUT LEADER) 12 R7-8 "ADA Parking" 10.51
B 7.10
REMOVE ENOUGH WHOLE BRANCHES TO REDUCE
CC IRON ROD 10.4
FOLIAGE BY 1/3 (ALWAYS PRUNE TO NODE OR 11.7 FOUND ON 11.6
9.13
NB
CROTCH RETAINING NORMAL PLANT SHAPE, DO
12.2 IPF
NOT CUT LEADER)
PROP. CORNER 10.38
D
RIM: 9.59' 10.5
OA
11
INV A: 5.72' 15"CPP 8
R
INV B: 5.44' 24"RCP
OK
2 STRANDS NO. 12GA GALVANIZED ANNEALED IRF
NB
STEEL WIRE-TWISTED IN NEW RUBBER HOSE
10.8
O
IRF
T
6' MAX. MINOR TREE
5
SB H
7' MIN. MAJOR TREE
AL10.6 E 7.35
A DG
11.5
H R3-2 "No Left Turn" NY 024343-01 exp 03-31-2027
2 STRANDS DOUBLE
I
O
11.2 10.9
SP BR
WRAPPED AND TWISTED
CIRCLED WATERPROOF TREE WRAPPING
11.4
CC 11.3
10.36
F A state right of way to be seeded 9.36 R IL L E NYR7-5P "7 AM - 9 AM It is a violation of the law for any person, unless
EO 9 SV
PAPER 4" SIDE-50% OVERLAP-TIED 10.7
MULCH (3" LAYER) AS SPECIFIED WITH STOUT HEMPCORD AT TOP OF 10.8
G T E N 4 PM - 6 PM WEEKDAYS"
2 acting under the direction of the licensed architect,
ED U N
6' MAX. MINOR TREE
OVER ENTIRE BED
T
7' MIN. MAJOR TREE
to alter any item in the plans, specifications or
SB
BALL AND AT HEIGHT OF 2-ND BRANCHES
PITCH AWAY FROM TREE TRUNK
H AL S RO ILL-A Note: If safety or operational issues arise the reports to which the seal of the architect has been
P U SK )
FORM 3" HIGH TOPSOIL LIP AROUND EACH
time restriction on NB left turn entering may
AS TRY EK
SHRUB TO PROVIDE WATERING SAUCER applied in any way. If an item bearing the seal of an
850
FORM 4" HIGH TOPSOIL LIP EDGE
OF TREE PIT TO FORM WATERING 10.86 10.7
P E be removed & all left turns prohibited architect is altered, the altering architect shall affix
SAUCER
EN Y H . 1
(S.
10.66 to this item the seal and the notation "altered by"
WA
10.9
6"
11
4" TREE BALL 4"
11.1 followed by the architect's signature and the date of
CC
ROOT BALL such alteration and a specific description of the
10
VARIES
alteration.
TOPSOIL MIX BACKFILL VARIES TOPSOIL MIX BACKFILL
NB PLAN
CUT AND REMOVE BINDING FROM TRUNKS
CUT AND REMOVE BINDING FROM TRUNK 10.9
10.8
E
7.84
Landscaping Plan NORTH
John J Gilchrist
LIN
AND AS MUCH BALL AS POSSIBLE 6"
AND AS MUCH BALL AS POSSIBLE 5
SB NB
CUT AND REMOVE BURLAP AT UPPER 1/3 CUT AND REMOVE BURLAP AT UPPER 1/3
G
FO
Architect
6" OF BALL
Scale: 1" = 20.0'
OF TREE BALL
E
16" TAMPED TOPSOIL MIX CUSHION 6"
LIN EK 0 10' 20' 40'
TAMPED TOPSOIL MIX CUSHION 6"
11.54
FO
G 9.59
C R E A Professional Corporation
SB
CEDAR STAKES MIN. 3" DIA., 3'-0" LENGTH
Prepared with information taken from
LLE
VARIES 3 STAKES @ 120 DEG. PER TREE
6" 6" 12" VARIES 12" 7.68
STAKES TO BE DRIVEN IN AFTER
.
10.8
VI "Property Survey & Topography 70 Roa Hook
8 Coach Lane
SE
ATTACHING TENSION WIRE TO TREE
NC 10.76
N Rd (US RT 9) Cortlandt Manor, New York
O
C RB AN
NOTES:
1. CONTRACTOR SHALL HAVE THE OPTION OF PLANTING SHRUBS IN INDIVIDUAL
PITS AS SHOWN OR IN UNINTERRUPTED EXCAVATION FOR ENTIRE BED, IN
NOTES:
1. PROVIDE 3" LAYER OF MULCH AS SPECIFIED OVER ENTIRE WATERING SAUCER AT ALL
CU NB
Prepared for Steven Auth" by Rowan Land
Surveying, PLLC dated October 14, 2017 Upper Saddle River
New Jersey 07458
EITHER CASE BACKFILL WITH TOPSOIL MIX AS SPECIFIED. TREE PITS OR OVER ENTIRE TREE BED.
AL
MET D
NB A R
Phone 201 573 1877
G U
DECIDUOUS TREE N.T.S. IL
SHRUB PLANTING N.T.S. RA
9.72 9 IL
RA JJGAPC@gmail.com
ARD
U Peterbilt
ALG 1" = 20.0'
T 3 of 5
ME
250311
1
Page 45
JOHN J
18'-0" 8'-0" 7'-8" 34'-8" 16'-4"
one story addition
31'-4"
addition GILCHRIST
addition to service bays
376 sq ft ARCHITECT
A Professional Corporation
portion of existing building to remain
10'-0"
existing office area to remain
addition
12'-0"
newe serive bats
service bay addition
Storage Storage Mech'l Office
10'-0"
26'-0"
addition
+12'-8" +12'-8"
3 Mezzanine 3 Mezzanine new ADA restroom
28'-0"
Storage
existing restroom
19'-4"
Office
±0" ±0" Office
22RISE(6 29/32")
UP
21RUN(11")
2 First Floor 2 First Floor steel stair
1
2
3
10
12
13
14
15
16
17
18
19
20
21
22
11
4
5
6
7
8
9
East (Right Side) Elevation Parts
SCALE: 1/8" = 1'-0" three existing car wash bays to be used as service bays
15'-8"
18'-0" existing wash bay to be used as parts storage
new construction portion of building to remain
1–22-26 for review JJG
existing to remain two wash bays to be demolished 9-29-25 for review JJG
new construction 1,290 sq ft
Date Issue Initial
31'-4"
Floor Plan & Elevations
four new service bays
3,021 sq ft
New Sales & Service Building
for
portion of building to be removed
Leal Peterbilt
70 Roa Hook Road
addition
7'-0"
Town of Cortlandt
Westchester County
New York
Lot 1 Block 2 Section 22.20
North (Rear)Elevation 58'-0"
addition
SCALE: 1/8" = 1'-0"
First Floor Plan
SCALE: 1/8" = 1'-0"
service bays addition portion of existing building to remain
NY 024343-01 exp 03-31-2027
It is a violation of the law for any person, unless
new service bays acting under the direction of the licensed architect,
to alter any item in the plans, specifications or
reports to which the seal of the architect has been
existing to remain applied in any way. If an item bearing the seal of an
architect is altered, the altering architect shall affix
to this item the seal and the notation "altered by"
followed by the architect's signature and the date of
such alteration and a specific description of the
alteration.
John J Gilchrist
30'-0"
+12'-8" +12'-8"
3 Mezzanine 3 Mezzanine
Architect
A Professional Corporation
8 Coach Lane
Upper Saddle River
±0" ±0"
2 First Floor 2 First Floor New Jersey 07458
Phone 201 573 1877
JJGAPC@gmail.com
West (Left Side) Elevation South (Facing Rt 9) Elevation 1/8" = 1'-0"
Peterbilt
SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"
4 of 5
250311
Page 46
January 21, 2026
Mr. Michael Preziosi
Director D.O.T.S
Town Hall
1 Heady Street
Cortlandt Manor, NY 10567
Re: Dakota Concrete - Response to Comment Letter Dated August 14, 2025
Dear Mr. Preziosi:
On behalf of the Applicant, and in connection with the above-referenced Site Plan application, we submit
this correspondence in response to the comment memoranda dated August 14, 2025, issued by LaBella
Associates in response to the Applicant’s May 2025 submission.
All corresponding drawings and supporting materials are updated to reflect these completed
revisions and are included with this submission.
Below are written responses to each of the comments in Labella’s letter.
Administrative
1. ALL plans subsequently submitted to the Town for review must be designed for construction and
be complete for review by all regulatory agencies having jurisdiction (e.g. WCDOH, NYSDEC, etc.).
Response:
All drawings are "For Construction", ready for review by jurisdictional agencies.
2. ALL approvals must be received by regulatory agencies having jurisdiction prior to commencement
of ANY construction activities.
Response:
All required permits will be obtained prior to commencing construction.
3. This office understands the existing on-site water supply (including meters, backflow prevention,
and adequacy of pipe sizes) is under review by DOTS, and therefore comments related to the
existing water facilities are excluded from this review.
Response:
Noted
4. Provide a copy of the 50-wide access easement.
Page 47
Dakota Concrete / Dakota Recycling Response to Comments
Page 2
Response:
Copy of the 50’ wide easement has been requested.
5. It is difficult to distinguish between what is proposed and what is existing on the plans as the
linework and callouts are all bold. Please provide different line weight and callouts for existing and
proposed features on the plans.
Response:
Proposed work is highlighted on the drawings. Proposed improvements include:
Recycling Facility
1. Expanded Detention Pond.
2. Delineated Emergency Traffic Lane.
3. Updated track pad area, raised asphalt berms, and wheel wash area.
4. Concrete washout improvements at recycling facility.
Concrete Facility
5. General stormwater improvements at the concrete plant area.
6. Proposed Detention Pond.
7. Improved Raised Asphalt Berms.
8. Fire Hydrant to be made operational for fire suppression in compliance with 10 state
standards.
6. Provide verification that all water supply lines are protected with a WCDOH approved backflow
prevention device and all devices shall be logged with recent inspections uploaded to
https://bsionline.com.
Response:
A backflow prevention device is shown on the project plans; see Drawing CLA-9A. The NYSDOH
Certificate of Approval for the backflow prevention device (Log No. CC-1055, dated March 6, 1992)
is included for reference.
7. There appears to be water surfacing near the driveway to Dakota Supply Corp Masonry Yard and
Dakota Recycling Services. We request this be investigated and confirmed it is not a waterline
break.
Response:
Damaged line was repaired.
8. Provide construction compliance documentation from WCDOH for the on-site septic disposal
system.
Response:
As-built septic system drawings, approved and signed by Westchester County on September 30,
2005, are attached.
- Designs that Build –
Page 48
Dakota Concrete / Dakota Recycling Response to Comments
Page 3
9. Providing current NYSDEC Registration for C&D Processing.
Response:
Part 360 Registration is provided.
Full EAF
1. D.2.g (P6) – Will any air emission sources named in D.2.f (i.e., facility vehicles, concrete, and
processing plant) require a NY State Air Registration, Air State Facility Permit, or Federal Clean Air
Act Title V or Title IV Permit?
The “Yes” box is checked off and the notation provided therein states that the “Site is currently
covered under existing Air Permit.” While I assume the answer provided here refers to the County’s
Certificate to Operate issued to DRS and DCS, there were no federal or state air permits found in
the supplied doc.
Response:
The recycling operation is subject to state air regulations. An application for a state facility
registration was submitted on July 15, 2025, approval was received on May 12, 2025. Batch
concrete operations are exempt under state air regulations (201-3.2(c )(37)). No other federal or
state air permits are required.
2. D.2.i (p7) – Will the proposed action result in the release of air pollutants?
The “Yes” box is checked off and the notation provided therein states that the “proposed action
will not increase air pollutants above current levels.” Not clear what the “current levels” of “air
pollutants” are. The County has listed opacity (7% not to be exceeded) as the only parameter that
the DRS operations must adhere to.
Response:
The recycling facility generates particulate and combustion source air emissions. Permits have
been obtained for these emissions sources. The action being undertaken for which the EAF is
required (obtaining site plan approval) will not result in a change to the emissions sources or to
the emissions being generated.
Plans
1. Cover Sheet – Provide a Town signature Block.
Response:
Town signature block added.
2. Cover Sheet – Provide tax parcel ID number of site on the cover sheet.
Response:
Tax parcel ID number added to cover sheet.
- Designs that Build –
Page 49
Dakota Concrete / Dakota Recycling Response to Comments
Page 4
3. Cover Sheet – Provide a bulk and parking tables for each individual use.
Response:
Parking information added to drawing.
4. Cover Sheet - Please identify the locations of school, zoning, and special district boundaries on the
location map.
Response:
Applicable school, zoning, and special districts added to drawing.
5. Cover Sheet – Explain the meaning of Note 1 which states “All conditions of approval as noted in
formal letters of approval of findings are part of the approved site plan, drawings or plans, and
hereby referenced for additional approved details.”
Response:
Note is updated to read, “All conditions of approval as noted in letters of approval or findings by
departments or agencies having jurisdiction are incorporated into the approved site plans.”
6. CLA-01 – Applicant shall clarify how their front yard and side yard setbacks were established as
the shared access drive is a private road.
Response:
Based on 2004 site plan approvals, setbacks were originally approved as follows:
50’ foot Easement – 20’ Setback
North Property Line – 20’ Setback
East Property Line – 20’ Setback
Based on meeting with the Town on December 09, 2025, the following setbacks were verified.
Albany Post Road – 40’ Front Setback
50’ foot Easement – 20’ Setback
North Property Line – 20’ Setback
East Property Line – 20’ Setback
The Applicant requests an interpretation from the Planning Board regarding the East property line
setback.
7. CLA-01 – The existing concrete block forms are located within the proposed front yard setback and
the existing plant is located within the proposed side yard setback. Are there existing variances for
the encroachments?
Response:
No variances were obtained for the Concrete Facility.
8. CLA-01 – Stockpiling activities associated with the lease area for Dakota Recycling Facilities is
encroaching onto The Dakota Supply Corp. property. The stockpiles should be relocated as part of
- Designs that Build –
Page 50
Dakota Concrete / Dakota Recycling Response to Comments
Page 5
the project? Please add a note to the plan indicating there shall be no stockpiling of material
associated with Dakota Recycling Services on the Dakota Supply Corp lease area.
Response:
Stockpiles adjusted to ensure they do not encroach onto the Dakota Supply Corp. property. Note
added to drawing.
9. CLA-01 – Identify parking areas for employees and concrete trucks.
Response:
Employee and concrete truck parking areas added to project plans.
10. CLA-01 - Provide details for new paved wheel wash pad, mountable berm, and hose bid.
Response:
Wheel wash pad and mountable berm details added to drawings. The existing hose bib consists
of a 5/8” hose with nozzle. Line and location of nozzle is shown on drawing CLA-9A.
11. CLA-01 – New paved wheel wash should be shifted north away from high point.
Response:
The paved wheel wash pad shifted north to ensure runoff from the wash area drains back into the
site and not down the shared access road.
12. CLA-01 – Depict how the new hose bib is being connected to the water supply and provide details.
Response:
See Plans Response to Comments #10.
13. CLA-01 – The Town of Cortlandt Zoning Code limits heights of stockpiles to 20-ft. Provide a note
on the plans stating same and show regrading of stockpiles to meet the height requirements.
Response:
Note added to plans stating stockpiles shall not exceed 20’ in height. Stockpiles are regraded
showing compliance with regulations.
14. CLA-01 – Provide a detail of the inspection limit curb. A 6-inch curb (presumed) does not appear to
be high enough to provide a delineation for stockpiles in excess of 25-ft. Higher alternatives should
be considered, detailed, and discussed how they will be installed.
Response:
The applicant will maintain a 4-foot area free of stockpiles and materials in front of the
existing curbs and Jersey barriers. Providing a 4-foot inspection area behind the adjacent
bins is not practical. To address this, the bin walls will be raised by two additional courses
of block to ensure materials do not overtop the walls or migrate toward the adjacent
fence and property line.
- Designs that Build –
Page 51
Dakota Concrete / Dakota Recycling Response to Comments
Page 6
15. CLA-01 – Clarify 4 ft minimum area between curb/property line and stockpile shall be kept clear
for inspections. As the curb does not approach the property line, property line should be eliminated
from the note.
Response:
Note is revised to read, “Inspection perimeter setback to be kept clear for inspections.”
16. CLA-01 – Confirm the composure of the emergency access drive and explain how it will provide all
weather driving capabilities in accordance with Section 503.2.3 of the Fire Code of New York State.
Response:
The current gravel access road is constructed of gravel and has a demonstrated history of
supporting vehicles weighing in excess of 75,000 pounds, consistent with the requirements of the
New York State Fire Code. The road has been routinely used by heavy vehicles without structural
failure or operational limitations.
In addition, the access road has been utilized on a year-round basis and has consistently provided
an all-weather driving surface. The road is actively maintained and cleared during periods of
inclement weather, including snow and ice conditions, ensuring continuous and reliable access
for emergency vehicles at all times.
17. CLA-01- Per Table B-2 of NYSDEC the minimum horizontal separation distance between an
absorption field and stormwater management practice discharging stormwater to surface water
is 100 ft. The proposed detention facility is within 100-ft of the existing absorption field. A waiver
from the WCDOH will be required.
Response:
The system is approved by the WCDOH. Pond (with expansion) does not encroach on septic
system. See Administrative Response to Comment #8.
18. CLA-01 – Material stockpile on northern side of property appears to be sloping into the neighboring
property.
Response:
Facility operations will ensure that no material leaves the site. See Plans Response to Comments
#8.
19. CLA-01 – Although not required by NYSDEC, can a roof structure be provided over tanks with
secondary containment dikes to prevent precipitation from entering the dikes.
Response:
The facility chooses to manage accumulated precipitation in accordance with SPDES secondary
containment requirements (see SWPPP). A roof structure is not proposed.
20. CLA-01 – Depict location of rumble strips discussed in SWPPP for Dakota Recycling Services and
Dakota Concrete Services.
- Designs that Build –
Page 52
Dakota Concrete / Dakota Recycling Response to Comments
Page 7
Response:
The tire wash pad for the recycling facility consists of an impermeable rumble strip. See detail on
Drawing CLA-11. The concrete facility is completely paved; a rumble strip is not proposed for the
concrete plant area. SWPP language has been updated.
21. CLA-01 – Identify the chemical storage tanks behind and within Trailer 3, size of tanks, and what
the chemicals consist of. Do these tanks require secondary containment?
Response:
The storage tanks contain additives used in concrete production and are bio-degradable. They are
not subject to the chemical bulk storage regulations and secondary containment is not required
for the tanks. Inventory of materials can be found in the SWPPP.
22. CLA-01 – Provide the sizes of the water main and locations and sizes of water services for the on-
site facilities. It is understood the water main is being reduced from 8” down through the 4”
backflow device. The design engineer of record shall also provide certification that the flow is not
restricted as to impair use of onsite hydrants.
Response:
Water lines and sizes are shown on CLA-9A & 9B. Hydrant and water lines will be in compliance
with 10 State Standards.
23. CLA-01 – Provide a detail of the existing meter pit for Town Records.
Response:
Meter pit detail added to plans. See Drawing CLA-9A.
24. CLA-01 – Provide the hours of operations for the two businesses on the plan.
Response:
Hours of operation at both facilities will be 6AM to 4PM Monday – Saturday or as needed.
Drawings revised per comment.
25. CLA-02 – Provide acronyms on plan (i.e. EPSTP, EPP03.)
Response:
The referenced labels are not acronyms. They are emission point ID numbers corresponding to
the WCDOH emission point certificates to operate. Description of emission points added to
drawing.
26. CLA-03 – Provide a legend to define acronyms on plan (i.e. EPSTP, EPP03.)
Response:
See Plans Response to Comments #25.
- Designs that Build –
Page 53
Dakota Concrete / Dakota Recycling Response to Comments
Page 8
27. CLA-04 – Clarify how water is provided for spray heads on Sandvik QE442 scalping screen, Sandvick
QJ341 jaw crusher and closed-circuit plant. This should also be shown on Sheet CLA-01.
Response:
Note added to the drawings indicates water for spray heads is provided using hoses that are
deployed seasonally when the equipment is operating. The location of the hoses are shown on
CLA-9A.
28. CLA-05 – Clarify how water is provided for spray heads on TS80 Stacker, 36-60 Stackers 1 and 2.
This should also be shown on Sheet CLA-01.
Response:
See Plans Response to Comments #27.
29. CLA-06 – The survey shows asphalt berms along the entire length of the concrete plant adjacent
to the shared easement. CLA-6 identifies two breaks in the asphalt berms of 40-ft and 30-ft. Are
these proposed? If so, how is surface runoff being directed so it does not travel onto the shared
access easement?
Response:
The project drawings show improved raised asphalt areas that direct water towards the
stormwater treatment practices. See detail on Drawing CLA-11.
30. CLA-06 – The integrity of the existing asphalt berms on north side of site appears to have
deteriorated over time and in need of maintenance of reconstruction to continue to divert runoff.
Response:
See Plans Response to Comments #29.
31. CLA-06 – Depict the area on this plan where concrete trucks are allowed to stage.
Response:
Drawing revised to show concrete truck staging area.
32. CLA-06 – Is the asphalt berm and chain link fence proposed on the south side of the shared access
road? Said features are not shown on the survey. If proposed, please provide details.
Response:
Asphalt berm and fence are existing features as shown on the updated survey.
33. CLA-06 – Plan depicts a new stormwater catch basin and hydrodynamic separator. Is the
hydrodynamic separator proposed or existing? If it exists, it is not shown on the survey. If proposed,
please provide construction details.
Response:
The catch basin, pre-treatment storage basins and the hydrodynamic separator are existing
features. See updated survey.
- Designs that Build –
Page 54
Dakota Concrete / Dakota Recycling Response to Comments
Page 9
34. CLA-08 – The plans depict trucks backing into the concrete washout. Shouldn’t the trucks be
backing into the waste concrete disposal area as well? The existing grading will prohibit this.
Response:
Grading adjusted in the vicinity of the concrete washout area. The applicant is proposing to use
the existing concrete washout area with modifications. See updated plans and associated details.
35. CLA-08 - Where does the recycled water end up?
Response:
Concrete washout water will be pumped to a frac tank, where it will be treated using a pH
adjustment system and polymer drip.
Following treatment, water from the frac tank will be pumped to the existing water storage tanks
and reused for dust suppression at the plant.
36. CLA-08 – What is the size and depth of recycled wash water line?
Response:
Not applicable with current design.
37. CLA-08 – Where is the pump located for the recycled water?
Response:
Pump will be located in the pump chamber. See Drawing CLA-08.
38. CLA-08 – Provide bottom of concrete washout and disposal area elevations, top of wall elevations,
and weir size and elevations. Also depict the proposed grading to accommodate the construction
of the concrete washout.
Response:
The applicant is proposing to use the existing concrete washout area with modifications. The
existing washout is approximately 8’ deep.
39. CLA-08 – How do you access the bottom of concrete washout for maintenance?
Response:
An excavator is used to dredge material out of the washout area.
40. CLA-08 – Provide constructable details of the concrete wash pit and disposal area. The details
provided are conceptual in nature.
Response:
See Plans Response to Comments #34.
41. CLA-09 - Clarify if the bold lines labelled “W” are intended to be new water connections or existing
water connections?
- Designs that Build –
Page 55
Dakota Concrete / Dakota Recycling Response to Comments
Page 10
Response:
The depicted water lines are existing features.
42. CLA-09 – Depict how the new hose bib on Sheet CLA-01 is being connected to the water supply, as
well as recycled wash line and pump from Sheet CLA-08.
Response:
There is an existing 5/8” wash hose with nozzle depicted on CLA-01. See CLA-9A for connection.
Water lines and pump locations for the concrete washout area are shown on CLA-08.
43. CLA-09 – Provide a note in the location of the sewer lateral, tri gallery subsurface sewer disposal
area and septic tank indicting there shall be not storage of equipment over these components of
the septic disposal system.
Response:
Note added to drawing CLA-01.
44. CLA-09 – How is water in the concrete pit captured and reused to wash out drums and recycled in
the concrete plant? Are their piping and pumps not depicted on the utility plan?
Response:
Wash water is not recycled within the concrete plant. Refer to the Plans Response to Comment
#35 for information regarding the management of excess wash water from the concrete washout
area.
45. CLA-10 – Provide fire truck maneuvering on this plan.
Response:
Fire truck maneuvering is provided on the plan. Typical aerial fire apparatus was used for the
analysis.
46. CLA-10 – Clarify whether approved signs, notices, or markers - indicating No PARKING – FIRE LANE
will be provided to prohibit obstruction of the emergency access drive in accordance with Chapter
503.3 of the NYS Fire Code.
Response:
Proposed signage is shown on Drawing CLA-10. The signage is in compliance with Chapter 503.3
and Appendix D103.6 of the Fire Code. Signs are proposed on both sides of the access road.
47. CLA-10 – Confirm the composure of the emergency access drive and explain how it will provide all
weather driving capabilities in accordance with Section 503.2.3 of the NYS Fire Code.
Response:
See Plans Response to Comment #16.
48. STR-R1 – Provide the limits of disturbance required for all site improvements proposed as part of
this application.
- Designs that Build –
Page 56
Dakota Concrete / Dakota Recycling Response to Comments
Page 11
Response:
Majority of the site is disturbed. Updated drawings delineate the undisturbed area.
49. STR-R1 – Provide rock outlet protection for the sediment basin pipe outlet and provide a detail
with sizing calculations.
Response:
Rock outlet protection for the sediment basin outlet is added to the drawings. See Drawing STR-
R5.
50. STR-1R – Turn on trench drains at maintenance garage.
Response:
Trench drains are shown on the updated drawings.
51. STR – R2 – Turn on rim and invert elevations of existing drainage structures. Label trench drains at
maintenance garage.
Response:
Trench drains are labeled, and their elevations are shown.
52. STR-R3 – Due to the frequency of vehicles passing over the trench drains, watershed and
opportunity to collect sediment/oils/ greases self-containment is not an acceptable means of
management of runoff, as there exists concern the trench drains will overflow due to precipitation
events without outlets, thereby impacting surface runoff. Said runoff from trench drains should
be directed to a sediment/oil/water separator or hydrodynamic separator and then to detention
pond. SWPPP should be updated to reflect this.
Response:
Trench drains are connected by a buried pipe to a yard catch basin that discharges to the
detention pond. Yard catch basin is equipped with an oil and floating debris trap. See detail on
Drawing STR-R6.
53. STR-R3 – Is the silt sock intended to be permanent within the forebay. If it is going to be a BMP,
will there be adequate storage of the product on-site?
Response:
The silt sock is intended to serve as a temporary measure during the reconstruction of the catch
basin. The detail is revised to indicate that the silt sock is temporary.
54. STR-R3 – The side slopes of the proposed detention basin are designed to be 2:1 (2 horizontal feet
for every 1 vertical foot). Please provide a slope stability calculation to ensure the adequacy of the
proposed slope under saturated conditions.
Response:
Stability calculations for detention pond side slopes under saturated conditions are not required
by the NYSDEC Stormwater Design Manual. Suitable stabilization measures will be implemented
- Designs that Build –
Page 57
Dakota Concrete / Dakota Recycling Response to Comments
Page 12
in accordance with the NYSDEC Erosion and Sediment Control guidelines. See revised stormwater
pond details.
55. STR-R3 – Provide surface stabilization measures for the proposed 2:1 slope.
Response:
Suitable permanent side slope stabilization measures are proposed in accordance with NYSDEC
Erosion and Sediment Control guidelines. See revised stormwater pond details, STR-R6.
56. STR-R3 – Provide construction fence around the septic disposal field.
Response:
Construction fencing added to drawings. See Drawing CLA-11 for detail.
57. STR–R3- Provide a cleanout elevation for sediment and a stake within detention pond for
monitoring.
Response:
Sediment stake and cleanout elevation added to the detention pond detail.
58. STR-R3 – Specify the elevations of the ½ inch orifice. Due to the high probability of clogging the
orifices, frequent maintenance will be required. Consider alternatives.
Response:
The low flow orifice shown on Drawing STR-R3 is equipped with adequate protection as shown in
the orifice protection detail, Drawing STR-R5. Elevations are shown on STR-R3.
59. STR-R3 – Provide a rip-rap dissipator at the outlet of the 30-inch diameter CPPP.
Response:
See Plan Response to Comment #49.
60. STR-R3 – Provide anti-seep collars along the 30-inch CPP outlet and provide sizing per NYS
Standards for Erosion and Sediment Control.
Response:
Anti-seep collars are provided. See details on Drawing STR-R4 & R5
.
61. STR-R3 – Grading of the emergency spillway weir does not match the specified elevations. Weir
should extend to a flat area.
Response:
Pond grading is adjusted to accurately represent the weir elevations.
62. STR-R4 - Provide details of rip-rap emergency spillways, silt fence, head walls, anti-seep collars,
soil stockpile, pipe trench, and specifications of the outlet control structure (i.e. psi of concrete,
wall thickness, steps, etc.).
- Designs that Build –
Page 58
Dakota Concrete / Dakota Recycling Response to Comments
Page 13
Response:
Applicable details, associated with this project, are added to the project plans.
63. Provide maintenance measures for erosion and sediment control measures during construction.
Response:
Maintenance measures for temporary sediment and erosion control measures during
construction are outlined in the SWPPP.
64. STR-R4 – Provide trash rack on pond outlet per page 38 of Dakota Recycling Services SWPPP.
Response:
Pond outlet detail is updated to include a trash rack.
65. STR-R4 – Detail 1 indicates gate valve to remain closed until accumulated stormwater runoff is
deemed acceptable to release.
Response:
A gate valve is not shown on the detail. Gate valve notes are removed from detail.
66. STR-C1 – Provide the location of the wheel washing pad for the Dakota Concrete Services on the
plans.
Response:
The concrete facility is 100% paved, a tire wash pad is not needed.
67. STR-C1 – Provide the limits of disturbance required for all site improvements proposed as part of
this application.
Response:
Majority of the site is disturbed.
68. STR-C1 – Runoff from the driveway to Dakota Supply Corp, Masonry Yard, and Dakota Recycling
Services sheds onto the shared access road (50-foot easement from Peckham) way running west
to and east and is not captured by the asphalt berm adjoining the concrete plant. Runoff should
be captured and treated before being discharged.
Response:
Improved raised asphalt areas are proposed to eliminate runoff into the road. Improvements to
the raised asphalt areas will retain runoff on site and direct it to the treatment devices. See Plans
Response to Comments #29.
69. STR-C1 – This is evidence of vehicle tracking along the shared access road with Peckham Materials,
parallel to Dakota Concrete, LLC, in which untreated runoff is flowing overland toward the train
station. Address how this is being managed.
- Designs that Build –
Page 59
Dakota Concrete / Dakota Recycling Response to Comments
Page 14
Response:
Improvements noted in Plans Response to Comment #68 will prevent runoff into the easement
roadway from the facility on the north side and from the truck staging area on the south side.
Precipitation falling directly on the easement roadway and gutter runoff from the easement road
further west towards Albany Road is not coming in contact with Dakota industrial activity. Dakota
will be responsible for ensuring vehicles do not track sediment onto the road, however, the
easement road runoff will not be intercepted or diverted from flowing towards the train station.
70. STR-C1 – Provide the location of the wheel washing pad for the Dakota Concrete Services on the
plans referencing the SWPPP.
Response:
Tire wash is located within the recycling facility. See Plans Response to Comment #66.
71. STR-C1 – Provide the limits of disturbance required for all site improvements proposed as part of
this application.
Response:
See Plan Response to Comment #67.
72. STR-C1 – Provide rim and invert elevations of proposed and existing catch basins, and points of
connection. Survey existing drainage structures to confirm no conflicts with design. Provide
structures at all bends in culverts.
Response:
Rim and invert elevations of proposed and existing structures and points of connection added to
drawings. Structures are provided at all bends.
73. STR-C1 - Plan depicts a new stormwater catch basin and hydrodynamic separator. Is the
hydrodynamic separator proposed or existing? If it exists, it is not shown on the survey. If proposed,
please provide construction details.
Response:
The pre-treatment storage basins and the hydrodynamic separator are existing structures. The
drawings are updated to clearly indicate they are existing.
74. STR-C1 – Emergency overflow toward furnace room is not acceptable. Provide an alternative outlet
control which routes stormwater around the concrete plant.
Response:
Ther is no flow through the emergency spillway for the 100-year storm. 100-year storm conveyed
by the riser pipe. Flow from limited contributed areas would not represent a hazard to the
building.
75. STR-C1 – Structures shall be provided at all bends of proposed stormwater culverts.
Response:
See Plans Response to Comments #72.
- Designs that Build –
Page 60
Dakota Concrete / Dakota Recycling Response to Comments
Page 15
76. STR-C1 – The new detention basin is capturing areas from Dakota Recycling Services. Has this been
discussed with NYSDEC and will this trigger incorporating MSGP requirements that apply to the
Recycling Services for sector-specific sampling, monitoring, best mgmt., practices, and numeric
and non-numeric effluent limits into the Dakota Concrete Services SWPPP.
Response:
Runoff in this area is limited to roof and parking area runoff, and there is no industrial activity
contributing to this runoff. Therefore, discussion with the DEC is not necessary, and no
revisions to the NOI or additional MSGP requirements are needed.
77. STR-C2 – The eastern side of the concrete plant detention pond slope appears to be graded into
the side of a stockpile from the Peckham materials facility to the east. The side slopes of the
proposed detention basin are designed to be 1:1 (1 horizontal feet for every 1 vertical foot). Please
provide a slope stability calculation to ensure the adequacy of the proposed slope under saturated
conditions and considering adjoining berm.
Response:
Grading is not proposed on the east side of the basin. The basin follows existing contours of the
stockpile. The stockpile is at the angle of repose; additional slope stabilization measures are not
required.
78. STR-C2 – Provide surface stabilization measures for the proposed 1:1 slope.
Response:
See Plans Response to Comment #77.
79. STR-C2 - Provide a cleanout elevation for sediment and a stake within detention pond for
monitoring.
Response:
Sediment stake and cleanout elevation added to the detention pond detail.
80. STR-C2 – Although a note is provided to incorporate anti- seep collars, specify locations of the anti-
seep collars along the 8-inch CPP outlet, and provide sizing per NYS Standards for Erosion and
Sediment Control.
Response:
Anti-seep collars are added to the plans. See details on Sheet STR-C3.
81. STR-C3 – Provide copolymer steps within catch basin and specifications for permanent
stabilization.
Response:
Catch basin detail updated to include copolymer steps, See CLA-C4.
82. STR-C3 – Filter fabric and pea gravel surrounding the lower 0.6-ft diameter orifice should be
considered, similar to the outlet on the northern detention basin.
- Designs that Build –
Page 61
Dakota Concrete / Dakota Recycling Response to Comments
Page 16
Response:
The low flow orifice shown on STR-C3 is equipped with adequate protection as shown in the orifice
protection detail. Orifice is protected with 4” CMP and wire mesh preventing passing of 1/8”
solids.
83. Site Survey – The survey should be updated to match the existing condition features, utilities, and
topography on the site plans shown on Sheet CLA-01-CLA-09 and STR-R2.
Response:
The site survey has been updated; all drawings have been revised accordingly to incorporate the
updated survey information.
84. Site Survey – Does 50- wide access easement include provisions for truck queuing and concrete
plant encroachments (asphalt, drainage pipes, walls, etc.)?
Response:
Applicant has requested deed language.
Comparison Maps prepared by CLA Site
1. The following improvements to the concrete plant (Dakota Concrete Facility) have occurred since
the approved site plan as part of Resolution No. 20-03 of the Planning Board of the Town of
Cortlandt, New York dated June 3, 2003.
• Concrete block form area
• Trailers 1, 2,3
• Storage Trailer
• 20,000 gallon hot water tank
• Retaining walls.
• Conveyor Belt
• Furnace Room
• The impervious areas appear to have increased from 12,000 sf based on approved
plan to 31,500 sf currently. This was extrapolated from PDF.
Response:
All facility improvements made to the concrete facility listed above were made prior to the
Applicant taking over operations in July of 2023. Comparison maps have been provided to
illustrate the changes that have incurred and how both Recycling and Concrete are currently
operating.
Based on the approved site plan - Resolution No. 20-03, the total acreage of storage yard is 4.32.
For the concrete facility, 0.57 acres is shown as material storage area with approximately 0.16
acres (6,969 sf) paved. See Figure 1 - 2003 Material Storage Yard.
As a comparison, the current storage yard for both recycling and concrete overall, including Phase
1 not part of this application, is 4.22 acres. See Figure 2 – 2025 Material Storage Yard.
- Designs that Build –
Page 62
Dakota Concrete / Dakota Recycling Response to Comments
Page 17
The current concrete facility configuration shows the owner removed the slope and stockpile
storage area from the lower concrete facility and moved all the material storage up into upper
storage yard. A gravity block wall was installed to flatten and open up the lower area for more
useable space for the concrete operations. Approximately 0.56 acres (24,393 sf) of additional
impervious was created at that time at the concrete facility. It should be noted that the majority
of paved access road at the upper storage area was never built. Reducing the total paved area
overall.
2. The operation of the recycling facility (Dakota Recycling) expanded by 8,500 sf in the northwestern
portion of the lease area, as depicted on Figure 2, where there was a former parking area, depicted
on the approved site plan as part of Resolution No. 20-03 of the Planning Board of the Town of
Cortlandt, New York dated June 3, 2003.
Response:
The former parking area was utilized for material storage prior to the Applicant taking over
operations and continues to be used for Material Storage. This does not, however, result in an
expansion of the operation. See Figure 3 Overlay of the approved site plan resolution 20-03
compared to the current material storage area. There is a slight reduction in the overall material
storage yard.
3. There is a material of material storage, labelled Phase I, which has expanded into the HC zone of
Dakota Supply Corporation. This area was not delineated as storage on the approved site plan as
part of Resolution No. 20-03 of the Planning Board of the Town of Cortlandt, New York dated June
3, 2003.
Response:
Our understanding is that Phase 1 plans for Dakota Supply Corp have been submitted for site plan
approval and are not part of this application. Figure 3 shows the shift in material storage area
within Phase 1 from the approved site plan resolution 20-03. While some material has shifted
into the HC district (approximately 13,940 sf of material storage area), there is a decrease in the
overall material storage yard in Phase 1 area under the current condition.
4. Figure 1 displays a 0.55 ac storage area identified as 2003 Material Storage Yard. This does not
align with the original signed site plan approved by Resolution No. 20-03 of the Planning Board of
the Town of Cortlandt, New York, dated June 3, 2003.
Response:
Figure 1 comparison overlay illustrates that approximately 0.57 acres was utilized for the concrete
material storage area under the approved site plan resolution 20-03.
Dakota Concrete Services SWPPP
1. For the Dakota Concrete SWPPP (Section 8), was there a spill report with the DEC for the 2024 fire?
Response:
The spill report was for firefighting foam, there was no petroleum release. Closure report by Miller
Environmental Group, dated 4-28-25, was uploaded to portal.
- Designs that Build –
Page 63
Dakota Concrete / Dakota Recycling Response to Comments
Page 18
2. NYSDEC SPDES Multi-Sector General Permit For Stormwater Discharges Associated with Industrial
Activity GP-0-23-001, Part II.D (page 14) indicates the owner or operator must consider Parts II.D.1
through Part II.D.9 when selecting and designing BMPs to minimize stormwater pollutant
discharges. This Part does not require nor prescribe specific BMPs to be implemented; however,
consideration of all BMPs, whether determined to be appropriate or not, must be documented in
the SWPPP per Part III.A.7.
• How to prevent stormwater from interacting with, and contacting, pollutants and
pollutant sources;
• The use of BMPs in series or combination;
• Assessment of the type of pollutant, the quantity and nature of the pollutant(s), and their
potential to impact the water quality of receiving waters;
• Opportunities to combine the dual purposes of water quality protection and local flood
control benefits, including physical impacts of high flows on streams (e.g., bank erosion,
impairment of aquatic habitat, etc.);
• Opportunities to offset the impact of impervious areas of the facility on groundwater
recharge and base flows in local streams, taking into account the potential for
groundwater contamination (i.e., hotspots);
• Opportunities to attenuate flow using open vegetated swales and natural depressions;
• Conservation and/or restoration of the riparian buffers of streams and rivers.
• The use of treatment interceptors (e.g., swirl separators and sand filters); and
• Opportunities to implement enhanced BMPs for facilities that have the potential to be
impacted by future physical climate risks due to major storm events, stormsurge, seiche,
sea-level rise and flood events pursuant to the Community Risk and Resiliency Act (CRRA),
6 NYCRR Part 490, and associated guidance (e.g., “State Flood Risk Management
Guidance” (SFRMG) and “Estimating Guideline Elevations”).
The SWPP should be modified to clearly document the appropriateness of the bullet items.
Response:
The SWPPP is revised to include documentation demonstrating the appropriateness of the above
bulleted items based on project and regulatory requirements.
3. Drainage Area 2 is across the access easement and is apparently used as a truck staging area. The
staging of vehicles should be identified as such on the facility drawings.
Response:
The concrete truck staging areas are shown on the revised drawings.
4. SWPPP reference a Spill, Prevention, Control, and Countermeasure Plan, and one was not in the
application package of documents. Please provide.
Response:
A draft SPCC plan is included for review and comment.
5. Why does the Introduction reference an objective as “no suspended, colloidal, settable solids, or
residue from sewage or industrial waste?”
- Designs that Build –
Page 64
Dakota Concrete / Dakota Recycling Response to Comments
Page 19
Response:
This is standard language that we include in our description of primary objectives regarding
stormwater management and pollution prevention.
6. Provide a description of the proposed improvements being made to the facility as part of this
application. This shall include the total disturbance required.
Response:
The revised SWPPP clearly describes the proposed improvements to the facility included in this
application. The revised SWPPP also identifies the total area of new disturbance.
7. Section 7.0 states that the transfer process of material delivery is not a potential source of
stormwater pollutants. Please provide further clarification on this statement.
Response:
Portland cement, silica, and slag are delivered to the facility in dry bulk tanker trucks and
pneumatically transferred to the plant silos. This transfer process does not pose a potential source
of stormwater pollution, as the materials remain enclosed and have no opportunity to come into
contact with stormwater.
8. The SWPPP does not specify the facility’s analytical parameters and numeric/non-numeric limits
but reference Section VII of the General Permit. The full text of the NYSDEC MSGP is included; is
the intent to use that document to provide this information? If so, a more-specific reference is
recommended to provide clear guidance to the responsible person(s) onsite.
Response:
The facilities analytical parameters and numeric/non-numeric limits are added to the SWPPP.
9. Maintenance of the pretreatment sediment chambers, hydrodynamic separators, and detention
basin should be included in section 9.1.1 of the SWPPP
Response:
Section 9.1.1 is revised to include the pretreatment sediment chambers, hydrodynamic separator,
and detention basin.
10. Page 29 states the Contech Hydrodynamic separator is proposed, however, elsewhere in the
SWPPP it appears to be existing. Please clarify what the proposed improvements are to the site. If
this structure is proposed, provide construction details and sizing calculations.
Response:
The hydrodynamic separator is an existing structure. SWPPP narrative is revised, removing
language suggesting it is proposed.
11. Page 29 states the manufacturers inspection and maintenance requirements for the hydrodynamic
separator have been provided. These do not appear to have been provided. Please include these
in the SWPPP.
- Designs that Build –
Page 65
Dakota Concrete / Dakota Recycling Response to Comments
Page 20
Response:
Inspection and maintenance information was included in an earlier SWPPP. The material has been
incorporated into the current SWPPP.
12. Page 29 states the Contech Hydrodynamic separator has a treatment capacity of 1.5 cfs which
exceeds the calculated water quality treatment flowrate of 1.21 cfs for the combined Drainage
Areas DA-1 and DA-2. Appendix F excludes subcatchments DA-1 and DA-2. Please provide.
Response:
The CLA Site SWPPP hydraulic and hydrology analysis addresses only the proposed sediment
basin. Hydraulics and hydrology for the existing hydrodynamic separator were documented in a
previous SWPPP. A copy of that earlier SWPPP has been included with the application materials.
13. Page 30 indicates the design components of the on-site detention pond such as 4H:1V side slopes,
aquatic bench, accessible for maintenance. This information is not depicted on the plans. Update
the plan set or modify the text of the document.
Response:
Design components, not related to this project, are deleted from the SWPPP text.
14. Page 30 refers to sediment basin forebays. This appears to apply to the recycling center detention
basin. There are other references throughout the SWPPP that appear to apply to the Recycling
Facility SWPPP. Revise the SWPPP to only include required elements for the Concrete plant. If any
elements are located on the Recycling Facility, this should be clearly identified in the SWPPP.
Response:
The SWPPP is updated to include only those elements applicable to the concrete plant. It is also
revised to clearly state that the concrete washout area is located within the recycling facility.
Additionally, an Overall Site Plan (CLA-01) is added to the SWPPP to show the concrete washout
area within the recycling facility.
15. Sample events will also need the Storm Event Data form completed with each sample and should
also be used for when the quarterly visual monitoring accompanies a storm event.
Response:
The SWPPP states the Storm Water Event Data Form is required for each DMR sample in addition
to the Quarterly Visual Monitoring Inspections. The Storm Event Data Form is included in
Appendix E.
16. Revise paragraph 3 on page 37 to include the 100-year storm.
Response:
Paragraph 3 updated to include the 100-year rain event.
17. Appendix E – Provide inspections and maintenance requirements for post development best
management practices.
- Designs that Build –
Page 66
Dakota Concrete / Dakota Recycling Response to Comments
Page 21
Response:
Inspection and maintenance requirements for the pond, catch basin, and culverts are added to
Appendix E.
18. The SWPPP should be revised to include provisions to delay delivery of raw materials when a major
storm event is expected within 48-hours.
Response:
The SWPPP includes provisions delaying delivery of raw materials when a major storm is expected,
See Section 9.3.
19. Provide a discussion on the existing pre-treatment chambers and how they were previously sized.
Response:
Sizing of the pre-treatment chambers was included in a previous SWPPP. A copy of the earlier
SWPPP is included for reference.
Dakota Recycling Services Montrose Facility SWPPP For Multi Sector Permit
1. SWPPP is being defined as SIC 5093 // SIC Description – Scrap and Waste Materials (N3). The MSGP
description of that code is “Scrap Recycling Facilities, Including Transfer Stations Accepting
Household Recyclables.” , These facilities are typically metal scrap and auto recycling; the SWPPP
specifically indicates they don’t take glass or metal.
The Applicant receive clean construction demolition materials consisting of rock, concrete, asphalt
pavement millings and aggregate and appear to generate materials from these onsite (incl.
Custom Blended Aggregate, Crushed Stone, Wall Stone, Light Stone Fill, Medium Stone Fill,
Tracking Pad Stone, Brownfield Fill, Pipe Backfill, Recycled Aggregate, and Recycled Concrete Sub-
base). Based on this, the designation doesn’t seem to match the site use. Is it possible this should
also be Sector E (if they produce stone materials and materials for the Concrete Services facility).
This office recommends the facility use be reviewed against MSGP Sector E with NYSDEC and other
sector definitions to ID an appropriate category, so no misconstrued uses take place on site.
Response:
We have permitted several construction and demolition recycling centers, which the DEC
classifies under SIC Code 5093-N3.
2. NYSDEC SPDES Multi-Sector General Permit For Stormwater Discharges Associated with Industrial
Activity GP-0-23-001, Part II.D (page 14) indicates the owner or operator must consider Parts II.D.1
through Part II.D.9 when selecting and designing BMPs to minimize stormwater pollutant
discharges. This Part does not require nor prescribe specific BMPs to be implemented; however,
consideration of all BMPs, whether determined to be appropriate or not, must be documented in
the SWPPP per Part III.A.7.
• How to prevent stormwater from interacting with, and contacting, pollutants and
pollutant sources;
• The use of BMPs in series or combination;
- Designs that Build –
Page 67
Dakota Concrete / Dakota Recycling Response to Comments
Page 22
• Assessment of the type of pollutant, the quantity and nature of the pollutant(s), and their
potential to impact the water quality of receiving waters;
• Opportunities to combine the dual purposes of water quality protection and local flood
control benefits, including physical impacts of high flows on streams (e.g., bank erosion,
impairment of aquatic habitat, etc.);
• Opportunities to offset the impact of impervious areas of the facility on groundwater
recharge and base flows in local streams, taking into account the potential for
groundwater contamination (i.e., hotspots);
• Opportunities to attenuate flow using open vegetated swales and natural depressions;
• Conservation and/or restoration of the riparian buffers of streams and rivers.
• The use of treatment interceptors (e.g., swirl separators and sand filters); and
• Opportunities to implement enhanced BMPs for facilities that have the potential to be
impacted by future physical climate risks due to major storm events, stormsurge, seiche,
sea-level rise and flood events pursuant to the Community Risk and Resiliency Act (CRRA),
6 NYCRR Part 490, and associated guidance (e.g., “State Flood Risk Management
Guidance” (SFRMG) and “Estimating Guideline Elevations”).
The SWPP should be modified to clearly document the appropriateness of the bullet items.
Response:
The SWPPP is revised to include documentation demonstrating whether the above bulleted items
are appropriate or inappropriate based on project and regulatory requirements.
3. Per the Site Plans and STR-R1, Dakota Supply Corp, is included in the watershed associated with
Dakota Recycling Services. Will Dakota Supply Corp require inclusion under this MSGP?
Response:
Separate NOIs were submitted to obtain coverage for each facility.
4. Why does the Introduction reference an objective as “no suspended, colloidal, settable solids, or
residue from sewage or industrial waste?”
Response:
This is standard language that we include in our description of primary objectives regarding
stormwater management and pollution prevention.
5. Provide a description of the proposed improvements being made to the facility as part of this
application. This should include the total disturbance required.
Response:
The revised SWPPP clearly describes the proposed improvements to the facility included in this
application. The revised SWPPP also identifies the total area of disturbance.
6. Section 6.0 indicates wall stone is produced on-site.
Response:
Section 6.0 is updated to show that the facility does not produce wall stone.
- Designs that Build –
Page 68
Dakota Concrete / Dakota Recycling Response to Comments
Page 23
7. Section 7.5 states that the concrete plant uses a pit in front of the maintenance building to wash
out the drums of the concrete trucks. The Dakota Concrete Services SWPPP identified this as
supplemental to the washout pit at the concrete plant. This SWPPP should be revised to indicate
this as well.
Response:
Section 7.5 is updated and states the washout pit adjacent to the maintenance garage is
supplemental to the pit at the concrete facility.
8. Self-containment of trench drains are not acceptable as previously mentioned herein. Please
update the SWPPP accordingly.
Response:
The trench drains are connected by buried piping to a yard catch basin, which discharges to the
detention pond.
9. Page 10 of the SWPPP indicates Dakota Concrete Services is outside of the drainage catchment
associated with Dakota Recycling Facility. However the Product Bins area associated with Dakota
Concrete Services is tributary to the watershed for the Dakota Recycling Service. Given these are
concrete products, NYSDEC should opine as to whether the Recycling Service SWPPP also include
Sector E?
Response:
Stockpiles consist of raw aggregate materials similar to those produced at the recycling facility;
therefore, Sector E does not apply to the recycling facility.
10. The SWPPP does not specify the facility’s analytical parameters and numeric/non-numeric limits
but reference Section VII of the General Permit. The full text of the NYSDEC MSGP is included; is
the intent to use that document to provide this information? If so, a more-specific reference is
recommended to provide clear guidance to the responsible person(s) onsite.
Response:
The facilities analytical parameters and numeric/non-numeric limits added to the SWPPP.
11. Section 7 refers to the C&D facility for potential pollutant sources; the sources appear to be for the
Concrete facility. Please clarify.
Response:
The potential pollutant sources listed in Section 7 are accurate. Note that the concrete truck
washout area identified is located across from the maintenance garage. This washout area, which
is within the recycling facility, is supplemental to the concrete facility, and is designated for
washing out concrete truck drums.
12. SWPPP reference a Spill, Prevention, Control, and Countermeasure Plan, and one was not in the
application package of documents. Please provide.
- Designs that Build –
Page 69
Dakota Concrete / Dakota Recycling Response to Comments
Page 24
Response:
A draft SPCC plan is included for review and comment.
13. Include the detention basin and its features in section 9.1.1 of the SWPPP.
Response:
Section 9.1.1 is revised to include the detention basin.
14. Where does the secondary containment drainage system reference in section 9.1.1 discharge to?
Response:
The secondary containment for Tanks 4 and 5 is located within a drainage area that is
incorporated into the Concrete Plant SWPPP. Accordingly, Section 9.1.1 is revised to remove the
discussion regarding diked secondary containment.
15. Section 9.1.1 – Please include an explanation of Tank 10 within Section 9.1.1 Bulk Storage
Secondary Containment.
Response:
The tank formally identified as Tank 10 is a mobile tank (New ID of Mobile Tank A) and is not
required to be included on the facility’s tank registration. The Tank 10 now refers to a 1,000 gal.
diesel tank located on the Dakota Supply Corp. property. The 1,000 gal. tank has been added to
the Westchester County PBS registration. Section 9.1.1 is updated to include a discussion of
Mobile Tank A.
16. Page 30 references extended detention. Is extended detention being provided?
Response:
Permanent pool, included in the pond design, and temporary storage of 1 year storm provides
extended detention.
17. Revise paragraph 3 on page 37 to include the 100-year storm.
Response:
Paragraph 3 is updated to include the 100-year rain event.
18. SWPPP has a concrete washout plan, for the benefit of Dakota Concrete Services facility? Has
NYSDEC opined on additional site stormwater testing?
Response:
The improved concrete wash system is a self-contained closed system; water will be treated prior
to being used in the processing plant for dust suppression. There is no discharge of untreated
wash water. DEC coordination and additional testing is not required.
19. Sample events will also need the Storm Event Data form completed with each sample and should
also be used for when the quarterly visual monitoring accompanies a storm event.
- Designs that Build –
Page 70
Dakota Concrete / Dakota Recycling Response to Comments
Page 25
Response:
The SWPPP is updated stating that the Storm Water Event Data Form is required for each DMR
sample in addition to the Quarterly Visual Monitoring Inspections. The Storm Event Data Form
has been added to Appendix E.
20. Section 10.3 of the SWPPP indicates the detention pond has been modeled and able to intercept
and filter the design storms analyzed without overtopping and accommodates the water quality
volume for the 90% rainfall event. Please explain how the runoff is filtered, and the water quality
volume is accommodated.
Response:
Water is not filtered; instead, water quality is provided through a permanent pool and extended
detention in accordance with NYSDEC design manual criteria.
21. The SWPPP should be revised to include provisions to delay delivery of raw materials when a major
storm event is expected within 48 hours
Response:
The SWPPP includes provisions delaying delivery of raw materials when a major storm is expected,
See Section 9.3.
22. Appendix E – Provide inspections and maintenance requirements for post development best
management practices.
Response:
Inspection and maintenance requirements are added to Appendix E of the SWPPP.
23. Although the Multi Sector SPDES Permit may not require attenuation of runoff, the Town requires
a pre-development analysis to confirm there is no increase in runoff being discharged off-site due
to the improvements.
Response:
The site is an existing recycling facility that has been in operation for 15 years, there are no
substantial improvements planned. Additionally, impervious cover will not increase as a result of
this project. Because there is no change in impervious area or hydrology, a pre- and
post-development analysis is not required for this facility.
24. Provide sizing for outlet protection of 30-inch CPP based upon 25-year design storm.
Response:
The 30” CPP pipe is sized based on the 100-year storm event. See detail on Drawing STR-R5.
Bulk Storage
1. There are ten (10) ASTs ranging in size from 250 to 2,000 gallons in size. Registration renewal
paperwork has been submitted, and they are awaiting a response from WCDOH. Please provide a
response from WCDOH.
- Designs that Build –
Page 71
Dakota Concrete / Dakota Recycling Response to Comments
Page 26
Response:
The current WCDOH PBS Certificate, issued June 20, 2025 and expiring April 4, 2027, is attached.
2. The facility type is listed as “Manufacturing.”, Why wasn’t it listed as 99 “Other” with a description
of the concrete recycling
Response:
The PBS registration covers both facilities. Facility type does not affect regulation of the tanks.
3. The fuel type in Tank #2 is listed as gasoline or “0009”. Does it contain ethanol? If so, it should be
listed as Gasoline/Ethanol or “2712.”
Response:
Tank 2 does not contain ethanol.
4. Tanks 7, 8, and 9 are located within the maintenance garage and the building itself is listed as
secondary containment. The concrete floors would act as leak detection, but not necessarily
containment. Are there floor drains or other structures which could potentially convey spilled fuel
to the subsurface?
Response:
There are no floor drains inside the building. Improvements for secondary containment for Tanks
7, 8 and 9 are proposed as part of this project to be in compliance with SPCC and New York State
PBS regulations.
5. Tank 6 is located within the furnace room? Are there floor drains or other structures which could
potentially convey spilled fuel to the subsurface?
Response:
Tank 6 is located where the Furnace Building once stood. The tank is a double wall tank (integral
secondary containment) with spill and overfill appurtenances. The tank sits on a compacted gravel
pad.
6. 06 NYCRR Part 614, subpart 4 and as listed in DER-25, PBS Inspection Handbook indicates the
following:
E. Secondary Containment for Tanks Less Than 10,000 Gallons
Any AST with a capacity of less than 10,000 gallons that is in close proximity to waterbodies
of the State is required to either have secondary containment or utilize a design/technology
such that a discharge is not reasonably expected to occur. Facilities within 500 horizontal feet
of the following resources are considered to be in close proximity to ground or surface waters:
• Perennial or intermittent stream;
• Public or private well;
• Primary or principal aquifer as defined in USGS Water Resource Investigation Reports 87-
4274, 87-4275, 87-4276, 87-4122, 88-4076, and Appendix C;
• Wetlands as defined in 6 NYCRR Part 664;
- Designs that Build –
Page 72
Dakota Concrete / Dakota Recycling Response to Comments
Page 27
• Lake/pond, estuary, etc.; or
• Storm drain.
For tanks that are within 500 horizontal feet of the above resources, DEC requires that a
storage tank and its associated equipment be designed to prevent discharges from occurring
or that a dike system be installed to prevent such discharges from reaching the environment.
Discharges from a tank system may occur due to:
• Overfills from the fill port, vent and/or emergency vent;
• Spills at the fill port from the delivery hose;
• Leaks from valves, pumps or other connections to the tank;
• Flow from valves left open either by accident or by vandals;
• Vehicular traffic that could contact the tank and cause it to rupture;
• Flooding and flotation;
• Fires around the tank that could cause the tank to weaken, rupture or overflow; and
• Vandalism with ballistics.
Tanks 1, 2, 3, 6, 7, 8, and 9 are all within 500-ft of the wetland located on the adjacent property
along northeastern boundary of the property.
Tanks 1, 2 ,3, 6, 7, 8, and 9 are located less than 100-ft to proposed detention ponds.
Please provide a letter from the WCDOH indicating these specific tanks do not require secondary
containment or utilize a design/technology such that a discharge is not reasonably expected to
occur, due to the proximity to the off-site wetland and on-site storm drains.
Response:
The outdoor tanks are fully compliant with the SPCC regulations regarding secondary
containment, spill and overfill protection, and the corresponding DEC Part 613 regulations
including protection from vehicular traffic (bollards, gravity blocks or other means of separation)
and vandalism (site security is provided by locked gates during non-operating hours).
Improvements for secondary containment for Tanks 7, 8 and 9 are proposed as part of this project
to conform to SPCC and New York State PBS regulations. A draft SPCC plan is included with this
submittal for review and comment.
Air Permitting
1. The cover letter from the Westchester County Health Department (dated 5/12/2025) regarding
new permits issued for DRS makes a reference to a total of 26 emission points for which the Permit
Numbers 52-10124 through 52-10149 are assigned. The only air permit provided for review was
Permit Number 52-10124, issued for emission point EPJ01. Permit Numbers 52-10125 through 52-
10149 are missing. Please provide.
Response:
Emission Point Certificates to Operate for all of the emission points are included with this
submittal.
- Designs that Build –
Page 73
Dakota Concrete / Dakota Recycling Response to Comments
Page 28
2. The cover letter also makes a reference to “emission limits” not to be exceeded as a result of the
applicant’s activities (re: DRS). It is unclear what the “emission limits” are, as the letter does not
provide any reference in that regard. The letter further states that the applicant’s activities shall
not “contravene” the applicable provisions of State and County Air Pollution Control Regulations.
Again, without citing or providing any specific Part(s) or Subpart(s) of the state or county air
regulations, it is unclear what the specific compliance requirements might be. Please clarify.
Response:
WCDOH air permits typically include applicable limits in the Emission Point Certificate to Operate
(CO) issued by WCDOH (Appendix A of each CO) and the CO subjects the emission points to
applicable requirements in the County and State air regulations. Emission Point Certificates are
attached for all of the emission points.
3. In reviewing the County’s Sanitary Codes, Section 873.1326, Article XIII (“Air quality; Standards”)
states that in determining compliance with the provisions of the codes, the County Health
Department may be guided by the provisions of Chapter III of the NYSDEC air regulations or by
local municipality. No specific citation(s) of reference to either the state regs or local municipality
ordinances is provided. Please clarify.
Response:
Application for State Facility Air Registration has been submitted for the recycling facility.
Concrete batching is exempt from State air regulations.
4. Condition 1 - DRS Certificate to Operate (Permit Number: 52-10124) - states that the source shall
be operated in compliance with the provisions of the County Health Department’s laws (Chapter
873, Article XIII) and the air pollution control regulations contained in 6NYCRR of the State of New
York. This is a general statement (and quite vague) as it does not provide any specific reference to
any applicable provisions. (NYSDEC air regulations are contained in 6NYCRR, Chapter III, and
covers Parts 200 through 257.) Please clarify.
Response:
The facility demonstrated compliance with the applicable regulations to the satisfaction of the
WCDOH in order to obtain the Certificates to Operate. The facility will operate the permitted
equipment in accordance with the Certificates to Operate and applicable regulations.
5. It should be noted that the only emission limit mentioned in the DRS Permit issued by the County
is the opacity limit for airborne dust (as fugitive emissions) from loading the crusher hopper by
excavator, which is set at a max. of 7%. Section 873.1311 and Section 873.1312 of the County
Sanitary Codes limit the opacity from any air contamination source to a max. of 20%, as
determined by a trained certified observer using the USEPA Reference Method 9.
Response:
Noted, opacity is the only applicable limit.
6. Condition 5 - DRS Certificate to Operate (Permit Number: 52-10124) – makes a reference to an
“attached Appendix A,” that is missing/not found. Condition 5 specifically states that “the emission
from this source of air contamination shall not exceed those set forth on the attached Appendix
A.” Please provide Appendix A.
- Designs that Build –
Page 74
Dakota Concrete / Dakota Recycling Response to Comments
Page 29
Response:
Appendix A refers to a one-page appendix attached to each individual permit Emission Point
Certificate to Operate that lists the permitted contaminants and associated emission limits. A
complete set of certificates are attached.
Please note CLA SITE, in conjunction with the Applicant and Zarin & Stienmetz, are working to comply with
the Town as expeditiously as possible. Please contact me if you require any clarification or additional
information.
Best Regards,
Peter Loyola, ASLA
Principal
CC:
- Designs that Build –
Page 75
Page 76
New York State Department of Environmental Conservation
Division of Materials Management, Region 3 .
21 South Putt Corners Rd., New Paltz, NY 12561-1696
Telephone: (845) 256 3134 Fax: (845) 255-3414
Joe Martens
Commissioner
' . ; .: >.:.
. January 3, 2012
Jay Bilotta
. .. , . Oakota Supply Corp .. ,-:" :' ~~I;: '" . p ."
.. · 107 Albany Post ROad •.. :","(;. : ..~ rl . . . !;
Montrose NY 10548 .
RE:60W27 DAKOTA SUPPLY CORP., 170 ALBANY POST ROAD,' MONTROSE
Dear ML Bilotta,
Enclosed is a validated copy of your registration form which was submitted to the Department pursuant
to 6NYCRR Part 360, effective November 26, 1996. One copy of this form must be maintained at this
facility.
You are reminded that Part 360 contains General Provisions (Subpart 1) and C&D Processing Facilities
(Subpart 16) requirements that must be followed to warrant your facility's continued status as a registered
facility. This registration does not preclude your facility from adhering to all other applicable federal,
stilte and local requirements.
If you have any questions regarding this matter, please do not hesitate to call me at (845) 256-3134.
Region 3, Division of Materials Management
cc: L. Vitrone, Deputy Commissioner, Westchester County Department of Environmental Facilities
T. Laibach
Page 77
DEPARTMENT OF ENVIRONMENTAL CONSERVATION DEPARTMENT USE ONLY
DIVISION OF SOLID &HAZARDOUS MATERIALS
~ REGISTRATION FOlli~ FOR A
~ SOLID WASTE MANAGE~ENT FACILITY
Please read and before
this
1 FACILITY NAME AND LOCATION
Street 167 Albany
City/Village
Town Mon!rose Westchester Code New York 110548
3. FACILITY OPEHATOR'S NAME (if different) 4. SITE OWNER'S
I ing Address
Ci
Code Code
Number
lapp] icable)
is units
o [360-13,1
Waste Tire Stored for On-site
Cd) (1) (i i) 1
Recovery
Tire Dealers Sell -13,1 (l)(iii) J
ng Debris Landfi lis three acres or less
1 Tire Manufacturing Facilities (iv) 1
Transfer Stat
receiving less
househo ld so 1id
Transfer Stations Iy Uncontaminated Process
less than 50, cubic yards or 12,500 tons Facilities [360-16,
sol id waste annually 11.1 (b)(2) 1
Other Facilities not specifically described above,
o specify type
o Waste Tire Retreaders
6. SOLID WASTE HANDLED 7. - Normal schedule
a, List wastes and/or , 8 AM ·.5 PM M'onday - Friday
Clean so~l. rock.,corycrete ~nd asphai! pavement and sidewalk.
b, 8. NAME(S) OF ALL ~fUNICIPALITIES SERVED--<./""'IIJ'---_ _
9. CERTIFICATION: I that information on this form and attached statements
and exhibits was nrF'n>lrPfl direction and true to the best of my knowledge and
bel ief, and that the authori ty as Vice Presidenl 't i tie) 0 f Dakota Suppty Corp
to this istration form pursuant to 6 NYCRR Part 360. this
read lations and will abide all conditions
false is punishable as a A misdemeanor
Pri Mo. Year
If ILtj III
Page 78
Instructions for
REGISTRATION FO&~ FOR A SOLID
of Environmental Conservation
Make effort to enter in
fu!l and complete answers
,
Ent~;: and address of the- fae iii a United States
available map of similar scale location of the facility.
2. or person who owns the facility.
3. or person for. the overa II
4 .. or on .whl ch the faci I or who wi 1I own .thes! te ·on which the
lL than the current
5 Check all the appropriate boxes that describe tne facility that is the of th is
6. a. Enter the types of wastes to be the fad I i ty.
b. indicated in units appropriate to the
fad I i ties to indicate number of waste
7. Indicate the normal schedule of facility operation (Le. 9:00 a.m. to 5:00 p.m ..
closed Sunday).
8 Enter name of al mnnic i ties , cities, towns and/or vii in the and/or servi
area the facility.
9. The certification block must be completed by the registrant.
10. retain #4 and submit copies to Solid & Hazardous Materials
Sol
Is
NYSDEC - Region 3
1 Hunters Plaza 21 South Putt Corners Road
47-40 21st Street New Paltz, NY 12561-1695
Long Island C NY 11101-5407 (845) 256-3137
8) 482-4996
Regional Solid & Hazardous
Materials
NYSDEC - NYSDEC 6
Route 86 - State Office Building
Ray Brook, NY 317 Washington Street
(518) 897-1241 Watertown. NY 13601-3787
(315) 785-2513
Page 79
Page 80
Page 81
Page 82
Page 83
Page 84
Page 85
Page 86
Page 87
Page 88
Page 89
Page 90
Page 91
Page 92
Page 93
Page 94
Page 95
Page 96
Page 97
Page 98
Page 99
Page 100
Page 101
Page 102
Page 103
Page 104
Page 105
Page 106
N
P P Y N
0 C N S
58 Church Street, Suite 200
68 N C N S Saratoga Springs, New York 12866
Phone: 518.584.8661
2003 www.clasite.com
S Y
: 4.32 C S
P
P PP C N :
Contact: e anganello
halle n ustries, nc.
51 oute 100
riarcli anor, New York 10510
Phone: 14. 62.3415
P P Y N :
ilotta ealt o estchester,
nc. an riga nterprises nc.
20 l an Post ,
ontrose, NY 10548
Phone: 14. 3 . 8 1
Phase 2
akota
3. 5 C ec cling Ser ices
an
akota
Concrete Ser ices
own o Cortlan t,
estchester, New York
ate e ision rawn
01 20 2026 own ngineer s Comments
Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
P.C. It is a violation of the New York State Education Law for any
unauthorized alterations to this document as per Article 145 and 147.
0.5 C
Pro ect No. 20 1104 rawn :
0.16 C ate: 05 2 2025 Checke : S
Sheet 1 o 3
2003 aterial Storage Yar
0 40
20 80
Figure 1
Page 107
60
N
P P Y N P S 2025
S Y
1.00 C S
90
S N
70
50
P S 2025
80
50
60
S Y 52 58 Church Street, Suite 200
3.22 C S
54
0 C N S Saratoga Springs, New York 12866
70
56 Phone: 518.584.8661
: 4.22 C S 6058
40
SILT 6462 www.clasite.com
68 N C N S 66 5658 62
60
50
SILT
68
96
4 SILT 70 60
10 56 62
60
SILT
C
S
20 F
102 100
64
a
ld Are
P PP C N :
e
ximat
100
ing Fie
Appro
66
98
68
Contact: e anganello
Leach
94
96
70
94 halle n ustries, nc.
7
51 oute 100
92
riarcli anor, New York 10510
Phone: 14. 62.3415
62
100
64
66
W
92 6' Chain Link Fence
68
Sewer Late
P P Y N :
60
70
100 SILT
W
72
50
ence
74
90 ilotta ealt o estchester,
ral
ink F
W
W
ain L
nc. an riga nterprises nc.
76
SILT
4' Ch
20 l an Post ,
90 ontrose, NY 10548
P S Phone: 14. 3 . 8 1
90
100 3.22 C
ate
LFG
110
4' C
Phase 2
D
88
120
Existing Material
ROA
C
Storage Bin
akota
F S
94
88
akota ec cling
0
ec cling Ser ices
12
Proposed Garbage Container
20
APPROXIMATE LEASE LINE,
6' Fence Enclosure
und
0
11
n Gro
an Concrete
4' CL
an
ge O
SEE LEASE AGREEMENT
92
F
T
a
Stora
g Are
86
POS
Block
0
akota
10
Parkin
ncrete
40
ng Co
50
P S
60
70
80
akota Suppl Concrete Ser ices
Existi
lt
Aspha
E
1.00 C
MATERIA
Corp.
E
MATERIAL STORAGE ON GROUND
LEASE LINE
ANY
L STORAG
ilotta
E
On Ground
own o Cortlan t,
MATERIAL STORAGE ON GROUND
ce
E ON GRO
E
86
erial Storage
k Fen
estchester, New York
ALB
ain Lin
M1
C
E
4' Ch
Existing Mat
UND
ZON INE H
w
88
G W
INE
E
50
50
50
G W
50
Water Valve
60
70
80
G W
80
Gas Valve
ate e ision rawn
G
E L
E
E L
W
G
01 20 2026 own ngineer s Comments
E
94
94
W
ZON
S
94
G
S
90
E
S
W
84 S
OUND
MATER
N GR
Mason
AGE O
STOR
RIAL
IA
MATE
Yard
L STOR
92 Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
Office
P.C. It is a violation of the New York State Education Law for any
AGE O
92
unauthorized alterations to this document as per Article 145 and 147.
all
UND
g W
GRO
N GRO
OE
ON
AGE
tainin
TOR
IAL S
e Re
ER
UND
MAT
90
W
ND
60
60
Ston
ROU
50
NG
88
App W
GE O
rox.
RA
STO
86
OE
Loc
L IA L
META
atio
'X60' G TER C Pro ect No. 20 1104 rawn :
n of W
Sto
ne D 40 MA S
Exis
Ret OSE ILDI N 20 F
ain PROP RAGE BU
t.
2" W
ing
Wa S TO
94 ate: 05 2 2025 : S
ater W
ll Checke
Line
OE
EX Sheet 2 o 3
W
W
4' C IST
Conc. Vault PP h
EX
IST ING
ain L
82 W i nk F
e nce
W
ING
RE
BA
PIP
E ST
OR
R RA 94
AG
92
W CK E
90
W
Rebar Fnd. On Line
W
94
W
W 88 ST EXIS
OR TI
AG NG
W 86 92 E & PI
CU PE
W
LTE
90 CS W
54
W
84 W W
W
W
W
PP
2025 aterial Storage Yar
52
50' Wide Easement
0 40
50
64
62 48
20 80
Figure 2
46
42
66
44
Page 108
60
LEGEND
PROPERTY LINE PHASE I 2025 MATERIAL 2003 MATERIAL
STORAGE YARD STORAGE YARD
1.00 ACRES TOTAL : 4.32 ACRES
90
LEASE LINE
70
50
PHASE II 2025 MATERIAL
80
50
60
STORAGE YARD 52 58 Church Street, Suite 200
3.22 ACRES
54
70 MAJOR CONTOURS Saratoga Springs, New York 12866
70
56 Phone: 518.584.8661
TOTAL : 4.22 ACRES 6058
40
SILT 6462 www.clasite.com
68 MINOR CONTOURS 66 5658 62
60
50
SILT
68
96
4 SILT 70 60
10 56 62
60
SILT
CK
SETBA
20 FT
102 100
64
a
ld Are
OPERATOR/APPLICANT :
e
ximat
100
ing Fie
Appro
66
98
68
Contact: Jeff Manganello
Leach
94
96
70
94 Thalle Industries, Inc.
7
51 Route 100
92
Briarcliff Manor, New York 10510
Phone: 914.762.3415
62
100
64
66
W
92 6' Chain Link Fence
68
Sewer Late
PROPERTY OWNER:
60
70
100 SILT
W
72
50
ence
74
90 Bilotta Realty of Westchester,
ral
ink F
W
W
ain L
Inc. and Briga Enterprises Inc.
76
SILT
4' Ch
2099 Albany Post Rd,
90 Montrose, NY 10548
PHASE II Phone: 914.737.7891
90
100 3.22 AC
ate
LFG
110
4' C
Phase 2
D
88
120
Existing Material
ROA
ACK
Storage Bin
Dakota
ETB
FT S
94
88
Dakota Recycling
0
Recycling Services
12
Proposed Garbage Container
20
APPROXIMATE LEASE LINE,
6' Fence Enclosure
und
0
11
n Gro
and Concrete
4' CL
and
ge O
SEE LEASE AGREEMENT
92
F
T
a
Stora
g Are
86
POS
Block
0
Dakota
10
Parkin
ncrete
40
ng Co
50
PHASE I
60
70
80
Dakota Supply Concrete Services
Existi
lt
Aspha
E
1.00 AC
MATERIA
Corp.
E
MATERIAL STORAGE ON GROUND
LEASE LINE
ANY
L STORAG
(Bilotta)
E
On Ground
Town of Cortlandt,
MATERIAL STORAGE ON GROUND
ce
E ON GRO
E
86
erial Storage
k Fen
Westchester, New York
ALB
ain Lin
M1
C
E
4' Ch
Existing Mat
UND
ZON INE H
w
88
G W
INE
E
50
50
50
G W
50
Water Valve
60
70
80
G W
80
Gas Valve
Date Revision Drawn
G
E L
E
E L
W
WD
G
01/20/2026 Town Engineer's Comments
E
94
94
W
ZON
S
94
G
S
90
E
S
2003 MATERIAL
W
84 S
OUND
STORAGE YARD
MATER
N GR
Mason
AGE O
STOR
RIAL
IA
MATE
3.75 AC
Yard
L STOR
92 Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
Office
P.C. It is a violation of the New York State Education Law for any
AGE O
92
unauthorized alterations to this document as per Article 145 and 147.
all
UND
g W
GRO
N GRO
OE
ON
AGE
tainin
TOR
IAL S
e Re
ER
UND
MAT
90
W
ND
2003 MATERIAL
60
60
Ston
ROU
50
NG
88
App W
GE O
rox.
A
TOR
86
OE
STORAGE YARD
Loc
LS
META
L ERIA ACK
atio
'X60' G MAT TB Project No. 20-1104 Drawn By: WD
n of W
Sto
ne D 40 T SE
Exis
Ret OSE ILDI N 20 F
PROP RAGE BU
0.57 AC
ain
t.
2" W
ing
Wa S TO
94 Date: 05/27/2025 Checked By: SEM
ater W
ll
Line
OE
EX Sheet 3 of 3
W
W
4' C IST
Conc. Vault PP h
EX
IST ING
ain L
82 W i nk F
e nce
W
ING
RE
BA
PIP
E ST
OR
R RA 94
AG
92
W CK E
90
W
Rebar Fnd. On Line
W
94
W
W 88 ST EXIS
OR TI
AG NG
W 86 92 E & PI
CU PE
W
LTE
90 CS W
54
W
84 W W
W
W
W
PP
2003 & 2025 Material
52
50' Wide Easement
0 40'
Storage Yard Comparison
50
64
62 48
20' 80'
Figure 3
46
42
66
44
Page 109
PHASE 2
PROPOSED WORK AT THE FACILITY INCLUDES THE FOLLOWING: DAKOTA RECYCLING SERVICES AND DAKOTA
LOCATION MAP RECYCLING FACILITY CONCRETE SERVICES
Albany Post Road
1. EXPANDED DETENTION POND.
2. DELINEATED EMERGENCY TRAFFIC LANE. 2099 Albany Post Rd,
3. UPDATED TRACK PAD AREA, RAISED ASPHALT BERMS, AND WHEEL WASH AREA.
4. CONCRETE WASHOUT IMPROVEMENTS AT RECYCLING FACILITY. Westchester County, NY 10548
CONCRETE FACILITY
5. GENERAL STORMWATER IMPROVEMENTS AT THE CONCRETE PLANT AREA. 05-27-2025
US Highway 9
6. PROPOSED DETENTION POND. Revised 09-26-2025
7. IMPROVED RAISED ASPHALT BERMS.
77 EAST CENTRAL AVE LLC 8. FIRE HYDRANT TO BE MADE OPERATIONAL FOR FIRE SUPPRESSION IN Revised 12-12-2025
TAX PARCEL
COMPLIANCE WITH 10 STATE STANDARDS. Revised 01-20-2026
#54.12-3-5 2114 APR LLC
TAX PARCEL
#54.8-2-29 PARKING REQUIREMENTS OPERATOR/APPLICANT :
REQUIRED -15 TOTAL EMPLOYEES FOR
MILITO JAMES CONCRETE AND RECYCLING Contact: Jeff Manganello
TAX PARCEL TIM COOK INC
2103 ALBANY POST TAX PARCEL
FACILITIES Thalle Industries, Inc.
#54.12-3-6 PROVIDED- 15 PARKING SPACES PROVIDED
ROAD INC #54.8-2-28 51 Route 100
TAX PARCEL
#55.9-1-1 DAKOTA RECYCLING Briarcliff Manor, New York 10510
Phone: 914.762.3415
DUTCH STREET LLC
TAX PARCEL
D & N HOUSING LLC
TAX PARCEL
FACILITY
#54.12-3-7 #55.9-1-2 TAX PARCEL PROPERTY OWNER:
#55.9-1-3 Bilotta Realty of Westchester, Inc. and Briga Enterprises Inc.
2099 Albany Post Rd,
DUTCH STREET LLC Montrose, NY 10548
TAX PARCEL Phone: 914.737.7891
#54.12-3-8
LEAD CONSULTANT:
Str eet
Dutch
Cortlandt
DAKOTA SUPPLY CORP.
Train
Filename: Z:\01_Project _Files\20-24-1104 Thalle Dakota Recycling SWPPP\03_CAD\20-1104 CLA-00 Cover Sheet.dwg // Last Saved On: 1/21/2026 // Plotted By: Wenxin Dai // Plotted: 1/21/2026 3:06:30 PM
Refer to Phase 1
Station
Site Plan
TAX PARCEL
#55.9-1-3 58 Church Street, Suite 200
Saratoga Springs, New York 12286
INE
US VETERANS HOSPITAL Phone: 518.584.8661
TAX PARCEL Fax: 518.584.8651
#54.16-3-1 METRO-NORTH Contact: Peter Loyola, RLA, ASLA
SE L
PECKHAM MATERIALS CORP
TAX PARCEL COMMUTER RAIL CO
TAX PARCEL
d #55.9-1-5
al R #55.9-2-1
spit
LEA
Ho SITE PLAN DRAWING SET
rans
PEOPLE OF THE STATE OF NY
Vete
TAX PARCEL Fdr DRAWING INDEX
#54.16-3-1.1
Page Sheet
Sheet Description
No. Title
US Highway 9
METRO-NORTH COMMUTER RAIL
TAX PARCEL
DAKOTA CONCRETE 1 CLA-01 Overall Site Map
#55.9-1-6
FACILITY 2 CLA-02 Recycling Facility Site Plan
US VETERANS HOSPITAL
METRO-NORTH COMMUTER RAIL TAX PARCEL 3 CLA-03 Recycling Equipment Spread Enlargment
TAX PARCEL
TAX PARCEL #55.9-1-6
#55.9-1-3 4 CLA-04 Recycling Equipment Emission Point Locations
#54.16-3-1
ad
5 CLA-05 Recycling Equipment Emission Point Locations
Post Ro
ive
6 CLA-06 Concrete Facility Site Plan
ial Dr
METRO-NORTH COMMUTER RAIL
TAX PARCEL 7 CLA-07 Concrete Equipment Details
Albany
#55.9-1-7
or
8 CLA-08 Concrete Truck Washout Layout Plan
Mem
9 CLA-9A Plumbing Plan
10 CLA-9B Plumbing Plan Details
0 150' 11 CLA-9C Electric Plan
12 CLA-9D Electric Plan Details
75' 300'
13 CLA-10 Fire & Emergency Response Access Plan
14 CLA-11 General Details
R-G
NOTES: 15 STR-R1 Recycling SWPPP Drainage Plan
1. ALL CONDITIONS OF APPROVAL AS NOTED IN LETTERS OF APPROVAL OR FINDINGS BY DEPARTMENTS OR AGENCIES
CC HAVING JURISDICTION ARE INCORPORATED INTO THE APPROVED SITE PLANS. 16 STR-R2 Recycling Detention Pond Existing Conditions
R-15
REFORMED CHURCH OF
CORTLANDTOWN
17 STR-R3 Recycling Detention Pond Proposed Conditions
18 STR-R4 Recycling Detention Pond Details
MOUNT AIRY NURSERY SCHOOL
DAKOTA RECYCLING & R-80 19 STR-R5 Recycling Detention Pond Details
CONCRETE FACILITY
M-1 20 STR-R6 Recycling Detention Pond Details
21 STR-C1 Concrete SWPPP Drainage Plan
PROS
R-160
22 STR-C2 Concrete Detention Pond Proposed Conditions
M-1 LIGHT INDUSTRIAL
HC/9A HIGHWAY COMMERCIAL/
MULTI FAMILY SEC 23 STR-C3 Concrete Detention Pond Details
278
24 STR-C4 Concrete Detention Pond Details
R-15 SINGLE FAMILY
RESIDENTIAL
R-80 SINGLE FAMILY
RESIDENTIAL
25 SURVEY Site Survey
R-160
R-G
PROS
RESIDENTIAL
GENERAL RESIDENTIAL
PARKS RECREATION &
HC/9A ZONING MAP
SEC 278
CC
OPEN SPACE
COMMUNITY COMMERCIAL
SCALE: 1"=500' TOWN SIGNATURE BLOCK LIC. NO.
CLA SITE
LIC. NO.
CLA SITE
Page 110
60
LEGEND
DAKOTA RECYCLING TIM COOK INC
TAX PARCEL THERE SHALL BE NO STORAGE OF
PROPERTY LINE 70 MAJOR CONTOURS DAKOTA RECYCLING SERVICES
PROCESSED MATERIAL LLC - OPERATION YARD SERVICES LLC #54.8-2-28 EQUIPMENT OVER THE SEWER
DISPOSAL AREA.
LEASE LINE 68 MINOR CONTOURS DAKOTA RECYCLING
4.58 ACRES UNDISTURBED AREA CONSTRUCTION 4
FENCE
90
0.70 ACRES
70
SERVICES LLC - GREEN SPACE CLA-11
50
80
50
60
INSPECTION BOUNDARY 70 PROPOSED CONTOURS INCOMING ROCK/CONCRETE 52
MIXED LOADS 58 Church Street, Suite 200
54
DAKOTA CONCRETE LLC INSPECTION PERIMETER Saratoga Springs, New York 12866
70
BUILDING SETBACKS EXISTING STORMWATER PIPE SETBACK TO BE KEPT CLEAR 56
6058 Phone: 518.584.8661
FOR INSPECTIONS
40
DRAINAGE DISCHARGE GRAVEL EMERGENCY SILT 6 62 www.clasite.com
66 4 5658 62
60
ACCESS ROAD PROPOSED STORMWATER PIPE POINT STORMWATER ACCESS ROAD
50
SILT
96
MONITORING 68
4 SILT 70 60
FENCE LINE 10 SILT FENCE UNDISTURBED AREA 56 62
60
SILT
OUTFALL 002
CK EXISTING 4'
SETBA RECYCLING
20 FT
102 100 2114 APR LLC CHAIN LINK
64
a
ld Are
OPERATOR/APPLICANT :
ximate
TAX PARCEL FENCE
CONCRETE PLANT EQUIPMENT
100 LIST
ing Fie
#54.8-2-29
Appro
66
DUTCH STREET98LLC EXISTING
68
Contact: Jeff Manganello
Leach
94
96
TAX PARCEL TRI-GALLERY
TRAILER 1 CONCRETE TESTING LAB SUBSUFACE SEWER
70
#54.12-3-8
94
DISPOSAL AREA
Thalle Industries, Inc.
TRAILER 2 LLC PLANT OFFICE/CONTROL ROOM PORTABLE TANK A
7
DUTCH STREET D & N HOUSING LLC 4' CHAIN LINK FENCE 800 GAL DIESEL 51 Route 100
92
TRAILER 3
TAX PARCEL
#54.12-3-8
CONCRETE BATCHING ADDITIVETAX AND
PARCEL EXISTING 1,000
GAL SEPTIC TANK
Briarcliff Manor, New York 10510
#55.9-1-2
CHEMICAL STORAGE Phone: 914.762.3415
62
100
BH BAGHOUSE
64
66
W
TOWER - TYPE I/II 92
6' Chain Link Fence
S1 CEMENT STORAGE
68
Sewer Late
PROPERTY OWNER:
60
70
100 SILT PROPOSED EXPANDED
W
S2 SILICA STORAGE DETENTION POND
72
50
ence
74
90 Bilotta Realty of Westchester,
S3 SLAG STORAGE
ral
ink F
W
W
ain L
Inc. and Briga Enterprises Inc.
76
SILT
4' Ch
PROCESSED SUBBASE MATERIAL
S4 TYPE I/II CEMENT STORAGE 2099 Albany Post Rd,
90 Montrose, NY 10548
PROPOSED DELINEATED PROPOSED TANK 7
EMERGENCY TRAFFIC LANE FRAC TANK 2,000 GAL USED OIL Phone: 914.737.7891
DAKOTA RECYCLING SERVICES
90 LLC 100
ate
PROPOSED TANK 8
LFG
INCOMING ROCK
110 AND
HOURS OF OPERATION PUMP CHAMBER 300 GAL
4' C
CONCRETE MIXED LOADS HYDRAULIC OIL
6AM TO 4PM PROPOSED
PROCESSED AGGREGATE AND ARMORED CHECK DAM TANK 9
Phase 2
D
88
MONDAY - SATURDAY (OR AS NEEDED) Existing Material
120
SUBBASE MATERIALS D50=6-8 INCHES 250 GAL MOTOR OIL
ROA
ACK
Storage Bin
EXISTING
Dakota
ETB
CONCRETE
FT S
DAKOTA CONCRETE 88 LLC 94
0
WASHOUT
Recycling Services
12
Proposed Garbage Container
20
APPROXIMATE LEASE LINE,
6' Fence Enclosure
round
HOURS OF OPERATION 11
0
On G
US VETERANS HOSPITAL
4' CLF
SEE LEASE AGREEMENT AREA DEDICATED FOR and
rage
6AM TO 4PM
92
T
a
TAX PARCEL
g Are
ck Sto
EMPLOYEE
86
POS
#54.16-3-1
USE BY DAKOTA
e Blo
0
MONDAY - SATURDAY (OR AS NEEDED) PARKING AREA (10)
Dakota
10
Parkin
oncret
40
CONCRETE LLC
ing C
50
60
70
TANK 2
80
GRAVEL ACCESS ROAD
Concrete Services
lt
Exist
Aspha
E 1,000 GAL GASOLINE
MATERIAL
TANK 1
E
LANDS N PECKHAM INDUSTRIES
MATERIAL STORAGE ON GROUND
2,000 GAL DIESEL
TANK 5
ANY
E
ST
e On Ground
275 GAL #2 FUEL OIL
ORAGE ON
DAKOTA SUPPLY TANK 4 Town of Cortlandt,
MATERIAL STORAGE ON GROUND
Fence
E
86
terial Storag
275 GAL #2 FUEL OIL
Westchester, New York
in Link
ALB
CORP.
GROUND
M1
C
CONCRETE TRUCK PROPOSED DETENTION
4' Cha
E
GATE
Existing Ma
ZON LINE H
w PARKING AREA POND
Refer to Phase 1 PROPOSED
88
W
G
1
INE
E
50
50
50
G W
WHEEL WASH PROPOSED BERM
50
Water Valve
60
70
80
G W
CLA-11 TANK 3
80
Site Plan
Gas Valve PAD Date Revision Drawn
G
E L
E
2,000 GAL DIESEL
TANK 6 PECKHAM MATERIALS CORP
W
TAX PARCEL 05/27/2025 Proposed infrastructure information update WD
G
1,000 GAL #2 FUEL OIL
E
94
94 EXISTING HOSE /NOZZLE
E
#55.9-1-5 WD
W
07/24/2025 Outfall Number Changed
ZON
S
94 LOCATION FOR WASH PAD
G
S
90
E
S
11/20/2025 Survey Update SEM
W
84 S
01/20/2026 Town Engineer's Comments SEM
PROPOSED ASPHALT
OUND
MATER
N GR2
Mason
AGE O MOUNTABLE CURB FOR
STOR
RIAL
CLA-11 STORMWATER DIVERSION
IA
MATE
Yard
L STOR
92 AT HIGH POINT Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
Office
P.C. It is a violation of the New York State Education Law for any
AGE O
92
unauthorized alterations to this document as per Article 145 and 147.
all
D
OUN EMPLOYEE
g W
N GRO
OE N GR
GE O
tainin
L ST
ORA PARKING AREA (5)
ERIA
e Re
N 15° 15'12" W
UND
MAT
90
W
ND
60
60
Ston
ROU CONCRETE BLOCK
50
10.00' N GPIT EXCAVATED
88
WASH
App W
GE O FORMS
rox.
ORA
86
OE
L ST INTO GRADE
Loc
TAL IA K
DAKOTA CONCRETE LLC
atio
0' ME TER BAC Project No. 20-1104 Drawn By: WD
n of W
Sto
n 40'X6 DING MA SET
eR
OSED RESIDUAL CONCRETE T
Exis
eta IL 20 F
PROP RAGE BU
t.
inin
2" W
g
Wa STO 94
DISPOSAL AREA
1.38 ACRES Date: 01/22/2025 Checked By: SEM
ater W
ll
Line
OE
CONCRETE TRUCK
EX WASH OUT AREA Sheet 01 of 25
W
Conc. Vault
W
PP 4' C
h ain L
EX
IST
IST
ING PROPOSED ASPHALT
82 W ink F
e nce
W
ING
RE
BA
PIP
E ST MOUNTABLE CURB, NO.1
OR
R RA 94
AG 2 PROPOSED ASPHALT
92
W CK E
90
W
Rebar Fnd. On Line
W
94 CLA-11 MOUNTABLE CURB, NO.2 OUTFALL 001
W
W 88 ST EXIS
OR TIN
EXISTING CONCRETE MANHOLE
AG G
86 92 W
E & PIP
CU E
W
WITH SOLID COVER
LTE
NOTES: 90 CS W
54
W
84 WITH
1. THERE SHALE BE NO STOCKPILING OF MATERIAL ASSOCIATED W W
DAKOTA RECYCLING SERVICES ON THE DAKOTA SUPPLY CORP LEASE AREA. W
W
W
PP
2. ALL STOCKPILES TO MEET THE HEIGHT REQUIREMENTS.
3. HOURS OF OPERATIONS: SHARED ACCESS ROAD OVERALL SITE MAP
52
Wide Easemen
50'DAKOTA t METRO-NORTH COMMUTER RAIL
RECYCLING SERVICE - 6AM TO 4PM MON-SAT, OR AS NEEDED TAX PARCEL 0 40'
DAKOTA CONCRETE LLC - 6AM TO 4PM MON-SAT, OR AS NEEDED
CONCRETE TRUCK #55.9-1-6 50
4. WATER FOR SPRAY HEADS IS PROVIDED USING HOSES THAT ARE DEPLOYED
SEASONALLY WHEN THE EQUIPMENT IS OPERATING.
5. THERE SHALL BE NO STORAGE OF EQUIPMENT OVER THE SEWER DISPOSAL
STAGING AREA,
SOUTH SIDE OF 64
62 48
20' 80'
CLA-01
46
42
ASPHALT BERM 66
AREA.
44
Page 111
70
56
6058
SILT 64 62
SUPERIOR SILT
66 56
PATRIOT 68
96
SILT
4 70
10 CONE 56
SILT
SILT
CRUSHER CK
SETBA
102 100 20 FT
58 Church Street, Suite 200
64
a
ld Are
ximate
Saratoga Springs, New York 12866
100
ing Fie
Phone: 518.584.8661
Appro
66
98 www.clasite.com
68
Leach
94
96
MAIN PLANT GENERATOR
70
94
ENCLOSURE
72
SUPERIOR
GUARDIAN CLOSED CIRCUIT SCREENING
92
SCREEN AND CRUSHING (MAIN) PLANT
EDGE TS-80 STACKER OPERATOR/APPLICANT :
EPP03
62
100 EPK01 Contact: Jeff Manganello
EPP04
64
EPKEX
66
Thalle Industries, Inc.
W
92 6' Chain Link Fence EPJ03
68
EPP05
Sewer Late
51 Route 100
NEAREST RECEPTOR LOCATION EPSTP EPC01
70
W
100 SILT
Briarcliff Manor, New York 10510
EPP07
72
Scale: NTS EPS01 Phone: 914.762.3415
W
ence
74
90
EPP02 EPP06
ra
ink F
As per the AERSCREEN model output files, WSW EPV01 W
l
W
ain L
EPS01
76
EPV02 EPJEX
4' Ch
SILT
direction has approximately 500' (150 m) of EPSTP
PROPERTY OWNER:
EPJ02
clearance (worst-case impact direction and EPSTP EPJ04 Bilotta Realty of Westchester,
90 EPJ01
distance). Predicted concentration at this Inc. and Briga Enterprises Inc.
W
location and direction have been utilized in the SANDVIK QJ-341 JAW CRUSHER 2099 Albany Post Rd,
100
modeling90analysis. SUPERIOR 36X60 STACKERS (1 AND 2) Montrose, NY 10548
ate
LFG
110 Phone: 914.737.7891
4' C
EPSTP See Drawing CLA-03 for Enlargement.
EPSTP
D
120
Existing Material EPL04
ROA
EPL05
ACK
Storage Bin
ETB
FT S
94
EPSTP
0
88
12
Proposed Garbage Container
EPL02
20
APPROXIMATE LEASE LINE, Phase 2
6' Fence Enclosure
nd
0
Grou
' 11
500 EPLEX EPSTP
4' CLF
n
ge O
SEE LEASE AGREEMENT Dakota
92
T
rea
Stora
king A
POS
Block
Recycling Services
0
10
EPL03
ncrete
EPL01
lt Par
ng Co
and
50
60
70
80
EPSTP
Existi
EPSTP
Aspha
E
Dakota
MATERIA
E
1 DUTCH STREET
SANDVIK QE442 SCALPING LANDS N PECKHAM INDUSTRIES
Concrete Services
MATERIAL STORAGE ON GROUND
ANY
SCREEN (LOCATION WHEN
L STORAG
E
On Ground
FACILITY LEASE
LINE
EPSTP IN USE; APPROX. ELEV. 80')
MATERIAL STORAGE ON GROUND
ce
E ON GROU
E
e
k Fen
Town of Cortlandt,
terial Storag
ALB
ain Lin
M1
C
Westchester, New York
E
4' Ch
Existing Ma
ZON INE H
ND
W
88
INE
E
W
50
G
50
50
50
W
60
70
G
80
W
80
G
E L
E
SITE LOCATION MAP
E L
W
G
Scale: NTS
E
W
94
94
Date Revision Drawn
ZON
S
94
G
W
S
08/29/24 SITE LOCATION MAP, EPSTP, WIND ARROW SRZ
E
90
S
S
S
BUCHANAN 05/27/25 Base Map Information Update WD
W
11/20/25 Survey Update SEM
D
ROUN
MATER
01/20/26 Town Engineer's Comments WD
ON G
Mason
STO RAGE
RIAL
IAL ST
MATE
Yard
ORAG
Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
Office
MONTROSE P.C. It is a violation of the New York State Education Law for any
92
E ON G
unauthorized alterations to this document as per Article 145 and 147.
ND
ROU
Al
ON G
GE PREVAILING WIND
ba
ORA
Cr
ROUN Approx. L
L ST
N 15° 15'12" W ERIA
ny
ot
W
MAT
DIRECTION
on
ND
D
60
U
Po
60
GRO
50
10.00'
Ex
W
E ON
st
RAG (FROM NORTH) Project No. 20-1176 Drawn By: SZ
pw
STO
R
o
IAL
d.
y
W
cati
TAL TER CK
0' ME BA
on o
40'X6 G MA SET Date: 09/04/2024 Checked By: PMA
f ExW
T
OSED BUILDIN 20 F
ist.
R O P
P AGE
2"
STOR
WateW
Sheet 02 of 25
FACILITY LEASE
94
r Line
LINE
W
EX
4' C ISTIN
EX
W
hain IST
ING
GP
Lin k Fe W
RE
IPE
nce BA ST
R OR
W RA AG94
CK
RECYCLING FACILITY
92
W
E
90
W
94 W
W
88 W
W
HUDSON86RIVER W 92
ST EXIS
OR TIN
AG G
E & PIP
CU E
W
0 30'
SITE PLAN
LTE
W 90 CS
W
54
84
W
W
CRUGERS W
W
15' 60'
CLA-02
W
W
W
W
PP
Page 112
TBA CK
20 FT SE
58 Church Street, Suite 200
Saratoga Springs, New York 12866
Phone: 518.584.8661
www.clasite.com
83'-2
SUPERIOR P300 CONE
CRUSHER OPERATOR/APPLICANT :
"
76'-1
Contact: Jeff Manganello
Thalle Industries, Inc.
NOTE:
SUPERIOR GUARDIAN 51 Route 100
Briarcliff Manor, New York 10510
MAIN PLANT GENERATOR
"
Phone: 914.762.3415
6203-TH32 SCREEN
STOCKPILES ARE GENERATED BY ENCLOSURE PROPERTY OWNER:
STACKERS AND CONVEYORS ON THE
MOBILE JAW CRUSHER AND SCALPING EDGE TS80 STACKER EPMEX
CLOSED CIRCUIT SCREENING Bilotta Realty of Westchester,
Inc. and Briga Enterprises Inc.
SCREEN. AGGREGATE EMISSIONS FROM
EPP05 AND CRUSHING (MAIN) PLANT 2099 Albany Post Rd,
Montrose, NY 10548
ALL STOCKPILES ARE REPRESENTED BY Phone: 914.737.7891
EPP03
EMISSION POINT EPSTP. EPK01
PV4
W
PV3 EPP04
W
EPKEX PV2 PV1
EPL04 EPJ03
W
(ON CRAWLER UNIT UNDER
EPSTP THE CONVEYOR) EPP07
EPC01
W
EPP02
EPS01 Phase 2
CONVEYOR 1
(UNDER CONVEYOR PV1) JV2
W
(UNDER
CONVEYOR PV2) Dakota
W
EPP01 Recycling Services
W
EPSTP
EPP06 and
EPLEX
W
EPL01 EPL02 CONVEYOR 2 EPL05 Dakota
EPJEX
Concrete Services
W
SANDVIK QJ-341
W
CONVEYOR 3
EPJ02
W
W
W
W
W
JAW CRUSHER Town of Cortlandt,
W
EPSTP EPV01
EPJ04 Westchester, New York
JV1
SANDVIK QE442 EPSTP
EPV02
EPL03
SCALPING SCREEN EPSTP EPJ01
Date Revision Drawn
36/60 STACKER 2
08/29/24 SITE LOCATION MAP AND DUST CONTROL SRZ
BUCHANAN 05/27/25 Base Map Information Update WD
01/20/26 Town Engineer's Comments WD
W
36/60 STACKER 1
W
W
Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
MONTROSE P.C. It is a violation of the New York State Education Law for any
unauthorized alterations to this document as per Article 145 and 147.
Al
ba
Cr
ny
ot
on
Po
PRIMARY RAW
Ex
st
p
Project No. 20-1176 Drawn By: SZ
Rd
w
y
.
FACILITY LEASE
MATERIAL Date: 09/04/2024
Sheet 03 of 25
Checked By: PMA
LINE
FEED PILE
EPSTP
RECYCLING EQUIPMENT
HUDSON RIVER SITE LOCATION MAP 0 10'
SPREAD ENLARGEMENT
CRUGERS
SCALE: NTS 5' 20'
CLA-03
Page 113
58 Church Street, Suite 200
Saratoga Springs, New York 12866
B Phone: 518.584.8661
www.clasite.com
EPL01 EPL05 EPL03 EPL04
EPL02
OPERATOR/APPLICANT :
EPLEX (FAR EPLEX
SIDE) Contact: Jeff Manganello
Thalle Industries, Inc.
51 Route 100
GROUND LEVEL GROUND LEVEL Briarcliff Manor, New York 10510
ELEVATION: +/- 80' ELEVATION: +/- 80' Phone: 914.762.3415
B
AA SANDVIK QE442 SCALPING SCREEN - SIDE VIEW BB SANDVIK QE442 SCALPING SCREEN - END VIEW PROPERTY OWNER:
SCALE: 1" = 5' SCALE: 1" = 5'
Bilotta Realty of Westchester,
Inc. and Briga Enterprises Inc.
2099 Albany Post Rd,
EPP01 Montrose, NY 10548
E Phone: 914.737.7891
EPJ03 EPS01 EPP02
EPJ01 EPP03
EPJ02 SCREEN
EPJEX EPC01
EPP04
EPP05 EPP07 Phase 2
GROUND LEVEL
GROUND LEVEL ELEVATION: Dakota
ELEVATION: +/- 83' +/- 81'
Recycling Services
E and
CC SANDVIK QJ341 JAW CRUSHER - SIDE VIEW DD SUPERIOR CLOSED CIRCUIT PLANT - SIDE VIEW Dakota
SCALE: 1" = 5' SCALE: 1" = 5'
Concrete Services
(36/60 STACKER 2)
Town of Cortlandt,
EPJ01 Westchester, New York
EPJEX 1)
R
EPP04 KE
AC
CONVEYOR 1 ST
CONVEYOR 2 6 0
EPP01
EPP02 6/
EPJ04 (3 Date Revision Drawn
EPS01 (UNDER EPP07
CONVEYOR 3 CONVEYOR 2) 08/29/24 DUST CONTROL SPRAY HEADS SRZ
01/20/26 Town Engineer's Comments WD
EPP03
GROUND LEVEL
ELEVATION: *SEE CLA-004
+/- 83'
Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
EPP05 P.C. It is a violation of the New York State Education Law for any
CLOSED CIRCUIT PLANT (TS-80 STACKER) unauthorized alterations to this document as per Article 145 and 147.
EE SANDVIK QJ341 JAW CRUSHER - END VIEW
GENERATOR ENCLOSURE
SCALE: 1" = 5'
EPMEX
NOTE:
SUPERIOR CLOSED CIRCUIT PLANT - TOP VIEW Project No. 20-1176 Drawn By: SZ
FF
SCALE: 1" = 5' 1. STOCKPILES ARE GENERATED BY STACKERS AND CONVEYORS ON
Date: 09/04/2024 Checked By: PMA
THE MOBILE JAW CRUSHER AND SCALPING SCREEN. AGGREGATE
EMISSIONS FROM ALL STOCKPILES ARE REPRESENTED BY EMISSION Sheet 04 of 25
POINT EPSTP.
2. WATER FOR SPRAY HEADS IS PROVIDED USING HOSES THAT ARE
DEPLOYED SEASONALLY WHEN THE EQUIPMENT IS OPERATING.
SEE CLA-9A RECYCLING EQUIPMENT
EMISSION POINT
LEGEND:
LOCATIONS
DUST CONTROL SPRAYHEAD
CLA-04
EMISSION POINT
Page 114
58 Church Street, Suite 200
Saratoga Springs, New York 12866
Phone: 518.584.8661
www.clasite.com
EPK01 EPV01
OPERATOR/APPLICANT :
Contact: Jeff Manganello
Thalle Industries, Inc.
51 Route 100
Briarcliff Manor, New York 10510
Phone: 914.762.3415
PROPERTY OWNER:
Bilotta Realty of Westchester,
Inc. and Briga Enterprises Inc.
2099 Albany Post Rd,
GROUND LEVEL ELEVATION: +/- 84' GROUND LEVEL ELEVATION: +/- 83' Montrose, NY 10548
Phone: 914.737.7891
EPKEX
AA TS80 STACKER - SIDE VIEW BB 36-60 STACKER 1 - SIDE VIEW
SCALE: 1" = 10' SCALE: 1" = 10'
Phase 2
Dakota
Recycling Services
and
EPV02 Dakota
Concrete Services
Town of Cortlandt,
Westchester, New York
LEGEND:
DUST CONTROL SPRAYHEAD
Date Revision Drawn
EMISSION POINT
01/20/26 Town Engineer's Comments WD
GROUND LEVEL ELEVATION: +/- 83' Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
P.C. It is a violation of the New York State Education Law for any
unauthorized alterations to this document as per Article 145 and 147.
CC 36-60 STACKER 2 - SIDE VIEW
SCALE: 1" = 10' Project No. 20-1176 Drawn By: SZ
NOTE: Date: 09/04/2024 Checked By: PMA
Sheet 05 of 25
1. STOCKPILES ARE GENERATED BY STACKERS AND CONVEYORS ON
THE MOBILE JAW CRUSHER AND SCALPING SCREEN. AGGREGATE
EMISSIONS FROM ALL STOCKPILES ARE REPRESENTED BY EMISSION
POINT EPSTP.
RECYCLING EQUIPMENT
EMISSION POINT
LOCATIONS
CLA-05
Page 115
0
12
OXIMATE LEASE LINE,
LEGEND 11
0 CONCRETE PLANT EQUIPMENT LIST
GRAVEL ACCESS ROAD
EASE AGREEMENT PROPERTY LINE
LEASE LINE
DRAINAGE DISCHARGE POINT
EXISTING STORMWATER PIPE
TRAILER 1
TRAILER 2
TRAILER 3
CONCRETE TESTING LAB
PLANT OFFICE/CONTROL ROOM
CONCRETE BATCHING ADDITIVE AND
MAINTENANCE
GARAGE
0
10
K
CHEMICAL STORAGE 58 Church Street, Suite 200
B AC
BUILDING SETBACKS PROPOESED STORMWATER PIPE Saratoga Springs, New York 12866
SET
BH BAGHOUSE Phone: 518.584.8661
80
T
www.clasite.com
S1 TOWER - TYPE I/II CEMENT STORAGE
20 F
ACCESS ROAD EXISTING JERSEY BARRIER
S2 SILICA STORAGE
PROPOSED JERSEY BARRIER
70 MAJOR CONTOURS
S3 SLAG STORAGE
S4 TYPE I/II CEMENT STORAGE
68 MINOR CONTOURS MOUNTABLE ASPHALT CURB OPERATOR/APPLICANT :
70 PROPOSED CONTOURS GUTTER DRAINAGE Contact: Jeff Manganello
TANK 1
Thalle Industries, Inc.
CHAIN LINK FENCE DIVERSION BERM 2,000 GAL. 51 Route 100
DIESEL PROPOSED
DETENTION Briarcliff Manor, New York 10510
POND Phone: 914.762.3415
PRODUCT BINS TANK 2
1,000 GAL.
GASOLINE
PROPERTY OWNER:
88
DAKOTA RECYCLING SERVICES LLC TANK 3
2,000 GAL.
Bilotta Realty of Westchester,
70
DIESEL
80
80
Inc. and Briga Enterprises Inc.
2099 Albany Post Rd,
Montrose, NY 10548
Phone: 914.737.7891
90
TANK #6 1,000 GALLON #2
FUEL OIL ABOVE GROUND Phase 2
TANK ON SLAB
Dakota
E
E LIN
FEED HOPPER AND BATCHING Recycling Services
MATERIAL LOADING HOPPERS UNIT AGGREGATE STORAGE
FEED TO BELT CONVEYOR and
SILO STORAGE Dakota
LEAS
STRUCTURES, TYP.
Concrete Services
VALVE BOX
CONCRETE BLOCK FORMS COMMUNICATIONS BAGHOUSE AIR QUALITY
AND CURING AREA ON SLAB HANHOLD TREATMENT STRUCTURE
CONCRETE JERSEY
Town of Cortlandt,
PROPOSED STORMWATER
Westchester, New York
60
BARRIER (TYP.) DISCHARGE PIPE
EX. ELECTRIC
DAKOTA CONCRETE LLC TRANSFORMER
EXISTING HYDRODYNAMIC
SEPERATOR STRUCTURE
PLANT MIX DISPENSER
TRUCK LOADING
EX. ELECTRIC "HDS-1" CONTECH MODEL
K Date Revision Drawn
ET BAC PANEL BOXES CDS-5-C
FT S FACILITY CHANNEL
20 11/20/2025 Survey Update SEM
CATCH BASIN 01/20/2026 Town Engineer's Comments SEM
PROPOSED
STORMWATER
EXISTING WASH PIT CATCH BASIN
EXCAVATED INTO GRADE
EXISTING (2)-12"∅-45" BEND
EXISTING RESIDUAL EXISTING POWER FITTINGS
CONCRETE DISPOSAL AREA 2 PROPOSED ASPHALT POLE, TYP. Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
CLA-11 MOUNTABLE CURB, NO.2 EXISTING P.C. It is a violation of the New York State Education Law for any
EXISTING CONCRETE PRETREATMENT unauthorized alterations to this document as per Article 145 and 147.
TRUCK WASH OUT AREA STORAGE BASIN NO. 1 EXISTING DRAINAGE
ROADSIDE CHANNEL
3,000 GALLON STRUCTURE SOLID COVER
STORAGE CAPACITY
90
OUTFALL NO. 001
Project No. 20-1108 Drawn By: SEM
Date: 05/27/2025 Checked By: PAL
PROPOSED ASPHALT 2
MOUNTABLE CURB, NO.1 CLA-11
Sheet 06 of 25
54
FACILITY CHANNEL CONCRETE TRUCK STAGING AREA
SOUTH OF ASPHALT BERM
EXISTING CHAIN EXISTING HEADWALL
AREA OF DISTURBANCE LINK FENCE WITH PIPE CULVERT
52
4.82± ACRES
NOTES:
EXISTING PRETREATMENT
STORAGE BASIN NO. 2
CONCRETE FACILITY
1. THIS PLAN DEPICTS THE EXISTING PLANT THAT IS CURRENTLY ON-SITE.
2. AS THE RESULT OF A RECENT FIRE, REPAIRS ARE BEING MADE TO THE CONCRETE PLANT AS NECESSARY.
1,000 GALLON STORAGE
CAPACITY 0 20' SITE PLAN
NO SUPERSTRUCTURE COMPONENTS SHOWN ON THIS DRAWINGS ARE BEING REPLACED. PERMANENT
REPAIR WORKACCESS IS LIMITED TO
REPLACING DAMAGED PARTS WITHIN THE MECHANICAL SYSTEM.
3. SEE CLA-07 FOR CONCRETE FACILITY PLANT DETAILS.
EASEMENT "B" TRUCK
TURNING AND STAGING 10' 40'
CLA-06
62
64
Page 116
58 Church Street, Suite 200
Saratoga Springs, New York 12866
Phone: 518.584.8661
SILO 2 www.clasite.com
SILO 1
SILO 3
OPERATOR/APPLICANT :
Contact: Jeff Manganello
Thalle Industries, Inc.
51 Route 100
Briarcliff Manor, New York 10510
Phone: 914.762.3415
PROPERTY OWNER:
Bilotta Realty of Westchester,
Inc. and Briga Enterprises Inc.
2099 Albany Post Rd,
Montrose, NY 10548
Phone: 914.737.7891
Phase 2
Dakota
NOTE:
1. SILO 4 (BEHIND SILO 3) IS NOT SHOWN.
Recycling Services
and
NOTE:
1. SILOS 3 AND 4 ARE IN FOREGROUND AND ARE NOT SHOWN.
FRONT VIEW
Dakota
Concrete Services
Town of Cortlandt,
BAGHOUSE
Westchester, New York
FEED HOPPER AND BATCHING UNIT
BH
SILO 2 AGGREGATE STORAGE BIN
SILO 1
Date Revision Drawn
9/8/25 CLA SITE NOTE REVISIONS SEM
Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
P.C. It is a violation of the New York State Education Law for any
unauthorized alterations to this document as per Article 145 and 147.
SILO 3 SILO 4
Project No. 20-1104 Drawn By: SEM
Date: 05/27/2025 Checked By: PAL
Sheet 07 of 25
PLAN VIEW
CLA SITE NOTES:
1. THIS PLAN DEPICTS THE EXISTING PLANT THAT IS CURRENTLY ON-SITE.
2. CONCRETE PLANT DRAWING TITLED LP12 FOUNDATION LAYOUT PROVIDED BY CON-E-CO, CONCRETE EQUIPMENT
COMPANY, DRAWING NUMBER C8001-F1, DATED 9/24/04.
3. EQUIPMENT IN RED ADDED BY CLA SITE FOR CLARIFICATION. SAFETY RAILINGS AND HOPPER COVER ADDED TO REFLECT
EXISTING CONDITIONS. SILO NUMBERS ADDED TO CORRESPOND TO SITE PLAN. CONCRETE EQUIPMENT
4. SEE CLA-06 FOR CONCRETE FACILITY SITE PLAN.
5. AS THE RESULT OF A RECENT FIRE, REPAIRS ARE BEING MADE TO THE CONCRETE PLANT AS NECESSARY.
DETAILS
NO SUPERSTRUCTURE COMPONENTS SHOWN ON THIS DRAWINGS ARE BEING REPLACED. REPAIR WORK IS LIMITED TO
REPLACING DAMAGED PARTS WITHIN THE MECHANICAL SYSTEM.
CLA-07
Page 117
TYPICAL FRAC TANK
EXISTING WATER
W
TANKS 58 Church Street, Suite 200
Saratoga Springs,
New York 12866
Phone: 518.584.8661
W
SILT www.clasite.com
OPERATOR/APPLICANT :
W
Contact: Jeff Manganello
W Thalle Industries, Inc.
51 Route 100
W
SILT Briarcliff Manor, New York 10510
Phone: 914.762.3415
PROPERTY OWNER:
Bilotta Realty of Westchester, Inc.
PUMP SPECIFICATIONS 2" WATER SUPPLY LINES, TYP. and Briga Enterprises Inc.
2099 Albany Post Rd,
W
PROPOSED Montrose, NY 10548
Phone: 914.737.7891
FRAC TANK
PROPOSED Phase 2 Dakota
PUMP CHAMBER
AND PUMP Recycling Services
PROPOSED and Dakota Concrete
PUMP - AMT #4250-95 STONE CHECK DAM
D50=6-8 INCHES Services
Town of Cortlandt,
EXISTING Westchester, New York
CONCRETE
WASHOUT Date Revision Drawn
05/27/25 Base map info update WD
Copyright 2020 - CLA Site Landscape
Architecture, Engineering, & Planning P.C. It
Is A Violation Under the New York State
Education Law For Any Unauthorized
Alterations to This Document As Per Article
145 And 147.
Drawn By: SRZ/WD
APPROXIMATE
UGT
Project No. 20-24-1104
TRUCK
W
CIRCULATION Date: 12/20/2024
E
UG
CONCRETE TRUCK
U
UG
WT
E
GE
UG
E
UG
0 30' WASHOUT
E
G
U
LAYOUT PLAN
U
UG
WT
GE
15' 60'
CLA-08
Page 118
60
LEGEND
TIM COOK INC
TAX PARCEL
PROPERTY LINE 70 MAJOR CONTOURS DAKOTA RECYCLING SERVICES #54.8-2-28
PROCESSED MATERIAL LLC - OPERATION YARD
LEASE LINE 68 MINOR CONTOURS
90
70
50
DAKOTA RECYCLING
80
SERVICES LLC - GREEN SPACE 50
60
INSPECTION BOUNDARY 70 PROPOSED CONTOURS INCOMING ROCK/CONCRETE 52
MIXED LOADS 58 Church Street, Suite 200
54
INSPECTION PERIMETER SETBACK Saratoga Springs, New York 12866
70
BUILDING SETBACKS EXISTING STORMWATER PIPE TO BE KEPT CLEAR FOR INSPECTIONS 56
DAKOTA CONCRETE LLC 6058 Phone: 518.584.8661
40
DRAINAGE DISCHARGE SILT 6 62 www.clasite.com
66 4 5658 62
60
FENCE LINE POINT STORMWATER
50
SILT FENCE SILT
96
MONITORING 68
4 SILT 70 60
10 56 62
60
SILT
OUTFALL 002
CK 4' CHAIN
SETBA RECYCLING
20 FT
102 100 2114 APR LLC LINK FENCE
64
a
ld Are
OPERATOR/APPLICANT :
ximate
100 NOTE: ALL WATER LINES AND ASSOCIATED TAX PARCEL
ing Fie
LEGEND EQUIPMENT ARE EXISTING FEATURES. #54.8-2-29
Appro
66
DUTCH STREET98LLC PHOTO 1 PHOTO 2 PHOTO 3 PHOTO 4
68
Contact: Jeff Manganello
Leach
94 EXISTING
96
TAX PARCEL
SP SPRINKLER HEAD TRI-GALLERY
70
#54.12-3-8
94 TANK 10 SUBSUFACE SEWER
Thalle Industries, Inc.
7
MH
DUTCH MANHOLE
STREET LLC D & N HOUSING LLC 4' CHAIN LINK FENCE 1000 GAL DIESEL DISPOSAL AREA 51 Route 100
92
TAX PARCEL
HB#54.12-3-8
HOSE BIB
TAX PARCEL PROCESSING EQUIPMENT DUST EXISTING 1,000 Briarcliff Manor, New York 10510
#55.9-1-2 CONTROL WATER MANIFOLD GAL SEPTIC TANK
OBSERVED WATER LINE (OBSERVED) Phone: 914.762.3415
62
100
64
66
W
INFERRED WATER LINE 92 6' Chain Link Fence
68
Sewer Late
NON-POTABLE PROPERTY OWNER:
60
70
100 WATER TANKS
SILT
W
PRIMARY WATER SUPPLY VALVE
72
50
ence
74
90 Bilotta Realty of Westchester,
ral
ink F
W
W FLEXIBLE HOSE
ain L
Inc. and Briga Enterprises Inc.
76
SILT (OBSERVED)
4' Ch
PROCESSED SUBBASE MATERIAL
2099 Albany Post Rd,
LEGEND
H 90 Montrose, NY 10548
H HYDRANT TANK 7
2,000 GAL USED OIL Phone: 914.737.7891
GATE VALVE 100
DAKOTA SUPPLY 90
ate
TANK 8
PRZ VALVE
LFG
INCOMING ROCK AND 110 300 GAL
CORP.
4' C
CONCRETE
M METERMIXED LOADS HYDRAULIC OIL
MUNICIPAL WATER LINE
ALBANY POST ROAD
Refer to Phase 1 REF: MID RECORD CARD TANK 9
Phase 2
D
88
ALL PIPES 6" EXCEPT AS INDICATED
PROCESSED AGGREGATE120
ACCT#301370 AND 250 GAL MOTOR OIL
ALL VALVES 6" GATE
Site Plan Existing Material
ROA
ACK
Storage Bin SUBBASE
117 ALBANY POST MATERIALS
ROAD WATER SUPPLY
Dakota
ETB
CONNECTION WITH VALVE
FT S
94 IN MECHANICAL ROOM
88
0
Recycling Services
12
US VETERANS HOSPITAL BYPASS Proposed Garbage Container (PHOTO 4)
DAKOTA RECYCLING
20
6' Fence Enclosure
APPROXIMAT E LEASE LINE,
round
TAX PARCEL 0
11
On G
#54.16-3-1
4' CLF
SERVICES
SEE LLC
LEASE AGREEMENT and
rage
92
T
a
g Are
AREA DEDICATED FOR
ck Sto
HB
ACK
86
POS
4.58 ACRES
4" PIPE THROUGH
e Blo
0
METER PIT
Dakota
10
ETB
Parkin
BACKFLOW VALVE PIT
USE BY DAKOTA
oncret
40
FT S
ing C
50
60
70
80
M BACKFLOW
Concrete Services
lt
Exist
CONCRETE LLC
20
Aspha
E
VALVE PIT EMPLOYEE
4" PIPE
MATERIAL
TANK 1 PARKING AREA
E
TO INDUSTRIES
TANK 5LANDS N PECKHAM
MATERIAL STORAGE ON GROUND
4" PIPE THROUGH 2,000 GAL DIESEL 4" PIPE TO
4" RPZ PLANT
ANY
METER PIT MAINTENANCE GARAGE 275 GAL #2 FUEL OIL
E
ST
e On Ground
(SEE PHOTO 1) EMPLOYEE (INFERRED LOCATION)
ORAGE ON
TANK 2
(SEE PHOTO 2) PARKING AREA
TANK 4 Town of Cortlandt,
MATERIAL STORAGE ON GROUND
1,000 GAL GASOLINE
Fence
E
86
275 GAL #2 FUEL OIL
terial Storag
Westchester, New York
in Link
ALB
WATER SERVICE CONNECTION DETAIL CONCRETE TRUCK
GROUND
M1
NEW DETENTION POND
C
4' Cha
E
PARKING AREA
Existing Ma
N.T.S.
ZON LINE H
w CURB/BERM
88
G W
INE
E
50
50
50
G W
50
Water Valve GATE
60
70
SPRAY NOZZLE
80
G W
TANK 3
80
Gas Valve
Date Revision Drawn
G
STORAGE LOCATION
E L
E
2,000 GAL DIESEL
PECKHAM MATERIALS CORP
W
SP CONCRETE PLANT WATER SUPPLY
TAX PARCEL 11/20/2025 Survey Update SEM
G
CONNECTION WITH VALVE
E
94
94
E
5/8" WASH HOSE WITH #55.9-1-5
(PHOTO 3)
W
01/20/2026 Town Engineer's Comments SEM
ZON
S
94 SPRAY NOZZLE
G
S
90
E
S
W
84 S
TANK 6
NEW WHEEL WASH 2" HDPE 1,000 GAL #2 FUEL OIL
ND 1" PEX
MATER
ROU
ON G
Mason
AG E PAD (OBSERVED) (OBSERVED)
STOR
RIAL
IA
MATE NEW ASPHALT MOUNTABLE CURB
Yard
L STOR
92 1" PEX 4" PIPE TO CONCRETE PLANT
SEE CLA-9B FOR Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
1" PEX
Office
P.C. It is a violation of the New York State Education Law for any
(OBSERVED) ENLARGED DETAIL
AGE O
(OBSERVED) AND MAINTENANCE GARAGE
92
unauthorized alterations to this document as per Article 145 and 147.
all
WATER METER IN MANHOLE 2" HDPE (INFERRED ND LOCATION, END
g W
ROU GATE (INFERRED LOCATION)
N GRO
OE
ON G
(PHOTO 1) OF PIPEAGEAT SPRINKLER OBSERVED)
tainin
TOR SP
IAL S
e Re
N 15° 15'12" W ER
UND
MAT
90
W
D
60
OUN
60
Ston
50
R
10.00'
4" BACKFLOW PREVENTION DEVICE IN N GPIT
88
WASH EXCAVATED
App W
GE O CONCRETE PLANT AND
rox.
CONCRETE VAULT (PHOTO 2) ORA CONCRETE BLOCKGARAGE WATER SUPPLY
86
OE
L ST INTO GRADE
Loc
TAL ERIA ACK
DAKOTA CONCRETE LLC
atio
(RFE.: NYSDOH CERTIFICATE 0' MEAPPROVAL
OF MAT ETB FORMS Project No. 20-1104 Drawn By: WD
n of W
Sto SETBACKUNDER PAVEMENT
20 FT VALVE
n eR 40'X6 DING RESIDUAL CONCRETE FT S
OSED
Exis
eta FOR BACKFLOW PREVENTION IL 20
PROP RAGE BU DEVICE, LOG HYDRANT
t.
inin (LOCATION PER INSTALLER)
2" W
g
Wa TO
NO. CC-1055 DATED S3/6/92) 94
DISPOSAL AREA
1.38 ACRES Date: 10/02/2025 Checked By: SEM
ater W
ll
Line
OE
CONCRETE TRUCK
FLEXIBLE HOSE Sheet 09 of 25
EX WASH OUT AREA
W
Conc. Vault
W
PP 4' C
h ain L
EX
IST
IST
ING (OBSERVED) FLOW TESTS DEEMED HYDRANT
82 W ink F
e nce
W
ING
RE
BA
PIP
E ST INOPERABLE. HYDRANT AND WATER
OR
R RA 94
AG
LINES WILL BE IN COMPLIANCE WITH
92
W CK E
90
W
Rebar Fnd. On Line 94 OUTFALL 001
W
W 10 STATE STANDARDS.
W 88 ST EXIS
OR TIN
EXISTING CONCRETE MANHOLE
AG G
W 86 92 E & PIP
CU E
W
WITH SOLID COVER
LTE
90 CS
SEE WATER SERVICE W
54
W
84 SP 4X4 TEE AND PIPE
W 4" CONCRETE PLANT, MAINTENANCE
CONNECTION
W
(LOCATED WITH
W
W PP GARAGE AND PECKHAM FACILITY
W
MAGNETOMETER BY INSTALLER)
DETAIL INSET WATER SUPPLY LINE
MH METRO-NORTH COMMUTER RAIL
PLUMBING PLAN
52
50' Wide Easement (INFERRED LOCATION)
NOTES: (DIAMETER PER MID INSPECTION) TAX PARCEL
1. THERE SHALE BE NO STOCKPILING OF MATERIAL ASSOCIATED WITH DAKOTA 2" HDPE #55.9-1-6 0 40'
RECYCLING SERVICES ON THE DAKOTA SUPPLY CORP LEASE AREA. TO SPRINKLER 50
2. ALL STOCKPILES TO MEET THE HEIGHT REQUIREMENTS.
3. HOURS OF OPERATIONS; DAKOTA RECYCLING SERVICE -
SHARED ACCESS ROAD 64
62 48
20' 80'
CLA-9A
46
42
DAKOTA CONCRETE LLC - 66
44
Page 119
0
12
OXIMATE LEASE LINE,
LEGEND 11
0
EASE AGREEMENT PROPERTY LINE DRAINAGE DISCHARGE POINT
K
B AC
LEASE LINE
0
SILT FENCE
10
58 Church Street, Suite 200
S ET
BUILDING SETBACKS Saratoga Springs, New York 12866
EXISTING STORMWATER PIPE Phone: 518.584.8661
FT
80
www.clasite.com
HAUL ROAD
20
PROPOESED STORMWATER PIPE
70 MAJOR CONTOURS
RAISED ASPHALT BERM
68 CHAIN LINK FENCE
4" WATER PIPE SUPPLY TO OPERATOR/APPLICANT :
JERSEY BARRIER MAINTENANCE GARAGE
70 PROPOSED CONTOURS
(INFERRED LOCATION) Contact: Jeff Manganello
Thalle Industries, Inc.
MINOR CONTOURS 51 Route 100
Briarcliff Manor, New York 10510
Phone: 914.762.3415
LEGEND
DAKOTA RECYCLING SERVICES LLC
OBSERVED WATER LINE PROPERTY OWNER:
88
INFERRED WATER LINE Bilotta Realty of Westchester,
70
80
80
PRIMARY WATER SUPPLY VALVE
Inc. and Briga Enterprises Inc.
2099 Albany Post Rd,
HYDRANT Montrose, NY 10548
Phone: 914.737.7891
4X4 TEE CONCRETE PLANT
NOTE: ALL WATER LINES AND ASSOCIATED (INFERRED) WATER SUPPLY VALVE
EQUIPMENT ARE EXISTING FEATURES. (OBSERVED)
90
Phase 2
4" PIPE TO CONCRETE Dakota
PLANT AND
MAINTENANCE GARAGE
(INFERRED LOCATION)
Recycling Services
and
VALVE IN OPEN PIT FOR TWO
PIPES TO HOSE LINES
Dakota
(PIPE IN PIT WAS NOT OBSERVED
DUE TO STANDING WATER)
Concrete Services
Town of Cortlandt,
ABOVE GROUND PIPE
Westchester, New York
60
TO HOSE BIBS
DAKOTA CONCRETE LLC 4X4 TEE
(INFERRED)
Date Revision Drawn
20 FT SETBACK CONCRETE PLANT AND
11/20/2025 Survey Update SEM
GARAGE WATER SUPPLY
VALVE UNDER PAVEMENT FLOW TESTS DEEMED HYDRANT 01/20/2026 Town Engineer's Comments SEM
(LOCATION PER INSTALLER) INOPERABLE. HYDRANT AND WATER
LINES WILL BE IN COMPLIANCE WITH
10 STATE STANDARDS.
HYDRANT WITH
AIR RELEASE VALVE Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
(OBSERVED) P.C. It is a violation of the New York State Education Law for any
4X4 TEE AND PIPE unauthorized alterations to this document as per Article 145 and 147.
(LOCATED WITH
4" PIPE (INFERRED LOCATION, MAGNETOMETER BY
SIZE TO BE VERIFIED BY INSTALLER)
90
OBSERVATION IN METER PIT)
TO METER PIT CORNER
OF ALBANY POST ROAD Project No. 20-1104 Drawn By: WD
4X4 TEE
(INFERRED) PECKHAM WATER SUPPLY
(LOCATION INFERRED) Date: 10/02/2025 Checked By: SEM
Sheet 10 of 25
54
52
0 20'
PLUMBING PLAN DETAIL
10' 40'
CLA-9B
62
64
Page 120
60
LEGEND
DAKOTA RECYCLING TIM COOK INC
TAX PARCEL
PROPERTY LINE 70 MAJOR CONTOURS DAKOTA RECYCLING SERVICES
PROCESSED MATERIAL LLC - OPERATION YARD SERVICES LLC #54.8-2-28
LEASE LINE 68 MINOR CONTOURS 4.58 ACRES
90
70
50
DAKOTA RECYCLING
80
SERVICES LLC - GREEN SPACE 50
60
INSPECTION BOUNDARY 70 PROPOSED CONTOURS INCOMING ROCK/CONCRETE 52
MIXED LOADS 58 Church Street, Suite 200
54
INSPECTION PERIMETER SETBACK Saratoga Springs, New York 12866
70
BUILDING SETBACKS EXISTING STORMWATER PIPE TO BE KEPT CLEAR FOR INSPECTIONS 56
DAKOTA CONCRETE LLC 6058 Phone: 518.584.8661
40
DRAINAGE DISCHARGE SILT 6 62 www.clasite.com
66 4 5658 62
60
HAUL ROAD POINT STORMWATER
50
SILT FENCE SILT
96
MONITORING 68
4 SILT 70 60
FENCE LINE 10 56 62
60
SILT
OUTFALL 002
CK 4' CHAIN
SETBA RECYCLING
20 FT
102 100 2114 APR LLC LINK FENCE
64
a
LUMINAIRE SCHEDULE
ld Are
OPERATOR/APPLICANT :
ximate
LEGEND 100 TAX PARCEL
ing Fie
#54.8-2-29
Appro
66
SYMBOL ARRANGEMENT DESCRIPTION
DUTCH STREET 98LLC
68
Contact: Jeff Manganello
Leach
94 EXISTING
TAXPOLES
EXISTING UTILITY 96
PARCEL SINGLE -250W RAB HPS LIGHT, WP3SC250QT 16X10 - SIDE OF GARAGE TANK 10
TRI-GALLERY
70
#54.12-3-8
94 SINGLE -3, 150W MEDIUM BASE HPS WP2SH150QT - FRONT OF GARAGE 1000 GAL DIESEL
SUBSUFACE SEWER
Thalle Industries, Inc.
OVERHEAD POWER LINE
7
DUTCH STREET LLC D & N HOUSING
DOUBLE -FLOOD 4' CHAIN
LLC CONE 2 HEAD LIGHT LINK FENCE
- GARAGE ENTRANCE
MOBILE DISPOSAL AREA 51 Route 100
92
TAX PARCEL LIGHT FIXTURES SEE LIGHT GENERATOR
#54.12-3-8LUMINAIRE SCHEDULE
TAX PARCEL
-238W RAB FFLED 230SFW/D10 5K - FUEL TANKS
SINGLE #55.9-1-2 SUPERIOR PLANT EXISTING 1,000 Briarcliff Manor, New York 10510
GAL SEPTIC TANK
o
CONTROL CABINET Phone: 914.762.3415
62
SINGLE -XELEUM LIGHTING MW:WSSA-150-020VN-AF200-D1
0 45 - CONCRETE WASHOUT
ELECTRIC LINE - UNDERGROUND 10
64
66
SINGLE
W
-175 W RAB FLOODLIGHT, METAL HALIDE, MEDIUM BASE - CONCRETE SILO
ELECTRIC LINE - ABOVE GROUND 92 6' Chain Link Fence
68
Sewer Late
SINGLE -2, 150W RAB FLOOD LIGHTS, METAL HALIDE MEDIUM BASE, 35o 45o - TOP SILO 1 PROPERTY OWNER:
60
70
100 SILT
W
-44W RAB FFLED 39 5K 45o - CONTROL TOWER CORNER
72
1-1/4" SCH 80 - UNDERGROUND
50
ence
74
90 Bilotta Realty of Westchester,
ral
ink F
W
1-1/4" SCH 80 - ABOVE GROUND W
ain L
Inc. and Briga Enterprises Inc.
76
SILT
4' Ch
PROCESSED SUBBASE MATERIAL
SERVICE BOX
NOTE: ALL ELECTRICAL LINES AND ASSOCIATED 2099 Albany Post Rd,
EQUIPMENT ARE EXISTING FEATURES. 150w HPS RAB
CONTROL CABINET 90 Montrose, NY 10548
TANK 7
2,000 GAL USED OIL Phone: 914.737.7891
100
DAKOTA SUPPLY
RECYCLING PLANT 90
ate
TANK 8
LFG
550 KVA GENERATOR 480V 3∅ FEEDS INCOMING ROCK AND 110 300 GAL
CORP.
4' C
MAIN CONTROL CABINET FOR SUPERIOR PLANT CONCRETE MIXED LOADS HYDRAULIC OIL
Refer to
MAINTENANCE Phase
GARAGE SERVICE 1
TANK 9
Phase 2
D
88
4" RIGID FEEDS 400AMP 480V 3∅ PANEL PROCESSED AGGREGATE120
AND 250 GAL MOTOR OIL
Site Plan Existing Material
ROA
ACK
125AMP 3 POLE BREAKER FEEDS 75 KVA XFORMER VIA 2" RIGID Storage Bin SUBBASE MATERIALS
Dakota
ETB
480V 3∅ XFORMER TO 120V/280V 3∅ 225AMP PANEL VIA 2" RIGID
FT S
88 94
0
USPANEL BOXESHOSPITAL
& METERS FLOOD CONE
Recycling Services
12
VETERANS Proposed Garbage Container
20
APPROXIMATE LEASE LINE,
6' Fence Enclosure
round
TAX PARCEL
PRIMARY POLE 0 2 HEAD LIGHT
11
On G
#54.16-3-1
FEEDING UNDERGROUND IN 4" RIGID TO:
4' CLF
SEE LEASE AGREEMENT and
rage
92
T
a
g Are
AREA DEDICATED FOR
ck Sto
ACK
86
TRANSFORMER (SIZE UNKNOWN)
POS
BUILDING
e Blo
0
480V 3∅ OUTPUT VIA 4" CONDUIT TO:
Dakota
10
ETB
Parkin
SERVICE
USE BY DAKOTA
oncret
40
FT S
ing C
50
60
70
2-400AMP 480V 3∅ DISCONNECTS
80
Concrete Services
lt
Exist
CONCRETE LLC
20
Aspha
EACH FEED METERS E
EMPLOYEE
MATERIAL
TANK 1 PARKING AREA
E
1-METER FEEDS 400AMP 3∅ PANEL TO RIGHT FOR CEMENT PLANT
250w HPS RAB
TANK 5LANDS N PECKHAM
INDUSTRIES
MATERIAL STORAGE ON GROUND
2,000 GAL DIESEL
80
ANY
1-METER FEEDS UP TO MAINTENANCE GARAGE 275 GAL #2 FUEL OIL
E
ST
H
e On Ground
C
ORAGE ON
EMPLOYEE TANK 2
238W LED 4 "S TANK 4 Town of Cortlandt,
480V 3∅ CEMENT PANEL 400AMP PANEL SCHEDULE PARKING AREA
MATERIAL STORAGE ON GROUND
1,000 GAL GASOLINE
Fence
E
86
275 GAL #2 FUEL OIL
terial Storag
Westchester, New York
in Link
ALB
4" SCH
CONCRETE TRUCK
GROUND
M1
400AMP MAIN 3 POLE PROPOSED DETENTION
C
4' Cha
E
100 AMP 3 POLE FEEDS CONVEYOR PANEL PARKING AREA
Existing Ma
POND
ZON LINE H
w
100 AMP 2 POLE SPARE
88
G W
INE
80
E
100 AMP 3 POLE FEEDS XFORMER G FOR 120V SERVICE
50
JERSEY BARRIER
50
50
W
50
Water Valve
60
70
80
G
20 AMP 1 POLE SPARE W
TANK 3
80
Gas Valve NEW WHEEL Date Revision Drawn
G
225 AMP 3 POLE FEEDS CEMENT CABINET
E L
E
WASH PAD 2,000 GAL DIESEL CONVEYOR PECKHAM MATERIALS CORP
W
CONTROL BOX TAX PARCEL 11/20/2025 Survey Update SEM
G
J BOX
E
94
94
E
4" SCH 80 #55.9-1-5
W
ZON
J-BOX IN PLANT FED W/4" RIGID 94 S 01/20/2026 Town Engineer's Comments SEM
G
S
90
FEED OUT 4" PVC SCH 80 TO CEMENT CONTROL CABINET
E
S
SEE CLA-9D FOR
W
84 S
TANK 6
CORNER OF DISCONNECTS
80
ND NEW ASPHALT 120/208V 1,000 GAL #2 FUEL OIL
J-BOX ENLARGED DETAIL
MATER
GROU
Mason
E ON
CH
J-BOX FEEDS AG MOUNTABLE BERM XFORMER SERVICE
STOR
RIAL
IA
4" S
2" EMT TO 3∅ 100AMP 480V DISCONNECT H4 THHN COMPRESS MATE
Yard
L STOR
150W Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
92 EX. ELECTRIC
HALIDE RAB
Office
1" EMT TO 3∅ 100AMP 480V DISCONNECT H4 THHN BACK UP TRANSFORMER P.C. It is a violation of the New York State Education Law for any
AGE O
92
COMPRESSOR PLANT CONTROL unauthorized alterations to this document as per Article 145 and 147.
all
D
OUN
g W
GATE
N GRO
OE N GR
GE O UNDERGROUND ELECTRIC SERVICE FROM CABINET
tainin
1" SEAL LIGHT TO 3∅ 60AMP 480V DISCONNECT #8 THHN FEEDS PUMP 1, ORA
L ST
ERIA TRANSFORMER TO MAINTENANCE
PUMP 2, PUMP 3 N 15° 15'12" W
e Re
UND
MAT 175W
90
W
ND
80
60
60
Ston
ROU 40 FT FRONT
GARAGE AND CONCRETE SETBACK
PLANT
50
10.00' N GPIT EXCAVATED HALIDE RAB
88
WASH
App W
GE O
SCH
rox.
ORA
86
OE
120V/280V 3∅ SERVICE L ST INTO GRADE 44W LED RAB
Loc
ETAL
EX. ELECTRIC
ERIA ACK
atio
60' M MAT B 150W Project No. 20-1104 Drawn By: WD
4"
n of W
Sto
2" RIGID FEEDSne R480V 3∅ TO 120/208V 3∅ 75 KVA TRANSFORMER40'X DING RESIDUAL CONCRETE T SET PANEL BOXES
OSED
Exis
20 F
e tain IL
PROP RAGE BU XULEUM
DAKOTA CONCRETE LLC
t.
& METERS
2" W
ing
Wa STO DISPOSAL AREA
94 Date: 10/02/2025 Checked By: SEM
ater W
ll
2" SEAL TIGHT FEEDS 200 AMP 120/208V 3∅ MAIN
Line
(4) 20 AMP 1 POLE TURN TABLE
OE
CONCRETE TRUCK
WASH OUT AREA 4" SCH 80
1.38 ACRES Sheet 11 of 25
EX
W
W
4' C IST
20 AMP 1 POLE GFI BREAKERPP UPPER
Conc. Vault hain PLANT OUTLETS
EX
IST ING
82 20 AMP 1 POLE LOWER PLANT W Lin
GFIS k Fence
W
ING
RE
BA
PIP
E ST 150W
OR
20 AMP 1 POLE
R RA 94
AG
XULEUM
Rebar Fnd.SPARE
92
W CK E
90
W
On Line 94 OUTFALL 001
100 AMP 2POLE ADDITIVE TRAILER W W
100 AMP 2 POLE STATE TRAILER W 88 ST EXIS
OR TIN
EXISTING UTILITY EXISTING CONCRETE MANHOLE
AG G
10 AMP 2 POLE BATCH TRAILER W 86 92 E & PIP
CU E
W
POLE, (TYP.) WITH SOLID COVER
LTE
90 CS W
54
W
84 W W
W
W
W
PP
SHARED ACCESS ROAD
METRO-NORTH COMMUTER RAIL
ELECTRIC PLAN
52
50'
NOTES:
Wide Easement TAX PARCEL
1. THERE SHALE BE NO STOCKPILING OF MATERIAL ASSOCIATED WITH DAKOTA #55.9-1-6 0 40'
RECYCLING SERVICES ON THE DAKOTA SUPPLY CORP LEASE AREA. 50
2. ALL STOCKPILES TO MEET THE HEIGHT REQUIREMENTS.
3. HOURS OF OPERATIONS; DAKOTA RECYCLING SERVICE - 64
62 48
20' 80'
CLA-9C
46
42
DAKOTA CONCRETE LLC - 66
44
Page 121
0
12
OXIMATE LEASE LINE,
LUMINAIRE SCHEDULE
LEGEND 11
0
SYMBOL ARRANGEMENT DESCRIPTION
EASE AGREEMENT
SINGLE -250W RAB HPS LIGHT, WP3SC250QT 16X10 - SIDE OF GARAGE
PROPERTY LINE DRAINAGE DISCHARGE POINT
SINGLE -3, 150W MEDIUM BASE HPS WP2SH150QT - FRONT OF GARAGE
K
FLOOD CONE 2
DOUBLE -FLOOD CONE 2 HEAD LIGHT - GARAGE ENTRANCE
B AC
LEASE LINE HEAD LIGHT
0
SILT FENCE
10
SINGLE -238W RAB FFLED 230SFW/D10 5K - FUEL TANKS
58 Church Street, Suite 200
S ET
BUILDING SETBACKS SINGLE -XELEUM LIGHTING MW:WSSA-150-020VN-AF200-D1 45o - CONCRETE WASHOUT Saratoga Springs, New York 12866
BUILDING
EXISTING STORMWATER PIPE Phone: 518.584.8661
FT
SINGLE -175 W RAB FLOODLIGHT, METAL HALIDE, MEDIUM BASE - CONCRETE SILO SERVICE
80
www.clasite.com
HAUL ROAD SINGLE -2, 150W RAB FLOOD LIGHTS, METAL HALIDE MEDIUM BASE, 35o 45o - TOP SILO 1
20
-44W RAB FFLED 39 5K 45o - CONTROL TOWER CORNER
70 MAJOR CONTOURS
LEGEND 250W HPS RAB
68 MINOR CONTOURS OPERATOR/APPLICANT :
EXISTING UTILITY POLES 80
H
70 PROPOSED CONTOURS SC Contact: Jeff Manganello
4"
4" SC
OVERHEAD POWER LINE
Thalle Industries, Inc.
H
CHAIN LINK FENCE LIGHT FIXTURES SEE LIGHT 51 Route 100
80
LUMINAIRE SCHEDULE
Briarcliff Manor, New York 10510
RECYCLING PLANT ELECTRIC LINE - UNDERGROUND Phone: 914.762.3415
238W LED
550 KVA GENERATOR 480V 3∅ FEEDS
ELECTRIC LINE - ABOVE GROUND
MAIN CONTROL CABINET FOR SUPERIOR PLANT
1-1/4" SCH 80 - UNDERGROUND PROPERTY OWNER:
88
MAINTENANCE GARAGE SERVICE
4" RIGID FEEDS 400AMP 480V 3∅ PANEL DAKOTA RECYCLING SERVICES LLC
1-1/4" SCH 80 - ABOVE GROUND
125AMP 3 POLE BREAKER FEEDS 75 KVA XFORMER VIA 2" RIGID Bilotta Realty of Westchester,
70
80
480V 3∅ XFORMER TO 120V/280V 3∅ 225AMP PANEL VIA 2" RIGID
80
SERVICE BOX Inc. and Briga Enterprises Inc.
PANEL BOXES & METERS CONTROL CABINET 2099 Albany Post Rd,
PRIMARY POLE
FEEDING UNDERGROUND IN 4" RIGID TO: Montrose, NY 10548
NOTE: ALL ELECTRICAL LINES AND ASSOCIATED
TRANSFORMER (SIZE UNKNOWN) EQUIPMENT ARE EXISTING FEATURES.
CONVEYOR Phone: 914.737.7891
CONTROL BOX
480V 3∅ OUTPUT VIA 4" CONDUIT TO:
4" SCH 80
2-400AMP 480V 3∅ DISCONNECTS
EACH FEED METERS
90
1-METER FEEDS 400AMP 3∅ PANEL TO RIGHT FOR CEMENT PLANT
1-METER FEEDS UP TO MAINTENANCE GARAGE
J-BOX
Phase 2
480V 3∅ CEMENT PANEL 400AMP PANEL SCHEDULE Dakota
150W HALIDE RAB
400AMP MAIN 3 POLE
100 AMP 3 POLE FEEDS CONVEYOR PANEL
Recycling Services
H 80
100 AMP 2 POLE SPARE
100 AMP 3 POLE FEEDS XFORMER FOR 120V SERVICE and
C
4" S
20 AMP 1 POLE SPARE
225 AMP 3 POLE FEEDS CEMENT CABINET
120/208V
Dakota
PLANT CONTROL
J BOX
J-BOX IN PLANT FED W/4" RIGID
XFORMER SERVICE
CABINET Concrete Services
FEED OUT 4" PVC SCH 80 TO CEMENT CONTROL CABINET
CORNER OF DISCONNECTS 175W HALIDE RAB
EX. ELECTRIC
J-BOX FEEDS TRANSFORMER Town of Cortlandt,
2" EMT TO 3∅ 100AMP 480V DISCONNECT H4 THHN COMPRESS
Westchester, New York
60
44W LED RAB
UNDERGROUND ELECTRIC SERVICE FROM
1" EMT TO 3∅ 100AMP 480V DISCONNECT H4 THHN BACK UP
DAKOTA CONCRETE LLC TRANSFORMER TO MAINTENANCE
0
COMPRESSOR
H8
GARAGE AND CONCRETE PLANT
SC
1" SEAL LIGHT TO 3∅ 60AMP 480V DISCONNECT #8 THHN FEEDS PUMP 1,
K
BAC EX. ELECTRIC
4"
PUMP 2, PUMP 3 Date Revision Drawn
ET
FT S
PANEL BOXES
20 & METERS 11/20/2025 Survey Update SEM
120V/280V 3∅ SERVICE
150W XULEUM 01/20/2026 Town Engineer's Comments SEM
2" RIGID FEEDS 480V 3∅ TO 120/208V 3∅ 75 KVA TRANSFORMER
150W XULEUM
2" SEAL TIGHT FEEDS 200 AMP 120/208V 3∅ MAIN
(4) 20 AMP 1 POLE TURN TABLE 4" SCH 80 12" Ø HDPE PIP
20 AMP 1 POLE GFI BREAKER UPPER PLANT OUTLETS E
20 AMP 1 POLE LOWER PLANT GFIS EXISTING UTILITY
20 AMP 1 POLE SPARE Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
POLE, (TYP.) P.C. It is a violation of the New York State Education Law for any
100 AMP 2POLE ADDITIVE TRAILER
100 AMP 2 POLE STATE TRAILER unauthorized alterations to this document as per Article 145 and 147.
10 AMP 2 POLE BATCH TRAILER
8" Ø HDPE PIPE
EXISTING UTILITY
POLE, (TYP.)
90
Project No. 20-1104 Drawn By: WD
Date: 10/02/2025 Checked By: SEM
Sheet 12 of 25
54
EXISTING UTILITY
POLE, (TYP.)
52
0 20'
ELECTRIC PLAN DETAIL
10' 40'
CLA-9D
62
64
Page 122
60
LEGEND AERIAL TRUCK TURNING STUDY TYPICAL FIRE ACCESS
ROAD SIGNAGE
PROPERTY LINE FENCE LINE
DAKOTA RECYCLING
EXISTING STORMWATER PIPE
LEASE LINE
SERVICES LLC
90
70
50
80
50
60
52
SILT FENCE
4.58 ACRES 58 Church Street, Suite 200
54
BUILDING SETBACKS
Saratoga Springs, New York 12866
70
56 Phone: 518.584.8661
6058
40
70 MAJOR CONTOURS 70 PROPOSED CONTOURS SILT 6 62 www.clasite.com
66 4 5658 62
60
50
SILT
96
68
4 EMERGENCY ACCESS SILT 70 60
68 MINOR CONTOURS 10 56 62
60
SILT
TYPICAL AERIAL FIRE TRUCK SETBA
CK
20 FT
102 100
64
a
ld Are
OPERATOR/APPLICANT :
ximate
NOTES 100
ing Fie
Appro
66
1. THE FIRE APPARATUS ACCESS98 ROAD SHALL SUPPORT FIRE APPARATUS LOADS AND DAKOTA SUPPLY
68
Contact: Jeff Manganello
Leach
94
PROVIDE ALL-WEATHER ACCESS
96 IN COMPLIANCE WITH NEW YORK STATE
REQUIREMENTS. CORP.
0"
70
94 Thalle Industries, Inc.
R45'-
2. THE FIRE APPARATUS ACCESS ROAD MUST REMAIN FREE FROM OBSTRUCTIONS,
7
51 Route 100
26'-0"
INCLUDING BUT NOT LIMITED TO MATERIALS, VEHICLES, SNOW, ICE, AND Refer to Phase 1
92
EQUIPMENT. R4
5' Briarcliff Manor, New York 10510
3. THE CURRENT GRAVEL ACCESS ROAD IS CONSTRUCTED OF GRAVEL AND HAS A
DEMONSTRATED HISTORY OF SUPPORTING VEHICLES WEIGHING IN EXCESS OF 75,000Site Plan
-0
"
'-0
" Phone: 914.762.3415
62
POUNDS, CONSISTENT WITH THE REQUIREMENTS OF THE NEW YORK STATE FIRE 100 20
64
CODE. THE ROAD HAS BEEN ROUTINELY USED BY HEAVY VEHICLES WITHOUT
66
W
STRUCTURAL FAILURE OR OPERATIONAL
92 LIMITATIONS. 6' Chain Link Fence
68
Sewer Late
4. THE ACCESS ROAD HAS BEEN UTILIZED ON A YEAR-ROUND BASIS AND HAS PROPERTY OWNER:
60
70
CONSISTENTLY PROVIDED AN ALL-WEATHER DRIVING SURFACE. THE ROAD IS 100 SILT
W
72
ACTIVELY MAINTAINED AND CLEARED DURING PERIODS OF INCLEMENT WEATHER,90
50
ence
74
INCLUDING SNOW AND ICE CONDITIONS, ENSURING CONTINUOUS AND RELIABLE EMERGENCY Bilotta Realty of Westchester,
ral
ink F
W
ACCESS FOR EMERGENCY VEHICLES AT ALL TIMES.
W
VEHICLE ACCESS
ain L
Inc. and Briga Enterprises Inc.
76
SILT
4' Ch
5. SIGNAGE TO BE POSTED ON BOTH SIDES OF EMERGENCY ACCESS ROADWAYS TO
KEEP THE ROAD CLEAR. SEE IMAGE OF PROPOSED SIGNAGE ON THIS SHEET. 2099 Albany Post Rd,
6. ACCESS ROAD SLOPES WITHIN THE FACILITY RANGE FROM <1 TO 3%. 90 Montrose, NY 10548
EXTENT OF WHEEL AND
Phone: 914.737.7891
100 R155'-0"
90 FRONT/REAR OVERHAND
ate
LFG
110 MOVEMENT
4' C
26'-0"
Phase 2
D
88
EXTENT OF WHEEL AND 120
Existing Material
ROA
ACK
FRONT/REAR OVERHAND
Storage Bin
Dakota
ETB
MOVEMENT 26'-
0"
FT S
88 94
0
Recycling Services
12
Proposed Garbage Container
20
APPROXIMATE LEASE LINE,
6' Fence Enclosure
round
0
11
On G
4' CLF
SEE LEASE AGREEMENT and
rage
92
T
a
g Are
ck Sto
86
POS
e Blo
0
Dakota
10
Parkin
oncret
CK
TB A
40
T SE
ing C
50
20 F
60
70
80
Concrete Services
lt
Exist
R5
Aspha
E
TYPICAL AERIAL FIRE
5'
-0
MATERIAL
TRUCK
"
E
LANDS N PECKHAM INDUSTRIES
MATERIAL STORAGE ON GROUND
0"
ANY
0'-
E
ST
e On Ground
R2
ORAGE ON
R3
5'
-0 Town of Cortlandt,
MATERIAL STORAGE ON GROUND
Fence
E
"
86
terial Storag
Westchester, New York
26'-0"
in Link
ALB
GROUND
M1
C
4' Cha
E
Existing Ma
ZON LINE H
sford w
Aerial Elm
88
G W
INE
E
50
50
50
G W
50
Water Valve TYPICAL AERIAL FIRE
60
70
80
G W
80
Gas Valve 0"
TRUCK R20'- Date Revision Drawn
G
E L
E
W
01/20/2026 Town Engineer's Comments WD
G
SECONDARY ENTRANCE TRUCK MOVEMENT ANALYSIS
E
94
94
E
W
ZON
S
94 R5
G
S 0'
90
E
S -0
"
W
84 S
SECONDARY
ND ENTRANCE
MATER
GROU
Mason
E ON WITH 30'-4" WIDE
L S TORAG EMERGENCY
RIA
IA
MATE LOCKED GATE
Yard
L STOR
92
VEHICLE ACCESS Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
Office
P.C. It is a violation of the New York State Education Law for any
AGE O
DAKOTA CONCRETE LLC
92
unauthorized alterations to this document as per Article 145 and 147.
all
D
OUN
g W
N GRO
OE N GR
PRIMARY ENTRANCE
GE O
tainin
ORA
1.38 ACRES
"
R3
-0
L ST
ERIA WITH 30'-4" WIDE
e Re
N 15° 15'12" W
UND
MAT
0'
0'-
90
W
D
60
OUN R3
60
Ston
LOCKED GATE
50
0"
10.00' N GR
88
App W
GE O 0"
rox.
ORA 0'-
86
OE
L ST
Loc
TAL ERIA ACK R3
atio
0' ME MAT ETB Project No. 20-1104 Drawn By: WD
R5
n of W
Sto
n eR 40'X6 DING FT S
OSED
Exis
0'
eta IL 20
PROP RAGE BU
t.
inin
-0
2" W
g
Wa STO 94
"
Date: 05/27/2025 Checked By: SEM
ater W
ll
Line
OE
EX Sheet 13 of 25
W
W
4' C IST
Conc. Vault PP h
EX
IST ING
ain L
82 W ink F
e nce
W
ING
RE
BA
PIP
E ST
OR
R RA 94
AG
92
CK
PRIMARY
W
E
90
W
Rebar Fnd. On Line 94
Aerial Elmsford
W
W 88 ST EXIS
W
ENTRANCE
OR TIN
AG G
W 86 92 E & PIP
CU E
W
SECONDARY
LTE
90 CS W
ENTRANCE
54
W
84 W W
W
W
W
PP
sford
SECONDARY
ENTRANCE
EXTENT OF WHEEL AND FIRE & EMERGENCY
Aerial Elm FRONT/REAR OVERHAND
52
50' Wide Easement MOVEMENT RESPONSE ACCESS PLAN
0 40'
PRIMARY ENTRANCE 50
TYPICAL AERIAL FIRE
WITH 34'-1" WIDE
LOCKED GATE TRUCK
62 48
20' 80'
CLA-10
64
46
42
66
44
Page 123
WATER FLOWS BACK INTO SITE
PAVED
TIRE WASH AREA 30.0'
ACCESS
GRAVEL
DRIVE
TRACK OUT ACCESS
MATT DRIVE
58 Church Street, Suite 200
Saratoga Springs, New York 12866
Phone: 518.584.8661
www.clasite.com
CONCRETE HEIGHT = 4" MAX
ROAD
PLANT EASEMENT
UNDISTURBED SUBGRADE 2" 2"
10" 10"
OPERATOR/APPLICANT :
WIDTH = 3'
SECTION
NTS Contact: Jeff Manganello
Thalle Industries, Inc.
2 ASPHALT MOUNTABLE CURB FOR STORMWATER DIVERSION
CLA-11 SCALE: NOT TO SCALE 51 Route 100
Briarcliff Manor, New York 10510
Phone: 914.762.3415
PROPERTY OWNER:
Bilotta Realty of Westchester,
Inc. and Briga Enterprises Inc.
2099 Albany Post Rd,
Montrose, NY 10548
Phone: 914.737.7891
Phase 2
TRACK OUT MATT Dakota
1
TIRE WASH AREA Recycling Services
CLA-11 SCALE: NOT TO SCALE
and
Dakota
Concrete Services
INSTALLATION NOTES
PLASTIC CAP, 1. CONSTRUCTION FENCE SHOWN SHALL BE INSTALLED PRIOR TO ANY LAND Town of Cortlandt,
TYP.
DISTURBING ACTIVITIES Westchester, New York
2. CONSTRUCTION FENCE SHALL BE COMPOSED OF ORANGE CONTRACTOR-GRADE
MATERIAL THAT IS AT LEAST 4' HIGH. METAL POSTS SHOULD HAVE A PLASTIC CAP
FOR SAFETY. Date Revision Drawn
STUDDED STEEL
3. STUDDED STEEL TEE POSTS SHALL BE UTILIZED TO SUPPORT THE CONSTRUCTION
TEE POST FENCE. MAXIMUM SPACING FOR STEEL TEE POSTS SHALL BE 10'.
4. CONSTRUCTION FENCE SHALL BE SECURELY FASTENED TO THE TOP, MIDDLE, AND
ORANGE RESINET
BOTTOM OF EACH POST.
CONSTRUCTION FENCE
5' MIN
OR APPROVED EQUAL MAINTENANCE NOTES
EXISTING 1. INSPECT BMPS EACH WORKDAY, AND MAINTAIN THEM IN EFFECTIVE OPERATING
GRADE Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
CONDITION. MAINTENANCE OF BMPS SHOULD BE PROACTIVE, NOT REACTIVE. P.C. It is a violation of the New York State Education Law for any
unauthorized alterations to this document as per Article 145 and 147.
INSPECT BMPS AS SOON AS POSSIBLE (AND ALWAYS WITHIN 24 HOURS) FOLLOWING
A STORM THAT CAUSES SURFACE EROSION, AND PERFORM NECESSARY
1' MIN
MAINTENANCE.
G
IN 2. FREQUENT OBSERVATIONS AND MAINTENANCE ARE NECESSARY TO MAINTAIN BMPS
AC
X SP Project No. 20-1104 Drawn By: WD
' MA IN EFFECTIVE OPERATING CONDITION. INSPECTIONS AND CORRECTIVE MEASURES
10
SHOULD BE DOCUMENTED THOROUGHLY. Date: 01/20/2026 Checked By: SEM
3. WHERE BMPS HAVE FAILED, REPAIR OR REPLACEMENT SHOULD BE INITIATED UPON
DISCOVERY OF THE FAILURE. Sheet 14 of 25
STUDDED STEEL 4. CONSTRUCTION FENCE SHALL BE REPAIRED OR REPLACED WHEN THERE ARE SIGNS
TEE POST
4' MIN
OF DAMAGE SUCH AS RIPS OR SAGS. CONSTRUCTION FENCE IS TO REMAIN IN PLACE
UNTIL THE UPSTREAM DISTURBED AREA IS STABILIZED AND APPROVED BY THE
LOCAL JURISDICTION.
5. WHEN CONSTRUCTION FENCES ARE REMOVED, ALL DISTURBED AREAS ASSOCIATED
WITH THE INSTALLATION. MAINTENANCE . AND/OR REMOVAL OF THE FENCE SHALL
BE COVERED WITH TOPSOIL, SEEDED AND MULCHED/ OR OTHERWISE STABILIZED AS
GENERAL DETAILS
APPROVED BY LOCAL JURISDICTION.
4 PLASTIC MESH CONSTRUCTION FENCE
CLA-11 SCALE: NOT TO SCALE
CLA-11
Page 124
60
LEGEND
PROPERTY LINE DRAINAGE DISCHARGE POINT
DAKOTA RECYCLING
90
70
50
LEASE LINE DRAINAGE ARROW
SERVICES LLC
80
DRAINAGE AREA DA-1 50
60
52 58 Church Street, Suite 200
54
BUILDING SETBACKS DRAINAGE AREA BOUNDARY Saratoga Springs, New York 12866
70
6.49 ACRES 6058
56 Phone: 518.584.8661
40
6 62 www.clasite.com
⇨ TIME OF CONCENTRATION
CN=92 D SILT
66 4 5658 62
60
ACCESS ROAD
50
SILT
FLOWPATH
96
68
70 MAJOR CONTOURS 10
4
TC=4.7 MINS 56
SILT 70 60
62
60
CHAIN LINK FENCE SILT
CK
SETBA
20 FT
102 100 OUTFALL 002
64
a
68 MINOR CONTOURS
ld Are
OPERATOR/APPLICANT :
ximate
SILT FENCE RECYCLING
100
ing Fie
Appro
66
98
68
Contact: Jeff Manganello
Leach
70 PROPOSED CONTOURS 94
96 EXISTING STORMWATER PIPE
70
94 Thalle Industries, Inc.
PORTABLE TANK A
7
DAKOTA CONCRETE LLC PROPOESED STORMWATER PIPE
800 GAL DIESEL SEE STR-R4 FOR 51 Route 100
92
SPILL KIT PROPOSED POND Briarcliff Manor, New York 10510
EXISTING DRAIN Phone: 914.762.3415
CROSS SECTION
62
INLET STRUCTURE
100
64
66
W
92 6' Chain Link Fence SEE SHEETS STR-R3,
68
Sewer Late
PROPERTY OWNER:
60
R4, R5 AND R6 FOR
70
100 SILT
W
72
PROPOSED POND
50
ence
74
90
IMPROVEMENTS
Bilotta Realty of Westchester,
ral
ink F
W
W
ain L
Inc. and Briga Enterprises Inc.
76
SILT
4' Ch
⇨
EXISTING DRAIN INLET 2099 Albany Post Rd,
STRUCTURE
90 Montrose, NY 10548
Phone: 914.737.7891
100 TANK 7
DAKOTA SUPPLY
⇨
90 2,000 GAL USED OIL
ate
LFG
110 SEE SWPPP APPENDIX G
CORP.
4' C
TANK 8
300 GAL HYDRAULIC OIL
SHEETS CLA-08 FOR SPILL KIT
Refer to Phase 1 PROPOSED IMPROVEMENTS IN SHOP
Phase 2
D
88
⇨
120 TANK 9
Site Plan Existing Material
ROA
ACK
Storage Bin 250 GAL MOTOR OIL
Dakota
ETB
FT S
88 94
0
Recycling Services
12
Proposed Garbage Container
⇨
20
APPROXIMATE LEASE LINE,
6' Fence Enclosure
round
0
11
On G
4' CLF
SEE LEASE AGREEMENT and
rage
92
T
a
g Are
ck Sto
TANK 5
86
POS
275 GAL #2 FUEL OIL
e Blo
0
Dakota
10
Parkin
⇨
oncret
TANK 2
40
ing C
50
1,000 GAL GASOLINE
60
70
80
Concrete Services
lt
Exist
Aspha
E
TANK 4
SPILL KIT 275 GAL #2 FUEL OIL
MATERIAL
⇨
E
LANDS N PECKHAM INDUSTRIES
MATERIAL STORAGE ON GROUND
TANK 1
ANY
PROPOSED WHEEL 2,000 GAL DIESEL
E
ST
e On Ground
ORAGE ON
WASH PAD
⇨ Town of Cortlandt,
MATERIAL STORAGE ON GROUND
Fence
E
86
terial Storag
⇨ PROPOSED DETENTION
Westchester, New York
in Link
ALB
GROUND
M1
C
⇨ POND
4' Cha
E
Existing Ma
ZON LINE H
w
88
G W
INE
⇨
E
50
⇨
50
50
G W
⇨
50
Water Valve
60
⇨ ⇨
70
80
G W
TANK 3
80
Gas Valve
⇨ Date Revision Drawn
G
E L
E
2,000 GAL DIESEL
⇨
W
03/24/2025 Tank Information Update WD
G
⇨
E
94
94
E
TANK 6
04/11/2025 Added drainage arrows, spill kits, minor corrections ALG
W
ZON
S
94 1,000 GAL #2 FUEL OIL
⇨
G
S
90
E
05/27/2025 Pond update and Site Plan Application additions WD
S
EXISTING HOSE /NOZZLE
⇨
W
84 S
WD
LOCATION FOR WASH PAD 07/24/2025 Outfall Number Changed
⇨ OUND
MATER
01/20/2026 Town Engineer's Comments WD
N GR
Mason
AGE O
STOR
RIAL PROPOSED ASPHALT
IA
MATE
Yard
L STOR
92 MOUNTABLE CURB Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
Office
PROPOSED DETENTION POND P.C. It is a violation of the New York State Education Law for any
AGE O
92
DISCHARGE CULVERT unauthorized alterations to this document as per Article 145 and 147.
all
D
OUN
g W
N GRO
OE N GR
GE O
tainin
ORA
L ST
ERIA
e Re
N 15° 15'12" W
UND
MAT
90
W
D
60
OUN
60
Ston
50
10.00' N GR
88
App W
GE O
rox.
ORA
86
OE
L ST
Loc
TAL ERIA ACK
atio
0' ME MAT B Project No. 20-1104 Drawn By: WD
n of W
Sto
n eR 40'X6 DING T SET
OSED
Exis
eta IL 20 F
PROP RAGE BU
t.
DAKOTA CONCRETE LLC
inin
2" W
g
Wa STO 94 Date: 12/20/2024 Checked By: PMA
ater W
ll
Line
OE
EX Sheet 15 of 25
W
W
4' C IST
Conc. Vault PP h
EX
IST ING
ain L
82 W ink F
e nce
W
ING
RE
BA
PIP
E ST
OR
R RA 94
AG
92
W CK E
90
W
Rebar Fnd. On Line
W
94
W
W 88 ST EXIS
OR TIN
AG G
W 86 92 E & PIP
CU E
W
LTE
90 CS W
54
W
84 W W
W
W
W
PP
RECYCLING SWPPP
52
50' Wide Easement DRAINAGE PLAN
0 40'
50
64
62 48
20' 80'
STR-R1
46
42
66
44
Page 125
40
LEGEND
50
PROPERTY LINE 50
60
52
BUILDING SETBACKS
58 Church Street, Suite 200
70 MAJOR CONTOURS
50
Saratoga Springs, New York 12866
54 Phone: 518.584.8661
68 MINOR CONTOURS www.clasite.com
62
60
60
60
58
70 62
56
CHAIN LINK FENCE
EXISTING STORMWATER PIPE
56 OPERATOR/APPLICANT :
58
60 Contact: Jeff Manganello
62 Thalle Industries, Inc.
64 51 Route 100
66 Briarcliff Manor, New York 10510
Phone: 914.762.3415
64
EXISTING TRI-GALLERY
SUBSURFACE SEWER
68
DISPOSAL AREA
PROPERTY OWNER:
66
Bilotta Realty of Westchester,
70
60
68
Inc. and Briga Enterprises Inc.
70
Area
2099 Albany Post Rd,
Field
ate
Montrose, NY 10548
70
oxim
Phone: 914.737.7891
g
50
n
EXISTING 1,000 GAL
72
i
Appr
each
SEPTIC TANK
62
L
60
64
66
Phase 2
68
Dakota
70
EXISTING CHAIN LINK FENCE
Recycling Services
and
72
56 Dakota
74
Concrete Services
Sew
60
76
er
Town of Cortlandt,
K
Lat
C
Westchester, New York
BA
era
T
SE
l
70
FT
Date Revision Drawn
20
05/27/2025 Adding septic system information WD
01/20/2026 Town Engineer's Comments WD
Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
P.C. It is a violation of the New York State Education Law for any
unauthorized alterations to this document as per Article 145 and 147.
K
BAC ET
Project No. 20-1104 Drawn By: WD
TS
ST ST ST
ST ST ST
Date: 12/20/2024 Checked By: PMA
F
20
Sheet 16 of 25
60
70
80
RECYCLING DETENTION POND
0 20'
EXISTING CONDITIONS
10' 40'
STR-R2
Page 126
40
LEGEND
50
PROPERTY LINE 50
60
GRAVEL
52
BUILDING SETBACKS
HAUL ROAD CHAIN LINK FENCE 58 Church Street, Suite 200
50
Saratoga Springs, New York 12866
70 MAJOR CONTOURS EXISTING STORMWATER PIPE 54 Phone: 518.584.8661
www.clasite.com
62
68 MINOR CONTOURS SILT FENCE 60
60
60
58
70 PROPOSED CONTOUR 62
56
56 OPERATOR/APPLICANT :
58
60 Contact: Jeff Manganello
62 Thalle Industries, Inc.
1 PROPOSED SILT SOCK, 64 51 Route 100
STR-R6 TYP. 66 Briarcliff Manor, New York 10510
SEE STR-R5 FOR Phone: 914.762.3415
64
PROPOSED POND
EXISTING TRI-GALLERY
CROSS SECTION
LT
68
SUBSURFACE SEWER
SI
DISPOSAL AREA PROPERTY OWNER:
66
Bilotta Realty of Westchester,
70
60
68
LT
SI
Inc. and Briga Enterprises Inc.
70
Area
PROPOSED PLASTIC MESH 4 2099 Albany Post Rd,
Field
ate
PROPOSED EMERGENCY SPILLWAY II CONSTRUCTION FENCE CLA-11 Montrose, NY 10548
70
oxim
WIDTH=15 FEET
TL
Phone: 914.737.7891
SI
4
g
STONE D50=6-8 INCHES
50
n
72
STR-R4
i
EXISTING 1,000 GAL
Appr
INV=68.85 PROPOSED SILT SOCK,
each
TOP OF BERM 70.50 TYP. 62 SEPTIC TANK
L
60
T
PROPOSED ROCK OUTLET PROTECTION
L
SI
64
4 L=21FT, W=23.5FT
STR-R5 D50=9 INCHES
MIN THICKNESS = 20 INCHES
66
Phase 2
68
Dakota
TL
PROPOSED POND OUTLET
SI
1 REMOVE EXISTING 12"CMP
STR-R5 REPLACE WITH NEW 30" CPP
INV IN=64.33
70
Recycling Services
EXISTING CHAIN LINK FENCE
INV OUT= 55.13 LT
and
72
SI
1 2
RECONSTRUCT POND OUTLET CONTROL STRUCTURE
GRATE: 36"X48" RIM=68.00
56 Dakota
74
STR-R5 STR-R5
7.9" X 32" STAGE I ORIFICE (X2)=66.67
2" LOW FLOW ORIFICE=64.50 Concrete Services
TL
SI
Sew
PROPOSED STONE ARMORED CHECK DAMS
60
76
AT EDGE OF FOREBAYS
HEIGHT=±30"
er
D50=6-8 INCHES Town of Cortlandt,
LT
SI
K
Lat
C
Westchester, New York
BA
era
T
SE
l
70
VERTICAL SEDIMENT DEPTH MARKER III
FT
CLEAN OUT ELEVATION=66.97 Date Revision Drawn
20
05/27/2025 Pond Update WD
VERTICAL SEDIMENT DEPTH MARKER I & II
PROPOSED EMERGENCY SPILLWAY I 01/20/2026 Town Engineer's Comments WD
CLEAN OUT ELEVATION=69.83 4
WIDTH=13 FEET
STONE D50=6-8 INCHES STR-R4
INV=74.00
TOP OF BERM 74.50
LT
SI
Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
SIL
PROPOSED SILT SOCK, TYP. P.C. It is a violation of the New York State Education Law for any
T
UNDISTURBED AREA unauthorized alterations to this document as per Article 145 and 147.
0.70± ACRES PROPOSED STONE APRONS
AT PIPE OUTLETS PROPOSED STONE FILL
K
D50=8 INCHES
T
SIL D50=2-4 INCHES DIA
BAC
5 PROPOSED HEADWALL
ET
STR-R4
Project No. 20-1104 Drawn By: WD
TS
PROPOSED 18" SPP PIPE, Date: 12/20/2024 Checked By: PMA
W
F
3 17.5 FT, @ 1.0%
⇨
20
STR-R4 INV IN=69.20 Sheet 17 of 25
60
INV OUT=69.00
W
W
RESET EXISTING CATCH BASIN WITH
W
⇨
70
2 RIM=73.00 W
STR-R4 18" DIA PIPE INVERT OUT = 69.20
W
W
INV IN: TO BE ADJUSTED IN FIELD
W
80
RECYCLING DETENTION POND
W
⇨
PROPOSED JERSEY
BARRIERS
0 20'
PROPOSED CONDITIONS
STR-R3
⇨
10' 40'
Page 127
100 YEAR EVENT - 69.57'
VERTICAL SEDIMENT DEPTH MARKER I 25 YEAR EVENT - 68.86'
EMERGENCY SPILLWAY I CLEAN OUT ELEVATION=69.83
SEE NOTE 1 10 YEAR EVENT - 68.49'
RESET EXISTING CATCH BASIN, TOP ELEVATION - 74.50' 1 YEAR EVENT - 67.39'
75.00 SEE 2/STR-R4 EMERGENCY SPILLWAY II 75.00
WEIR ELEVATION - 74.00' PERMANENT WATER
74.00 CHECK DAM, ELEVATION - 64.5' RECONSTRUCT POND OUTLET 74.00
PROPOSED CONTROL STRUCTURE
73.00 HEIGHT=30"± TOP ELEVATION - 70.50' 73.00
HEADWALL SEE DETAIL 5/STR-R5
72.00 1 D/50=6-8 INCHES 72.00
SEE DETAIL 58 Church Street, Suite 200
71.00 3 71.00
5/STR-R4
70.00 WEIR ELEVATION - 68.85' 70.00 Saratoga Springs, New York 12866
69.00 69.00 Phone: 518.584.8661
68.00 68.00 www.clasite.com
67.00 67.00
66.00 66.00
65.00 65.00
1
18" SPP PIPE, 17.5 FT, @1.0% 2 1
INV IN=69.20 2
OPERATOR/APPLICANT :
NOTES: INV OUT=69.00
FOREBAY,
1. A FIXED VERTICAL SEDIMENT DEPTH MARKER SHALL BE STONE APRONS AT PIPE OUTLET BOTTOM ELEVATION 69.00' VERTICAL SEDIMENT DEPTH MARKER III
CLEAN OUT ELEVATION = 66.97
Contact: Jeff Manganello
INSTALLED IN THE FOREBAY TO MEASURE SEDIMENT D50=8 INCHES 55.13
DEPOSITION OVER TIME. THE MARKER SHALL BE MADE OF SLOPE STABILIZATION
SEE NOTE 1 Thalle Industries, Inc.
DURABLE, NON-CORRODING MATERIAL (NOT STEEL). THE SEE DETAIL 2/STR-R6
30" CPP PIPE, 50.5FT @18.2%
51 Route 100
ELEVATION AT WHICH SEDIMENT REMOVAL IS REQUIRED SHALL
BE MARKED WITH A LINE IN A CONTRASTING COLOR OR SHADE. MAIN POND,
INVERT IN=64.33 Briarcliff Manor, New York 10510
INVERT OUT=55.13 (3) ANTI-SEEP COLLARS, 4.3'X4.3' ROCK OUTLET PROTECTION
BOTTOM ELEVATION 62.00' SPACE EVENLY ALONG CULVERT SEE DETAIL 4/STR-R5 Phone: 914.762.3415
SEE DETAIL 3/STR-R5
1 DETENTION BASIN CROSS SECTION
STR-R4 SCALE: NOT TO SCALE
PROPERTY OWNER:
Bilotta Realty of Westchester,
2"x2" WOOD STAKE
Inc. and Briga Enterprises Inc.
MIRAFI 140N FILTER
6" HIGH FRAME EXISTING CATCH TEMPORARY FILTREXX SOCK 2099 Albany Post Rd,
TEMPORARY FILTREXX SOCK BASIN FRAME & GRATE AROUND PERIMETER OF
AROUND PERIMETER OF
FABRIC WRAPPED AROUND CATCH BASIN.
SEDIMENT TRAP AREA REMOVE Montrose, NY 10548
SECURE TO FRAME WITH RATCHET STRAP 1/2" WEEP HOLE ON EACH
SEDIMENT TRAP AREA REMOVE
SIDE OF THE CATCH BASIN
AFTER CONSTRUCTION
6" TOPSOIL, FERTILIZE, LIME,
Phone: 914.737.7891
AFTER CONSTRUCTION
STONE TO ANCHOR SEED AND MULCH
FILTER FABRIC AND PROVIDE 73.0
ADDITIONAL FILTRATION 6" OF 2"-4" STONE ℄ TRENCH WALLS LAID BACK PER OSHA
1.5 FT 72.5 REQUIREMENTS OR SHEETING A.O.B.E.
12"
±
72.0 IN PVMT IN TURF
12"
BORROW - WELL GRADED INORGANIC
Phase 2
±
GRANULAR SOILS AND/OR ROCK, MAX.
FINISHED GRADE 1-1/2" SIZE, NOT MORE THAN 20% BY
2 FT 71.5 WEIGHT PASSING #200 OR NATIVE
70.7
1.5 MATERIAL, A.O.B.E. SIEVE. (USE VIBRATORY
Dakota
SHEETING LINE
COMPACTOR WITH 12" LIFTS)
6 IN
1
VARIES
PIPE ZONE BACKFILL - GRADATION SHALL
BE: "WELL GRADED SAND WITH 3/4" MAX. Recycling Services
INVERT PARTICLE SIZE AND NOT MORE THAN 10%
69.2
SPRINGLINE PASSING #200 SIEVE (USE VIBRATORY
COMPACTOR WITH 8" LIFTS)
and
INVERT
SEE NOTE 1
OUTLET
VARIES PIPE ZONE BEDDING - FOUNDATION STONE
TO CONFORM TO COARSE AGGREGATE (SEE
Dakota
2 FT
NOTE 1)
NOTES: STANDARD 3X3
THE ELIMINATOR WATER - OIL
O.D. + 3'
UNDISTURBED SUBGRADE OR EXTRA
Concrete Services
CATCH BASIN NOTES:
SEPARATOR, OR APPROVED EQUAL FOUNDATION STONE A.O.B.E.
1. PROVIDE "V" KNOCKOUTS FOR PIPES WITH 2" MAX. CLEARANCE TO
67.2
OUTSIDE OF PIPE. MORTAR ALL PIPE CONNECTIONS. 1. FOUNDATION STONE
2. SIZE DETERMINATION #1: 100% PASSING 1" SIEVE, 90-100% PASSING 1/2" SIEVE, 0-15% PASSING 1/4"
COMPACTED
2. HOOD SHALL BE "THE ELIMINATOR" OIL & FLOATING DEBRIS TRAP, GRAVEL
SIEVE OR SIZE DETERMINATION #2: 100% PASSING 1-1/2" SIEVE, 90-100% PASSING 1" SIEVE. 0-15%
PASSING 1/2" SIEVE
Town of Cortlandt,
OR APPROVED EQUAL. 3. GRADATION/SIZE DESIGNATION TO BE DETERMINED BY ENGINEER BASED ON FIELD CONDITIONS.
Westchester, New York
2 RESET EXISTING CATCH BASIN 3 STORMWATER PIPING TRENCH DETAIL
STR-R4 SCALE: NOT TO SCALE STR-R4 SCALE: NOT TO SCALE
Date Revision Drawn
05/27/2025 Orifice Detail Update WD
01/20/2026 Town Engineer's Comments WD
EARTHEN BERM - MATERIAL TO BE FREE FROM
ROOTS, STUMPS, WOOD, RUBBISH, FROZEN
OR OTHER OBJECTIONABLE MATERIAL, AND Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
STONES GREATER THAN 6". FILL MATERIAL P.C. It is a violation of the New York State Education Law for any
FOR THE CENTER OF THE EMBANKMENT, unauthorized alterations to this document as per Article 145 and 147.
AND/OR CUT OFF TRENCH SHALL CONFORM WEIR BREADTH VARIES WEIR WIDTH - 15'-0"
TO UNIFIED SOIL CLASSIFICATION GC, SC, CH, SEE STR-R3
OR CL AND MUST HAVE AT LEAST 30%
PASSING THE #200 SIEVE. DRAINAGE
VARIES
FLOW
INFILTRATION
Project No. 20-1104 Drawn By: WD
BASIN/FORBAY
FRONT VIEW Date: 12/20/2024 Checked By: PMA
TOP VIEW Sheet 18 of 25
OVERFLOW WATER LEVEL NOTES:
RIP RAP OUTLET AND APRON. 1. THE CONCRETE USED SHALL BE 4000 PSI PORTLAND CEMENT, AIR-ENTRAINED, CLASS "D" CONCRETE WITH AN AIR
COMPACTED OR
SEE CHART FOR SPECIFICATION. CONTENT OF 5%, MIN., TO 7%, MAX., AND A SLUMP OF TWO INCHES, MIN., TO THREE INCHES MAX.
UNDISTURBED SUBGRADE
2. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR APPROVAL. SIZED BASED ON PIPE DIAMETER AND FIELD CONDITIONS.
3. INSERT PIPE INTO HEADWALL, WITH PIPE RESTING ON BEDDING. THE PIPE SHOULD BE IN THE APPROXIMATE CENTER OF
WEIR APRON RIP RAP SIZING
THE OPENING.
DISCHARGE 4. GROUT PIPE INTO CONCRETE STRUCTURE WITH NON-SHRINK GROUT. SOLID MASONRY UNITS, FULLY GROUTED IN
RIP RAP SIZE BLANKET APRON APRON
STRUCTURE INVERT OUT 100-YR
PLACE, MAY BE USED TO HELP FILL LARGE VOIDS.
SPILLWAY I 74.00
(d50)
6-8"
THICKNESS
14"
LENGTH
8' MIN.
WIDTH
10' MIN.
CFS
0.00
5. PIPE AT AND AROUND STRUCTURE CONNECTION TO BE INSTALLED PER ASTM D2321. RECYCLING DETENTION
6. MINIMUM COVER: MINIMUM COVER, H, IN NON-TRAFFIC APPLICATIONS (GRASS OR LANDSCAPE AREAS) IS 12" (300mm)
SPILLWAY II 68.85 6-8" 14" 8' MIN. 10' MIN. 24.41 FROM THE TOP OF PIPE TO GROUND SURFACE. ADDITIONAL COVER MAY BE REQUIRED TO PREVENT FLOTATION. FOR
TRAFFIC APPLICATIONS, MINIMUM COVER, H, IS 12" (300mm) UP TO 48" (1200mm) DIAMETER PIPE AND 24" (600mm)
POND DETAILS
OF COVER FOR 60" (1500mm) DIAMETER PIPE, MEASURED FROM TOP OF PIPE TO BOTTOM OF FLEXIBLE PAVEMENT OR
4 EMERGENCY SPILLWAY
STR-R4 SCALE: NOT TO SCALE 5 HEADWALL TO TOP OF RIGID PAVEMENT. STR-R4
STR-R4 SCALE: NOT TO SCALE
Page 128
KOR-N-SEAL GASKET OR
APPROVED EQUIVALENT TRASH RACK ON TOP,
48" SEE DETAIL 2/STR-R5
36" 68.00 58 Church Street, Suite 200
TRASH RACK ON SIDE, Saratoga Springs, New York 12866
MAX 3" PROJECTION SEE DETAIL 2/STR-R5 Phone: 518.584.8661
www.clasite.com
66.67 7.9" x 32" STAGE I
64.33 ORIFICE (x2)
1 @ 30" DIA. CPP
DOWNSTREAM INVERT 55.13 64.50 2.0" DIA. LFO ORIFICE
NOTES: OPERATOR/APPLICANT :
1. THE CONCRETE USED SHALL BE 4000 PSI PORTLAND
INSIDE RISER CEMENT, AIR-ENTRAINED, CLASS "D" CONCRETE WITH
1 @ 36X48-IN RISER
AN AIR CONTENT OF 5%, MIN., TO 7%, MAX., AND A Contact: Jeff Manganello
4 INCHES WALL THICKNESS
TRASH RACK ON TOP
SLUMP OF TWO INCHES, MIN., TO THREE INCHES MAX.\ Thalle Industries, Inc.
2. PROVIDE COPOLYMER STEPS FOR EASE OF
68.00 MAINTENANCE. 51 Route 100
8" MIN Briarcliff Manor, New York 10510
TRASH RACK, SEE DETAIL 2/STR-R5 Phone: 914.762.3415
66.83
CATCH BASIN
OPENING TO
ACCOMMODATE 6" PROPERTY OWNER:
PIPE AND GASKET 4" PVC PIPE
DRILL ORIFICE Bilotta Realty of Westchester,
64.33 6" SECURE WIRE
IN PIPE CAP Inc. and Briga Enterprises Inc.
MESH SCREEN
TRASH RACK SIZES NEEDED
LFO OVER PIPE OPENING 2099 Albany Post Rd,
ORIFICE TO PREVENT PASSING 36"X48" TOP (1)
12" MIN
1/8" SOLIDS 7.9" X 32" SIDES (2) Montrose, NY 10548
4" MIN.
Phone: 914.737.7891
INSIDE RISER ORIFICE
PROTECTION
POND OUTLET CONFIGURATION
1
STR-R5 SCALE: NOT TO SCALE Phase 2
TRASH RACK, OR APPROVED EQUAL
Dakota
2
STR-R5 SCALE: NOT TO SCALE Recycling Services
and
Dakota
Concrete Services
4.3'
Town of Cortlandt,
2' MIN. 2' MIN. APRON LENGTH, FINISHED GRADE, SEE Westchester, New York
SEE TABLE BELOW GRADING PLAN
PROPOSED STORM PIPE,
4.3' SEE GRADING PLAN FOR
SIZING
PROPOSED FLARED END
Date Revision Drawn
SECTION
APRON LENGTH +
01/20/2026 Town Engineer's Comments WD
BLANKET THICKNESS,
3X PIPE ∅
PIPE ∅
SEE TABLE BELOW
4.3'
3' MIN.
4.3' 12" MIN. FILTER FABRIC, MIRAFI Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
140N OR APPROVED
P.C. It is a violation of the New York State Education Law for any
PROPOSED END SECTION EQUAL
12" MIN. unauthorized alterations to this document as per Article 145 and 147.
NOTES:
1. RIP RAP SIZES AND APRON LENGTHS ARE BASED ON THE "NEW YORK STATE STANDARDS AND
SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL."
2. RIP RAP SHALL BE COMPOSED OF A WELL-GRADED MIXTURE OF STONE. THE MINIMUM DIAMETER OF
4.3'
STONE SHALL BE NO LESS THAN HALF (12) D50 AND NO GREATER THAN ONE AND A HALF (112) D50. Project No. 20-1104 Drawn By: WD
3. LENGTH OF SLOPE PROTECTION AS SHOWN ON PLANS.
Date: 12/20/2024 Checked By: PMA
RIP RAP SIZING
4.3' DISCHARGE
PIPE PIPE RIP RAP SIZE BLANKET APRON Sheet 19 of 25
STRUCTURE PIPE SIZE 25-YR INVERT OUT
LENGTH SLOPE (d50) THICKNESS LENGTH
(CFS)
30" ∅ 42.82 50.5' 55.13 18.2% 9" 20" 21'
NOTES:
1. ANTI SEEP COLLAR SIZING AND QUANTITY IS BASED ON NYS STANDARDS AND SPECIFICATION ROCK OUTLET PROTECTION
4
FOR EROSION AND SEDIMENT CONTROL, FIGURES 5.16 TO 5.18.
STR-R5 SCALE: NOT TO SCALE
2. SEE DETAIL 1/STR-R4 FOR SPACING.
RECYCLING DETENTION
3 ANTI SEEP COLLARS
STR-R5 SCALE: NOT TO SCALE
POND DETAILS
STR-R5
Page 129
NOTES:
2" x 2" x 36" WOODEN STAKES
PLACED 10' O.C. 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY
APPLICATION OF LIME, FERTILIZER, AND SEED. APPLY 4" OF TOPSOIL TO ALL
WORK AREA BLOWN/PLACED FILTREXX SOXX (12" TYPICAL) DISTURBED AREAS AND SEED WITH THE FOLLOWING:
FILTER MEDIA OR APPROVED EQUAL
AREA TO BE PROTECTED 12" COMMON NAME WEIGHT (%) MIN. PURITY (%) MIN. GERM'N (%)
KENTUCKY BLUEGRASS 65 98 85
STORMWATER FLOW RED FESCUE 25 98 80
4"-6" 3"
PERENNIAL RYEGRASS 10 98 90
58 Church Street, Suite 200
6"
2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" DEEP Saratoga Springs, New York 12866
BY 6" WIDE TRENCH WITH APPROXIMATELY 12" OF BLANKET EXTENDED
Phone: 518.584.8661
4 5 BEYOND THE UP-SLOPE PORTION OF THE TRENCH AS SHOWN IN DETAIL 2.
12" MINIMUM 6" 2 www.clasite.com
ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY
12" APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE
TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD
REMAINING 12" PORTION OF BLANKET BACK OVER SEED AND COMPACTED
EXISTING GROUND 3B SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF
STAPLES/STAKES SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF
THE BLANKET.
3. ROLL THE BLANKETS (A) DOWN OR (B) HORIZONTALLY ACROSS THE SLOPE.
BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL
OPERATOR/APPLICANT :
SILT SOCK SECTION NTS SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY
3A PLACING STAPLES/STAKES IN APPROPRIATE LOCATION AS PER Contact: Jeff Manganello
MANUFACTURER'S RECOMMENDATIONS.
4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH MINIMUM 6" Thalle Industries, Inc.
18" OVERLAP OVERLAP. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE
MINIMUM OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE
51 Route 100
1
5.
SEAM STITCH ON THE PREVIOUSLY INSTALLED BLANKET.
CONSECUTIVE BLANKETS SPLICED DOWN THE SLOP MUST BE PLACED END
Briarcliff Manor, New York 10510
AREA TO BE FILTREXX SOXX (12" TYPICAL) OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" OVERLAP. STAPLE Phone: 914.762.3415
THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART ACROSS ENTIRE
PROTECTED OR APPROVED EQUAL BLANKET WIDTH.
6. PLACE STAPLES/STAKES PER MANUFACTURER'S RECOMMENDATION FOR THE
2" x 2" x 36" WOODEN STAKES APPROPRIATE SLOPE BEING APPLIED.
PLACED 10' O.C. 7. IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OF STAKE LENGTHS PROPERTY OWNER:
GREATER THAN 6" MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS.
8. FOLLOW EROSION CONTROL TECHNOLOGY COUNCIL SPECIFICATION FOR
PRODUCT SELECTION.
Bilotta Realty of Westchester,
2 SLOPE STABILIZATION Inc. and Briga Enterprises Inc.
WORK AREA STR-R6 SCALE: NOT TO SCALE
BLOWN/PLACED 2099 Albany Post Rd,
FILTER MEDIA
Montrose, NY 10548
SILT SOCK PLAN NTS Phone: 914.737.7891
NOTES:
1. ALL MATERIAL TO MEET FILTREXX® SPECIFICATIONS, OR APPROVED EQUAL.
2. FILTER MEDIA FILL TO MEET APPLICATION REQUIREMENTS. Phase 2
3. COMPOST MATERIAL TO BE DISPERSED ON SITE, AS DETERMINED BY ENGINEER.
4. SILT SOCKS TO BE REMOVED AFTER CONSTRUCTION. Dakota
1 FILTER SOCK, SILT FENCE OR APPROVED EQUAL Recycling Services
STR-R6 SCALE: NOT TO SCALE
and
Dakota
Concrete Services
Town of Cortlandt,
Westchester, New York
Date Revision Drawn
Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
P.C. It is a violation of the New York State Education Law for any
unauthorized alterations to this document as per Article 145 and 147.
Project No. 20-1104 Drawn By: WD
Date: 01/20/2026 Checked By: SEM
Sheet 20 of 25
RECYCLING DETENTION
POND DETAILS
STR-R6
Page 130
0
12
K
OXIMATE LEASE LINE,
BAC
LEGEND 11
0 DRAINAGE AREA CALCULATIONS:
SET
EASE AGREEMENT PROPERTY LINE DRAINAGE DISCHARGE POINT EXISTING STORMWATER PIPE DRAINAGE AREA 1 - 1.01 ACRES
DE
T SI
LEASE LINE PROPOESED STORMWATER PIPE
DRAINAGE ARROW DRAINAGE AREA 2 - 0.11 ACRES
20 F
0
10
58 Church Street, Suite 200
BUILDING SETBACKS DRAINAGE AREA BOUNDARY EXISTING JERSEY BARRIER Saratoga Springs, New York 12866
DRAINAGE AREA 3 - 0.25 ACRES
Phone: 518.584.8661
80
HAUL ROAD ⇨ TIME OF CONCENTRATION www.clasite.com
ASPHALT BERM
FLOWPATH
SEE SHEETS STR-C2, C3,
70 MAJOR CONTOURS CHAIN LINK FENCE GUTTER DRAINAGE AND C4 FOR PROPOSED
POND IMPROVEMENTS
68 MINOR CONTOURS DAKOTA CONCRETE LLC
DRAINAGE AREA DA-3
⇨ OPERATOR/APPLICANT :
DIVERSION BERM 0.25 ACRES D
CN=98
70 PROPOSED CONTOURS Tc=1.6 MINS ⇨ Contact: Jeff Manganello
EXISTING
JERSEY Thalle Industries, Inc.
SEE SHEETS STR-C3 BARRIER 51 Route 100
CONCRETE PLANT EQUIPMENT LIST FOR PROPOSED POND
⇨
PRODUCT BINS Briarcliff Manor, New York 10510
CROSS SECTION Phone: 914.762.3415
TRAILER 1 CONCRETE TESTING LAB PROPOSED
TRAILER 2 PLANT OFFICE/CONTROL ROOM DIVERSION
BERM
TRAILER 3 CONCRETE BATCHING ADDITIVE AND PROPERTY OWNER:
88
TANK #6 1,000 GALLON
⇨
DIESEL FUEL ABOVE GROUND
CHEMICAL STORAGE TANK ON SLAB CONTAINED Bilotta Realty of Westchester,
70
EXISTING
80
80
BH BAGHOUSE WITHIN REAR OF ENCLOSURE FURNACE ROOM Inc. and Briga Enterprises Inc.
S1 TOWER - TYPE I/II CEMENT STORAGE 2099 Albany Post Rd,
S2 SILICA STORAGE Montrose, NY 10548
⇨
PROPOSED 8" HDPE
PIPE I, 61.8 FT, Phone: 914.737.7891
S3 SLAG STORAGE DRAINAGE AREA DA-1 @11.6%
D INV IN=66.50
S4 TYPE I/II CEMENT STORAGE 1.01 ACRES
INV OUT=59.33
90
5
STR-C3
Phase 2
Dakota
E
E LIN
PROPOSED DROP INLET Recycling Services
RIM = 61.00
INV IN= 59.33 1 and
EXISTING MATERIAL LOADING INV OUT= 59.33 STR-C4
HOPPERS FEED TO BELT CONVEYOR
Dakota
LEAS
EXISTING FEED HOPPER
CONCRETE JERSEY
BARRIER, TYP.
AND BATCHING UNIT Concrete Services
PROVIDE ADEQUATE FILL OVER
PROPOSED STORMWATER PIPE
EXISTING ELECTRIC
TRANSFORMER
EXISTING CONCRETE Town of Cortlandt,
BLOCK FORMS AND
Westchester, New York
60
CURING AREA ON SLAB EXISTING ELECTRIC EXISTING BAGHOUSE AIR QUALITY
PANEL BOXES TREATMENT STRUCTURE
EXISTING HYDRODYNAMIC SEPERATOR
EXISTING EXISTING PLANT MIX
20 FT SETBACK CATCH BASIN
STRUCTURE "HDS-1"
DISPENSER TRUCK LOADING
CONTECH MODEL CDS-5-C Date Revision Drawn
PROPOSED ASPHALT
PROPOSED ASPHALT
MOUNTABLE CURB, NO.2 PROPOSED 8" HDPE PIPE II, 04/11/2025 Adjusted text and utility pipes, other adjustments ALG
MOUNTABLE CURB, NO.1 5
130 FT, @3.6% 05/27/2025 Added proposed stromwater system WD
STR-C3
INV IN=59.33 01/20/2026 Town Engineer's Comments WD
INV OUT=54.63
EXISTING WASH PIT 2
EXCAVATED INTO GRADE PROPOSED CATCH BASIN
STR-C4
EXISTING (2)-12"∅-45°
EXISTING RESIDUAL
BEND FITTINGS
CONCRETE DISPOSAL AREA Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
EXISTING POWER P.C. It is a violation of the New York State Education Law for any
EXISTING CONCRETE POLE , TYP. EXISTING PRETREATMENT unauthorized alterations to this document as per Article 145 and 147.
TRUCK WASH OUT AREA STORAGE BASIN NO. 1 EXISTING DRAINAGE STRUCTURE
3,000 GALLON STORAGE SOLID COVER
CAPACITY HYDRODYNAMIC OUTFALL NO. 001
90
STRUCTURE RIM: 57.4
RIM: 57.5 INV IN: 53.4 (E)
INV IN: 54.5 ± INV OUT: 52.5 (N) Project No. 20-1108 Drawn By: WD
INV OUT: 54.5 ±
Date: 03/25/2025 Checked By: PMA
PRETREATMENT
STORAGE NO.1 Sheet 21 of 25
54
RIM: 57.1
INV IN: 56.1 (SE)
DRAINAGE AREA DA-2 EXISTING ASPHALT BERM INV IN: 54.8 ±(W)
D INV OUT: 54.6 ±
0.11 ACRES
EXISTING CHAIN LINK FENCE
CONCRETE TRUCK STAGING AREA
52
PERMANENT ACCESS
SOUTH OF DRAINAGE FLOW AREA
EXISTING HEADWALL
WITH PIPE CULVERT
EASEMENT "B" TRUCK
TURNING AND STAGING
EXISTING PRETREATMENT CONCRETE SWPPP
STORAGE BASIN NO. 2
AREA OF DISTURBANCE 1,000 GALLON STORAGE
0 20'
DRAINAGE PLAN
4.82± ACRES CAPACITY
RIM: 56.7
INV OUT: 55.6 10' 40'
STR-C1
62
64
Page 131
2" x 2" x 36" WOODEN STAKES LEGEND
PLACED 10' O.C.
WORK AREA BLOWN/PLACED FILTREXX SOXX (12" TYPICAL) PROPERTY LINE
FILTER MEDIA OR APPROVED EQUAL
AREA TO BE PROTECTED
DRAINAGE AREA BOUNDARY
STORMWATER FLOW
BUILDING SETBACKS 58 Church Street, Suite 200
Saratoga Springs, New York 12866
Phone: 518.584.8661
12" MINIMUM GRAVEL www.clasite.com
70 MAJOR CONTOURS
EXISTING GROUND
68 MINOR CONTOURS OPERATOR/APPLICANT :
ACK
SILT SOCK SECTION NTS
B
Contact: Jeff Manganello
SET
PROPOSED CONTOUR
Thalle Industries, Inc.
SIDE
18" OVERLAP
MINIMUM PROPOESED STORMWATER PIPE 51 Route 100
Briarcliff Manor, New York 10510
T
20 F
AREA TO BE FILTREXX SOXX (12" TYPICAL) SILT FENCE Phone: 914.762.3415
PROTECTED OR APPROVED EQUAL
2" x 2" x 36" WOODEN STAKES
PLACED 10' O.C. PROPERTY OWNER:
Bilotta Realty of Westchester,
Inc. and Briga Enterprises Inc.
WORK AREA
BLOWN/PLACED PROPOSED DETENTION POND 2099 Albany Post Rd,
FILTER MEDIA
Montrose, NY 10548
SILT SOCK PLAN NTS SEE 1/STR-C3 FOR Phone: 914.737.7891
POND'S CROSS SECTION
NOTES:
1. ALL MATERIAL TO MEET FILTREXX® SPECIFICATIONS, OR APPROVED EQUAL.
2. FILTER MEDIA FILL TO MEET APPLICATION REQUIREMENTS. Phase 2
3. COMPOST MATERIAL TO BE DISPERSED ON SITE, AS DETERMINED BY ENGINEER.
Dakota
1 FILTER SOCK, SILT FENCE OR APPROVED EQUAL
VERTICAL SEDIMENT
DEPTH MARKER Recycling Services
CLEAN OUT ELEVATION =73.17
STR-C2 SCALE: NOT TO SCALE
and
Dakota
EXISTING JERSEY
BARRIER
Concrete Services
2 3 4 PROPOSED 18" DIA. STANDPIPE, RIM=73.40
4.0" DIA. STAGE I ORIFICE=72.92
Town of Cortlandt,
STR-C3 STR-C3 STR-C3
0.6" DIA. LOW FLOW ORIFICE=70.50 Westchester, New York
PROPOSED EMERGENCY SPILLWAY
7 BREADTH=4FT, WIDTH=15 FT Date Revision Drawn
STR-C3 STONE D50=6-8 INCHES
INV=73.80 01/20/2026 Town Engineer's Comments WD
TOP OF BERM 74.50
PROPOSED 8" HDPE PIPE I,
5 61.8 FT, @11.6%
STR-C3 INV IN=66.50
INV OUT=59.33
Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
P.C. It is a violation of the New York State Education Law for any
unauthorized alterations to this document as per Article 145 and 147.
PROPOSED
DIVERSION BERM
Project No. 20-1108 Drawn By: WD
Date: 05/27/2025 Checked By: PMA
1 Sheet 22 of 25
PROPOSED SILT SOCK
STR-C2
CONCRETE DETENTION POND
PROPOSED CONDITIONS
0 5'
10'
STR-C2
Page 132
CORRUGATED 18" METAL RISER,
PROVIDE TRASH RACK
100 YEAR EVENT - 73.71' (#3 REBAR, MAXIMUM 2" SPACING)
INV. 73.40
25 YEAR EVENT - 73.63' SEE POND PLAN AND GRADING PLAN
VERTICAL SEDIMENT DEPTH MARKER FOR POND GRADING 4" ORIFICE, AS PER CALCULATIONS,
10 YEAR EVENT - 73.59' CLEAN OUT ELEVATION =73.17 INV. 72.92'
SEE NOTE 1
1 YEAR EVENT - 73.00' 24"
TOP ELEVATION - 74.50'+ 0.6" LOW FLOW ORIFICE, AS PER
CMP STANDPIPE,
PERMANENT WATER ELEVATION - 70.50'
6.9'
SEE DETAIL 2/STR-C3 WEIR ELEVATION - 73.80' CALCULATIONS, INV. 70.50' 58 Church Street, Suite 200
8" HDPE PIPE, INV. 66.50
74.00 74.00 SEE DETAIL 3/STR-C3 FOR ORIFICE SEE 4/STR-C3 FOR Saratoga Springs, New York 12866
73.00 73.00 PROTECTION DETAILS CMP TO HDPE DETAIL Phone: 518.584.8661
1
72.00 3 72.00 www.clasite.com
71.00 71.00
70.00 SLOPE STABILIZATION 70.00
2'
4' MIN.
1
69.00 2 SEE DETAIL 3/STR-C4 69.00 2 #8 (MIN.) BARS PLACED AT RIGHT
ANGLES AND PROJECTING INTO SIDES
NOTES: OF RISER TO ANCHOR RISER INTO
CONCRETE BASE
1. A FIXED VERTICAL SEDIMENT DEPTH MARKER SHALL BE OPERATOR/APPLICANT :
INSTALLED IN THE FOREBAY TO MEASURE SEDIMENT
DEPOSITION OVER TIME. THE MARKER SHALL BE MADE OF CONCRETE BASE
DURABLE, NON-CORRODING MATERIAL (NOT STEEL). THE BOTTOM ELEVATION 68.50'
2X RISER
*WIRE MESH SCREEN, Contact: Jeff Manganello
(3) ANTI-SEEP COLLARS, TWP INC. #008X008T02
ELEVATION AT WHICH SEDIMENT REMOVAL IS REQUIRED SHALL PROPOSED 8" HDPE PIPE I,
BE MARKED WITH A LINE IN A CONTRASTING COLOR OR SHADE. 61.8 FT, @11.6% 4.3'X4.3' DIAMETER 80W36T OR APPROVED EQUAL Thalle Industries, Inc.
INV IN=66.50
SPACE EVENLY ALONG CULVERT
SEE DETAIL 6/STR-C3
51 Route 100
DETENTION POND CROSS SECTION INV OUT=59.33 2 CMP STANDPIPE DETAIL
1
STR-C3 SCALE: NOT TO SCALE
Briarcliff Manor, New York 10510
STR-C3 SCALE: NOT TO SCALE
Phone: 914.762.3415
6" TOPSOIL, FERTILIZE, PROPERTY OWNER:
℄ LIME, SEED AND MULCH
IN PVMT IN TURF
TRENCH WALLS LAID BACK PER OSHA
REQUIREMENTS OR SHEETING A.O.B.E.
Bilotta Realty of Westchester,
Inc. and Briga Enterprises Inc.
18" CMP STANDPIPE BORROW - WELL GRADED INORGANIC GRANULAR SOILS AND/OR ROCK, MAX.
CMP 1-1/2" SIZE, NOT MORE THAN 20% BY WEIGHT PASSING #200 OR NATIVE 2099 Albany Post Rd,
18" ID RISER 1.5 MATERIAL, A.O.B.E. SIEVE. (USE VIBRATORY COMPACTOR WITH 12" LIFTS)
Montrose, NY 10548
SHEETING LINE
6" CMP PIPE
APPLY MASTIC BETWEEN FERNCO PIPE ZONE BACKFILL - GRADATION SHALL BE: "WELL GRADED SAND WITH 3/4"
ADAPTER AND PIPES FOR WATER
1
MAX. PARTICLE SIZE AND NOT MORE THAN 10% PASSING #200 SIEVE (USE Phone: 914.737.7891
4" DIA.
DRILL ORIFICE TIGHT SEAL VIBRATORY COMPACTOR WITH 8" LIFTS)
STAGE I ORIFICE INVERT VARIES
IN PIPE CAP 24"
6" SECURE WIRE 8" ID HDPE SPRINGLINE PIPE ZONE BEDDING - FOUNDATION STONE TO CONFORM TO COARSE AGGREGATE
MESH SCREEN (SEE NOTE 1)
INVERT VARIES
OVER PIPE OPENING
0.6" DIA. TO PREVENT PASSING
LFO ORIFICE 1/8" SOLIDS WATER FLOW
NOTES: O.D. + 3'
UNDISTURBED SUBGRADE OR EXTRA
FOUNDATION STONE A.O.B.E.
Phase 2
4" MIN.
4" CMP PIPE 1.
2.
FOUNDATION STONE
SIZE DETERMINATION #1: 100% PASSING 1" SIEVE, 90-100% PASSING 1/2" SIEVE, 0-15% PASSING 1/4" SIEVE OR SIZE
Dakota
8" ID CMP
FERNCO ADAPTOR
3.
DETERMINATION #2: 100% PASSING 1-1/2" SIEVE, 90-100% PASSING 1" SIEVE. 0-15% PASSING 1/2" SIEVE
GRADATION/SIZE DESIGNATION TO BE DETERMINED BY ENGINEER BASED ON FIELD CONDITIONS. Recycling Services
5 STORMWATER PIPING TRENCH DETAIL and
3 ORIFICE PROTECTION DETAIL 4 CMP TO HDPE DETAIL STR-C3 SCALE: NOT TO SCALE
STR-C3 SCALE: NOT TO SCALE STR-C3 SCALE: NOT TO SCALE Dakota
Concrete Services
Town of Cortlandt,
Westchester, New York
4.3' EARTHEN BERM - MATERIAL TO BE FREE FROM ROOTS,
STUMPS, WOOD, RUBBISH, FROZEN OR OTHER OBJECTIONABLE
2' MIN. 2' MIN. MATERIAL, AND STONES GREATER THAN 6". FILL MATERIAL Date Revision Drawn
FOR THE CENTER OF THE EMBANKMENT, AND/OR CUT OFF
01/20/2026 Town Engineer's Comments WD
TRENCH SHALL CONFORM TO UNIFIED SOIL CLASSIFICATION
4.3'
GC, SC, CH, OR CL AND MUST HAVE AT LEAST 30% PASSING
THE #200 SIEVE.
DETENTION POND
WEIR WIDTH - 15'-0"
WEIR BREADTH - 4'-0"
4.3' Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
74.50 P.C. It is a violation of the New York State Education Law for any
DRAINAGE
unauthorized alterations to this document as per Article 145 and 147.
0.7'
FLOW
4.3' 73.80
Project No. 20-1108 Drawn By: WD
Date: 09/30/2025 Checked By: PMA
COMPACTED OR UNDISTURBED
SUBGRADE
4.3' RIP RAP OUTLET AND APRON. Sheet 23 of 25
NOTES: SEE CHART FOR SPECIFICATION.
1. ANTI SEEP COLLAR SIZING AND QUANTITY IS BASED ON
NYS STANDARDS AND SPECIFICATION FOR EROSION
4.3' AND SEDIMENT CONTROL, FIGURES 5.16 TO 5.18. WEIR APRON RIP RAP SIZING
2. SEE DETAIL 1/STR-R4 FOR SPACING. DISCHARGE
RIP RAP SIZE BLANKET APRON APRON
STRUCTURE INVERT OUT 100-YR
(d50) THICKNESS LENGTH WIDTH
CFS
POND
73.80 6-8" 9" 8' MIN. 10' MIN. 0.00
WEIR APRON
CONCRETE DETENTION POND
6 ANTI SEEP COLLARS 7 POND WEIR & SPILLWAY DETAILS
STR-C3 SCALE: NOT TO SCALE STR-C3 SCALE: NOT TO SCALE
STR-C3
Page 133
FRAME AND GRATE
SOLID GRATE ASSEMBLY BY ADS, FRAME AND SOLID GRATE SHALL BE
IN LAWN AREA IN CONCRETE ADVANCED DRAINAGE SOLUTIONS,
6" TOPSOIL, FERTILIZE,
OR APPROVED EQUAL.
NEENAH FOUNDARY CO. MODEL NOTES:
LIME, SEED AND MULCH #1578 OR APPROVED EQUAL
1. STRUCTURE BEDDING SHALL BE COMPACTED
FINISHED GRADE SLOPES
NYSDOT #4 CRUSHED STONE MIXTURE 58 Church Street, Suite 200
6.5"
TOWARDS INLET
CONCRETE GRADE RINGS, 4" 2. IF UNSTABLE SOILS ARE ENCOUNTERED AS Saratoga Springs, New York 12866
CEMENT MORTAR MIN. 16" MAX. DETERMINED BY THE ENGINEER, STONE BEDDING
Phone: 518.584.8661
VARIES
FOR THE STRUCTURE SHALL BE REQUIRED A.O.B.E.
www.clasite.com
6"
6"
3. PROVIDE SAFE OPERATION SHEETING IF NEEDED IN
HDPE SMOOTH INTERIOR
48" ACCORDANCE WITH NYSDOT SECTION 552
CORRUGATE POLYETHYLENE
4. STRUCTURE DEPTH VARIES, SEE CATCH BASIN
1.5"
SEE CHART PIPE OR FRENCH DRAIN.
BELOW SEE GRADING PLAN. SCHEDULE
COPOLYMER STEPS PRECAST CONCRETE SLAB
6"
TOP DESIGNED FOR H20
LOADING OPERATOR/APPLICANT :
CATCH BASIN SCHEDULE
SMOOTH INTERIOR Contact: Jeff Manganello
CORRUGATE POLYETHYLENE
Thalle Industries, Inc.
6"
PIPE INVERT SUMP
2" SUMP
CB NUMBER RIM ELEV. INVERT IN INVERT IN 51 Route 100
6" COMPACTED SUBBASE NYLOPLAST DRAIN BASIN OUT DEPTH
NYSDOT TYPE #4 WITH BOTTOM, OR APPROVED SUITABLE COMPACTED BUTYL RUBBER COUPLING
EQUAL BACKFILL PIPE TO CATCH BASIN Briarcliff Manor, New York 10510
CONNECTION 1 58.00 54.43 (w) 54.63 (n) 54.30 (e) 2'-0" Phone: 914.762.3415
6" COMPACTED SUBBASE
6"
COMPACTED SUBGRADE NYSDOT TYPE #4
4' X 4' PRECAST CONCRETE
CATCH BASIN, BY FORT
NOTES:
1. STRUCTURE BEDDING SHALL BE COMPACTED NYSDOT #4 CRUSHED STONE MIXTURE CONFORMING TO SECTION
COMPACTED SUBGRADE MILLER OR APPROVED EQUAL. PROPERTY OWNER:
703-02 OF THE NYS STANDARD SPECIFICATIONS
2. IF UNSTABLE SOILS ARE ENCOUNTERED AS DETERMINED BY THE ENGINEER, STONE BEDDING FOR THE STRUCTURE
SHALL BE REQUIRED A.O.B.E. Bilotta Realty of Westchester,
3. PROVIDE SAFE OPERATION SHEETING IF NEEDED IN ACCORDANCE WITH NYSDOT SECTION 552
4. STRUCTURE DIAMETER AND DEPTH VARIES, SEE DRAINAGE STRUCTURE TABLE. Inc. and Briga Enterprises Inc.
5. PLACE MIRAFI 140N FILTER FABRIC BETWEEN STRUCTURE TOP AND GRATE UNTIL CONTRIBUTING DRAINAGE AREA 2 PROPOSED CATCH BASIN - CONCRETE FACILITY 2099 Albany Post Rd,
IS STABILIZED.
STR-C4 SCALE: NOT TO SCALE
Montrose, NY 10548
Drainage Structure Table Phone: 914.737.7891
Structure Structure
RIM Inlet Pipe Invert In Invert Out Outlet Pipe
ID Size
61.00 18" Dia 8" - 61.8' @ 8" (N) 59.33 8" (S) 59.33 8" - 130' @ 3.6%
11.6% HDPE HDPE
1 DROP INLET / DRAINAGE STRUCTURE
Phase 2
STR-C4 SCALE: NOT TO SCALE
Dakota
Recycling Services
NOTES:
1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY
and
APPLICATION OF LIME, FERTILIZER, AND SEED. APPLY 4" OF TOPSOIL TO ALL
DISTURBED AREAS AND SEED WITH THE FOLLOWING: Dakota
12" COMMON NAME WEIGHT (%)
KENTUCKY BLUEGRASS 65
MIN. PURITY (%)
98
MIN. GERM'N (%)
85
Concrete Services
RED FESCUE 25 98 80
4"-6" 3"
PERENNIAL RYEGRASS 10 98 90
6"
2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" DEEP
BY 6" WIDE TRENCH WITH APPROXIMATELY 12" OF BLANKET EXTENDED Town of Cortlandt,
4 5 BEYOND THE UP-SLOPE PORTION OF THE TRENCH AS SHOWN IN DETAIL 2.
6" 2
ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY Westchester, New York
12" APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE
TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD
REMAINING 12" PORTION OF BLANKET BACK OVER SEED AND COMPACTED
3B SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF
STAPLES/STAKES SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF Date Revision Drawn
THE BLANKET.
3. ROLL THE BLANKETS (A) DOWN OR (B) HORIZONTALLY ACROSS THE SLOPE.
BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL
SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY
3A PLACING STAPLES/STAKES IN APPROPRIATE LOCATION AS PER
MANUFACTURER'S RECOMMENDATIONS.
4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH MINIMUM 6"
OVERLAP. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE
OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE
1
SEAM STITCH ON THE PREVIOUSLY INSTALLED BLANKET.
Copyright 2025 - CLA Site Landscape Architecture, Engineering, & Planning
5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOP MUST BE PLACED END
PROPOSED 8" HDPE PIPE, P.C. It is a violation of the New York State Education Law for any
OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" OVERLAP. STAPLE unauthorized alterations to this document as per Article 145 and 147.
130 FT, @3.6% THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART ACROSS ENTIRE
INV IN=59.33 BLANKET WIDTH.
INV OUT=54.63 6. PLACE STAPLES/STAKES PER MANUFACTURER'S RECOMMENDATION FOR THE
APPROPRIATE SLOPE BEING APPLIED.
7. IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OF STAKE LENGTHS
GREATER THAN 6" MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS.
8. FOLLOW EROSION CONTROL TECHNOLOGY COUNCIL SPECIFICATION FOR Project No. 20-1108 Drawn By: WD
PRODUCT SELECTION.
3 SLOPE STABILIZATION Date: 01/20/2026 Checked By: SEM
STR-C4 SCALE: NOT TO SCALE
Sheet 24 of 25
CONCRETE DETENTION POND
DETAILS
STR-C4
Page 134
ALB
NYA
POS
T R
OAD
ingalls & associates, LLP
engineering, environmental, surveying
116 WEST AVENUE-UNIT 102
SARATOGA SPRINGS, N.Y. 12866
PHONE: (518) 393-7725
FAX: (518) 393-2324
Page 135
Civil Engineers • Land Planners
Project Narrative
Prepared for
Oregon Road Subdivision
Town of Cortlandt Westchester County, NY
This project proposes a 7-lot subdivision for the existing parcels located at 1127 Oregon Road (Lot
24) and 2 Red Mill Road (Lot 25). Both lots are currently undeveloped and zoned CC –
Community Commercial. Lot 24 is 2.04 acres and Lot 25 is 0.44 acres for a total subdivision area
of 2.48 acres. There is an existing curb cut and paved cut through on both lots that connects
Oregon Road and Red Mill Road that serviced previously demolished buildings, which will be
removed. Lot 24 is heavily wooded, while Lot 25 is clear cut. The parcels along the road are flat
and gradually increase in the east direction with areas of Steep Slopes in Lot 24.
In this initial submission to the Planning Board, two concept plans have been provided. Both plans
propose 6 single-family residential lots and 1 muti-use retail space with 2 attached apartments. A
proposed cul-de-sac off Red Mill Road will service the proposed 6 residences. The retail space will
have a separate curb cut on Red Mill Road. All parcels will meet the required yard setbacks,
minimum lot size, and building coverage as set in the zoning code the CC designation. A 60’
wooded buffer is provided along the west property line as required by a deed restriction for 1127
Oregon Road (Lot 24). The two concept plans show two different configurations for the lots that
contain the wooded buffer.
The parking provided will comply with the CC zoning code. 10 spaces have been provided for the
2,600 SF retail space based on a rate of 1 space per 300 SF, including 1 ADA space. 2 parking
spaces are provided per apartment unit, totaling 14 spaces provided in the multi-use lot. 2 spaces
have been provided per single family dwelling. A space has been designated for a trash enclosure
for the retail building.
All proposed buildings will connect to the existing town water and sewer systems in Red Mill
Road and Oregon Road. The new impervious areas will be treated and detained on site with
individual lot treatments and a shared stormwater management practice to account for the cul-de-
sac impacts.
Joseph C. Riina, P.E.
NYS Lic. No. 64431
January 22, 2026
251-F Underhill Avenue • Yorktown Heights, New York 10598
(914) 962-4488 Fax (914) 962-7386
Page 136
Page 137
Page 138
Page 139
COPYRIGHT © 2020 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
SITE DATA:
25-37
OWNER / DEVELOPER: OREGON HOMES INC.
PROJECT #
20 STREET ADDRESS 278 ROUTE 202
2.4 SOMERS, NY 10589
2' PROJECT LOCATION: 2 RED MILL ROAD & 1127 OREGON ROAD
TOWN ZONING: CC
PROPOSED USE: CLASS, DESCRIPTION
TOWN TAX MAP DATA: SECTION13.13, BLOCK 1, LOT 24 & 25
SITE AREA : LOT 24: 2.01 ACRES ( 87,611 SF) & LOT 25: 0.44 ACRES ( 19,253 SF)
SEWAGE FACILITIES: PUBLIC SEWERS
WATER FACILITIES: PUBLIC WATER FACILITIES
10' ZONING SCHEDULE:
251-F Underhill Avenue, Yorktown Heights, NY 10598
"W
SID
E 10'
YA R
SET RD REA
00
BAC LOT 13.13.2 R D ZONING DISTRICT: CC ZONE
S1 K LOT AREA = 8,414 SQ.FT. YA CK
BA
04'
SET
(914) 962-4488 - Fax: (914) 962-7386
°4 DIMENSIONAL REGULATIONS: REQUIRED PROVIDED VARIANCE REQUIRED
Civil Engineers Land Planners
3' 10'
SID
www.sitedesignconsultants.com
30 E MINIMUM SIZE OF LOT:
0°
"W YA
LOCATION MAP SET RD
170
N8
BAC MINIMUM LOT AREA: 7,500 SF. NONE
NOT TO SCALE PRO K PRO
10
SID D
SE
POS PO MINIMUM LOT WIDTH: 60 FT. NONE
YA ACK
S
'
RES ED 2 S RES ED 2 S
TB
E
R
MINIMUM YARD DIMENSIONS:
FF E IDEN
TOR ID TOR
ELE ENC
Y FF
L C E Y
3'
GF
E
E V. 1
7
GF V.
ELE
E 171
PRINCIPAL BUILDING:
6
BF LEV. 1 .75
.4
BF V .7
ELE 66.2 ELE . 161. 5 STAIRS FRONT YARD SETBACK: 30 FT. NONE
V. 1 5 V. 1 25
130
66.7 61.7 REAR YARD SETBACK: 10 FT. NONE
5 5
ONE SIDE YARD SETBACK: 10 FT. NONE
STAIRS
MINIMUM LOT AREA PER DWELLING UNIT 5,000 SF NONE
WALL
MAXIMUM BUILDING COVERAGE: 25% OF LOT AREA NONE
WALL
SET
MINIMUM LANDSCAPE COVERAGE: 30% OF LOT AREA NONE
SIDE
10'
YAR K
MINIMUM BUILDING FLOOR AREA 12,000 SF NONE
BAC
D
MAXIMUM HEIGHT:
' 00" W
16
0
PRINCIPAL BUILDING - FEET: 35 FEET NONE
LOT 13.13.3 LOT 13.13.1
SETBA
PRINCIPAL BUILDING - STORIES: 2 1/2 NONE
REAR
YARD
LOT AREA = 22,355 SQ.FT.
10'
LOT AREA = 8,487 SQ.FT.
41
CK
PARKING SCHEDULE
N7 0 °
Joseph C. Riina, P.E.
NYS Lic. No. 64431
10'
10' REQUIRED PROVIDED
SIDE
TORY
160 SID
E S REQUIRED PARKING SINGLE FAMILY: 2 SPACES PER LOT 12 SPACES
SED 2 E 10'
YARD YAR
O
W
SET D O P
SETBACK PR ENC SIDE
RESID 53.0
BAC RETAIL BUILDING / APARTMENTS:
0"
K
EV. 1 YARD
FF EL 1.0 K 1 SPACES/300 S.F.: 2,600 SF/300 SF PER = 9 SP 13 SPACES
'0
EV. 15 ETBAC
Engineer:
ACK
S
T
GF EL . 151.0
YARD
FRON
30'
0'
EV 1 SPACE PER APT.: 2 APTS @ 2 SP PER = 4 SP
19
9 '
BF EL
S 1 0.00
SETB
100.0
13 SPACES
°
10
PARKING VARIANCE REQUIRED: 0 SPACES
Comments:
SETBA
FRONT
YARD
30'
----
150
320.32'
30
FRO '
CK
N
YAR T
Date
----
Revisions:
SET D
BAC
K
No.
----
' 20" W
11-05-25
DRAWN BY:
F:\2025\25-37 MJM - OREGON CORNERS, CORTLANDT\ENGINEERING\CAD\C3D-25-37 MJM OREGON CORNERS CORTLANDT\DWG\25-37 MJM OREGON RD 01-07-25.DWG 11/8/2025 1:15:04 PM
1" = 20'
SCALE:
DATE:
JCR
TRASH ENCLOSURE
3
N 69° 2
150
30' T
ON
FR RD
YA CK
A
TB
SE
SITE PLAN
OPTION 1
SETBA
FRONT
YARD
30'
CK
SETBA
FRONT
YARD
30'
CK
10'
SIDE LOT 13.13.4
YARD LOT AREA = 19,578 SQ.FT.
RY
SETBACK
PO SE D 2 STO
PROP PRO NCE
OSED
D 2 STORY RESIDE. 150.5 10'
RESID 2 STORY PROPOSE
S 61° 19' 10" E
V
FF ELE REAR
ENCE E V. 150.0
RESIDENC E LE
Westchester County, NY
FF EL 150 G F
EV 54.0 V. 140.5 YARD
GF EL . 156.0 FF ELEV. 1 BF ELE K
SETBAC
2 RED MILL ROAD - 1127 OREGON ROAD
EV. 15 3.5
BF EL 5.5 GF ELEV. 15
OREGON HOMES, INC.
EV. 14
6.0 BF ELEV. 1 44.0
E TA I L 2600 SF
R
2 APTS
10'
PRELIMINARY SITE PLAN
SIDE
YARD
'
3
194.87
K FR 0'
SETBAC ON
Y T
SE ARD
PREPARED FOR
140 LOT 13.13.5 10' LOT 13.13.6 TB
LOT AREA = 7,965 SQ.FT. SIDE
LOT AREA = 8,374 SQ.FT. AC
K
10' YARD
K
SIDE SETBAC
1 Story YARD
10'
Shed SIDE LOT 13.13.7
SETBACK 10'
YARD LOT AREA = 13,226 SQ.FT.
SIDE K
SETBAC
Chain Link Fence YARD
SETBACK
SETBACK
SETBACK
Town of Cortlandt
SETBACK
YARD
YARD
YARD
REAR
REAR
REAR
Stone Wall
10'
10'
10'
0 10 20 40
SCALE: 1"=20'-0"
SAFE DIG
1
NOTE: Before You Dig, Drill or Blast!
Sheet
CALL US TOLL FREE 811 or 1-800-962-7962
1. THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN NY Industrial Code Rule 753 requires no less
of
TAKEN FROM SURVEY MAP PREPARED BY TC MERRITTS LAND SURVEYORS, DATED than two working days notice, but not more
than ten days notice.
10/23/20, LAST REVISED 10/26/20. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS www.digsafelynewyork.com
1
ACCURACY.
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
Page 140
COPYRIGHT © 2020 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
SITE DATA:
25-37
OWNER / DEVELOPER: OREGON HOMES INC.
PROJECT #
20 STREET ADDRESS 278 ROUTE 202
2.4 SOMERS, NY 10589
2' PROJECT LOCATION: 2 RED MILL ROAD & 1127 OREGON ROAD
TOWN ZONING: CC
PROPOSED USE: CLASS, DESCRIPTION
10' TOWN TAX MAP DATA: SECTION13.13, BLOCK 1, LOT 24 & 25
R SITE AREA : LOT 24: 2.01 ACRES ( 87,611 SF) & LOT 25: 0.44 ACRES ( 19,253 SF)
REA
D SEWAGE FACILITIES: PUBLIC SEWERS
YAR CK WATER FACILITIES: PUBLIC WATER FACILITIES
BA
SET
ZONING SCHEDULE:
251-F Underhill Avenue, Yorktown Heights, NY 10598
"W
PR RESI V. 177. .43
00
OP
ZONING DISTRICT: CC ZONE
O DEN 43
S1
FF
04'
GF LEV.
(914) 962-4488 - Fax: (914) 962-7386
SED CE
°4
Civil Engineers Land Planners
DIMENSIONAL REGULATIONS: REQUIRED PROVIDED VARIANCE REQUIRED
BF
ELE V. 175 3
3'
ELE
E
www.sitedesignconsultants.com
30 MINIMUM SIZE OF LOT:
0°
2S
"W
LOCATION MAP
N8
168
TO
NOT TO SCALE
MINIMUM LOT AREA: 7,500 SF. NONE
10
.4
SID D
SE
MINIMUM LOT WIDTH: 60 FT. NONE
RY
YA ACK
'
TB
E
R
MINIMUM YARD DIMENSIONS:
3'
PRINCIPAL BUILDING:
SETBA
SIDE
YARD
10'
.4
FRONT YARD SETBACK: 30 FT. NONE
SETBA
REAR
YARD
130
10'
REAR YARD SETBACK: 10 FT. NONE
CK
LOT 13.13.3
LOT AREA = 22,355 SQ.FT.
ONE SIDE YARD SETBACK: 10 FT. NONE
CK
10' MINIMUM LOT AREA PER DWELLING UNIT 5,000 SF NONE
170
SIDE
SETB
REAR
MAXIMUM BUILDING COVERAGE: 25% OF LOT AREA NONE
YARD
YARD
10'
LOT 13.13.1
CK MINIMUM LANDSCAPE COVERAGE: 30% OF LOT AREA NONE
SETBA LOT AREA = 8,487 SQ.FT.
ACK
MINIMUM BUILDING FLOOR AREA 12,000 SF NONE
LOT 13.13.2
LOT AREA = 8,414 SQ.FT. MAXIMUM HEIGHT:
' 00" W
PRINCIPAL BUILDING - FEET: 35 FEET NONE
PRINCIPAL BUILDING - STORIES: 2 1/2 NONE
10'
PROPOSED 2 STORY
RESIDENCE
1
SIDE
4
FF ELEV. 167.32
YARD
PARKING SCHEDULE
°
GF ELEV. 162.82
0
SETBACK BF ELEV. 158.32
N7
Joseph C. Riina, P.E.
NYS Lic. No. 64431
10'
REQUIRED PROVIDED
SIDE
S TORY REQUIRED PARKING SINGLE FAMILY: 2 SPACES PER LOT 12 SPACES
SED 2 E 10'
YARD
O
W
O P
SETBACK PR ENC SIDE
RESID 53.0
RETAIL BUILDING / APARTMENTS:
0"
EV. 1 YARD
FF EL 1.0 K 1 SPACES/300 S.F.: 2,600 SF/300 SF PER = 9 SP 13 SPACES
'0
EV. 15 ETBAC
Engineer:
GF EL . 151.0 S
0'
EV 1 SPACE PER APT.: 2 APTS @ 2 SP PER = 4 SP
19
9 '
160 BF EL
S 1 0.00
T
FR 0'
100.0
ON
K
SE ARD
3
13 SPACES
AC
°
TB
Y
10
10' PARKING VARIANCE REQUIRED: 0 SPACES
SIDE
Comments:
YARD
CK
SETBA
SETBA
FRONT
YARD
30'
----
150
320.32'
30
FRO '
CK
N
YAR T
Date
----
Revisions:
SET D
BAC
K
No.
----
F:\2025\25-37 MJM - OREGON CORNERS, CORTLANDT\ENGINEERING\CAD\C3D-25-37 MJM OREGON CORNERS CORTLANDT\DWG\25-37 MJM OREGON RD 9-17-25 OPTION 2.DWG 11/8/2025 1:15:04 PM
' 20" W
11-05-25
DRAWN BY:
1" = 20'
SCALE:
DATE:
JCR
TRASH ENCLOSURE
3
N 69° 2
150
30' T
ON
FR RD
YA CK
A
TB
SE
SITE PLAN
OPTION 2
SETBA
FRONT
YARD
30'
CK
SETBA
FRONT
YARD
30'
CK
10'
SIDE LOT 13.13.4
+ 155.50
YARD LOT AREA = 19,578 SQ.FT.
RY
SETBACK
PO SE D 2 STO
PROP PRO NCE
OSED
D 2 STORY RESIDE. 150.5 10'
RESID 2 STORY PROPOSE
S 61° 19' 10" E
V
FF ELE REAR
ENCE E V. 150.0
RESIDENC E LE
Westchester County, NY
FF EL 150 G F
EV 54.0 V. 140.5 YARD
GF EL . 156.0 FF ELEV. 1 BF ELE K
SETBAC
2 RED MILL ROAD - 1127 OREGON ROAD
EV. 15 3.5
BF EL 5.5 GF ELEV. 15
OREGON HOMES, INC.
EV. 14
6.0 BF ELEV. 1 44.0
E TA I L 2600 SF
R
2 APTS
10'
PRELIMINARY SITE PLAN
SIDE
YARD
'
194.87
K
SETBAC
PREPARED FOR
140 LOT 13.13.5 10' LOT 13.13.6
LOT AREA = 8,374 SQ.FT.
LOT AREA = 7,965 SQ.FT. SIDE
10' YARD
K
SETBAC
FR RD K
SIDE
30 NT
1 Story 10'
'
O
SE
YA BAC
YARD LOT 13.13.7
SIDE
T
Shed SETBACK 10' LOT AREA = 13,226 SQ.FT.
YARD
SIDE K
SETBAC
Chain Link Fence YARD
SETBACK
SETBACK
SETBACK
Town of Cortlandt
SETBACK
YARD
YARD
YARD
REAR
REAR
REAR
Stone Wall
10'
10'
10'
0 10 20 40
SCALE: 1"=20'-0"
SAFE DIG
1
NOTE: Before You Dig, Drill or Blast!
Sheet
CALL US TOLL FREE 811 or 1-800-962-7962
1. THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN NY Industrial Code Rule 753 requires no less
of
TAKEN FROM SURVEY MAP PREPARED BY TC MERRITTS LAND SURVEYORS, DATED than two working days notice, but not more
than ten days notice.
10/23/20, LAST REVISED 10/26/20. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS www.digsafelynewyork.com
1
ACCURACY.
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
Page 141
Page 142
Page 143
Page 144
Page 145
Page 146
Page 147
2003 Crompond Road
(TAX LOT: 33.12-2-7, 33.12-2-1)
Town of Cortlandt, New York
Site Plan Application - Parcel 3
January 21, 2026
LOCATION MAP ZONING TABLE LIST OF DRAWINGS
No. Name By Scale Date
COVER SHEET DTSP 01/23/25
SP-1.0 SITE LAYOUT PLAN DTSP 1" = 30' 01/23/25
SP-2.0 SITE GRADING AND DRAINAGE PLAN DTSP 1" = 30' 01/23/25
SP-3.0 SITE UTILITY PLAN DTSP 1" = 30' 01/23/25
SP-4.1 SITE LANDSCAPE PLAN DTSP 1" = 30' 01/23/25
SURVEY TCM 1" = 20' 01/23/25
LEGEND
DTSP DTS PROVIDENT DESIGN ENGINEERING, LLP
TCM DANIEL T. MERRITTS, PLS
BASE MAP SOURCE: WESTCHESTER GIS
OWNER / APPLICANT PLANNER & CIVIL ENGINEER ARCHITECT LAND USE ATTORNEY SURVEYOR
V.S. CONSTRUCTION CORPORATION BEATTY HARVEY COCO ARCHITECTS ZARIN & STEINMETZ DANIEL T. MERRITTS, PLS
37 CROTON DAM ROAD DTS P O DENT u
1300 WALT WHITMAN ROAD 81 MAIN STREET 394 BEDFORD ROAD
ntelligent Land se MELVILLE, NY 11747 WHITE PLAINS, NY 10601 PLEASANTVILLE, NY 10570
OSSINING, NY 10562
DTSProvidentDesignEngineering,LLP
OneNorthBroadway
WhitePlains,NY10601
P:914.428.0010
F:914.428.0017
Page 148
WF 31
WF 4
WF 3 WF 32
WF 33
EVERGREEN MANOR
WF 2
Town of Cortlandt, New York
WF 34
WF 1&36
WF 35
OWNER / APPLICANT
V.S. CONSTRUCTION CORPORATION
37 CROTON DAM ROAD
OSSINING, NY 10562
100' W
ETLAN
PLANNER, CIVIL ENGINEER, LANDSCAPE
D BUFFE
ARCHITECT
DTS P O DENT
R
u
ntelligent Land se
DTS Provident Design Engineering, LLP CA #: 0017846
One North Broadway
White Plains, NY 10601
PROPOSED
MONUMENT
P: 914.428.0010
F: 914.428.0017
ARCHITECT - PARCEL 3
BEATTY HARVEY COCO ARCHITECTS
1300 WALT WHITMAN ROAD
MELVILLE, NY 11747
R-40
LAND USE ATTORNEY
ZARIN & STEINMETZ
81 MAIN STREET
WHITE PLAINS, NY 10601
SURVEYOR
DANIEL T. MERRITTS, PLS
394 BEDFORD ROAD
30' SIDE YARD SETBACK/ PLEASANTVILLE, NY 10570
NONDISTURBANCE AREA
100
WETLAND CONSULTANT
'W
ETL
TIM MILLER ASSOCIATES, INC.
PROPERTY LINE,
AN
TYP. 10 NORTH STREET
DB
COLD SPRING, NY 10516
UFF
ER
MOD
PROPERTY LINE, MONUMENT
(TYP.) PROPOSED
ASPHALT PAVEMENT (TYP.) 30' SIDE YARD SETBACK/
Λ
CONCRETE CURB (TYP.)
Λ
Λ NONDISTURBANCE AREA
ASPHALT WALK
Λ Λ Λ Λ Λ
Λ Λ Λ
Λ
Λ Λ Λ
Λ Λ Λ Λ Λ
Λ Λ Λ
Λ
Λ
PROPERTY LINE
Λ Λ Λ
Λ Λ Λ
Λ Λ Λ
Λ Λ Λ
Λ
Λ Λ Λ Λ Λ
PROPOSED
22.0'
Λ
ELECTRIC VEHICLE
Λ Λ
Λ Λ Λ
Λ
Λ Λ Λ
RETAINING WALL,
Λ
PARKING (TYP. OF 2)
Λ Λ Λ
Λ Λ
Λ
Λ Λ
TYP.
M
Λ Λ
Λ
Λ
O
PRO
Λ
Λ
Λ Λ
Λ
NUM SED
Λ
ACCESS DR
Λ Λ Λ
18.0
Λ Λ Λ Λ Λ
Λ
Λ
IVE
PO
Λ Λ
'
Λ Λ
Λ
Λ Λ Λ Λ
Λ Λ Λ Λ
ENT
Λ Λ Λ Λ
(1,60 OFFICE
CONCRETE
Λ Λ Λ Λ Λ Λ
Λ
Λ Λ Λ Λ
Λ
MOD
Λ Λ Λ Λ
Λ
WALK DUMPSTER
Λ Λ
7
Λ Λ Λ Λ
Λ
Λ Λ
0 SF)
Λ Λ Λ Λ
EV
7.5 '
Λ Λ Λ Λ
ENCLOSURE
'
Λ Λ Λ
69.5
Λ
TYP.
Λ Λ
Λ
Λ Λ
WOODEN GUARDRAIL
Λ Λ
ICAL
Λ
7
Λ Λ
25.0
Λ Λ Λ Λ
Λ Λ Λ
EV
MOUNTABLE CURB
Λ
'
Λ
Λ Λ
Λ Λ Λ
Λ Λ Λ
Λ
PROPOSED 1-STORY BUILDING
Λ
MED
Λ
Λ
Λ Λ Λ
Λ Λ
E
EMERGENCY ACCESS GATE
Λ Λ Λ
Λ
ENU
Λ Λ Λ
EXTEND EXISTING WALL
Λ
Λ
.3 '
Λ
RETAIL (8,000 SF)
Λ Λ Λ
Λ
Λ Λ Λ Λ
WITH NO PARKING SIGN
Λ
Λ
R357
Λ
E AV
Λ Λ
BOTH SIDES
Λ
Λ Λ
4FT HEIGHT FENCE FLAGGED WETLAND BOUNDARY,
Λ Λ
Λ
Λ Λ Λ
Λ Λ Λ Λ
Λ
TYP. 18.0
Λ
STABILIZED TURF THE STATE OF NEW YORK REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY
YETT
Λ
Λ
Λ
Λ
Λ
Λ
Λ
Λ ' Λ
Λ PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE.
1-800-962-7962 OR 811
Λ
Λ Λ
Λ
LAFA
Λ
Λ
8.0 '
Λ
Λ
Λ
Λ
Λ
Λ
25.0
'
Λ
Λ
X
7.5 '
Λ
TYP.
Λ
R10.0 '
5
0'
Λ
25'
Λ
Λ
Λ
Λ
X
18.
Λ Λ
Λ
Λ
Λ
Λ Λ PAVEMENT 9.0 '
X
Λ
Λ
'
STRIPING (TYP.)
20.0
Λ
Λ
Λ
Λ
43 SPACES
Λ
Λ
NOTE: ALL SITE DESIGN CONCEPTS AND INFORMATION INDICATED OR REPRESENTED
Λ
BY THIS DRAWING ARE OWNED BY AND ARE THE PROPERTY OF DTS PROVIDENT
Λ
DESIGN ENGINEERING, LLP. THIS DRAWING WAS CREATED AND DEVELOPED FOR USE
Λ
0'
Λ
ON, AND IN CONNECTION WITH, THE SPECIFIED PROJECT INDICATED HEREON AND
Λ
0. SHALL NOT BE USED BY OR DISCLOSED TO ANY PERSON OR ENTITY WHATSOEVER
R1
Λ
WITHOUT THE WRITTEN PERMISSION OF DTS PROVIDENT DESIGN ENGINEERING, LLP.
Λ
Λ
OPEN SPACE 100' WETLAND
Λ
Λ
MOUNTABLE CURB WRITTEN DIMENSIONS ON THIS DRAWING SHALL HAVE PRECEDENCE OVER SCALED
Λ
BUFFER, TYP. MOD MEASUREMENTS. CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL
Λ
Λ
DIMENSIONS AND CONDITIONS ON THE JOB AND THIS OFFICE MUST BE NOTIFIED OF
EMERGENCY ACCESS
Λ
ANY VARIATIONS FROM DIMENSIONS AND CONDITIONS
Λ
SHOWN BY THESE DRAWINGS.
Λ
(STABILIZED TURF)
Λ
Λ
LEGAL NOTICE: IT IS A VIOLATION OF ARTICLE 145 OF THE NEW
Λ
YORK STATE EDUCATION LAW FOR ANY PERSON TO ALTER THIS
Λ
Λ
DOCUMENT IN ANY WAY EXCEPT AS PROVIDED IN SECTION
Λ
7209 (2), ARTICLE 145, NEW YORK STATE EDUCATION LAW.
Λ
Λ
Λ
Λ
Λ
30' FRONT YARD SETBACK Copyright DTS Provident Design Engineering, LLP 2025
Λ
All rights reserved.
Λ
Λ
NOT FOR CONSTRUCTION
Λ
30' SIDE YARD SETBACK
Λ
Λ
Λ
Λ
Λ
01/21/2026 SITE PLAN APPLICATION
Λ
1
Λ
Λ
Λ
Λ
Λ
Λ
Λ
Λ
Λ 4
Λ 1
Λ
Λ
Λ
Λ
Λ
Λ
Λ
Λ
MOD
PR UM
MO
Λ
OP EN
N
OS T
Λ
ED
Λ
AD
Λ
D RO
ON 02
MP E 35/2
Λ
O
CR OUT
Λ
R
PARCEL 3 -
Λ
Λ
SITE LAYOUT PLAN
Λ
Λ
Λ
Λ
Λ
Λ
Λ
Λ
Λ
Λ
Λ
Λ
Λ
Λ
Λ
CONKLIN
AVENUE
SP-1.0
EXPIRES 7/31/26
Page 149
S
WF 31
WF 4
NEW FIRE HYDRANT
AND FUTURE WATER
MAIN EXTENSION, TYP.
8" DIP, CL 54
(CAP END)
WF 3 WF 32 EVERGREEN MANOR
WF 33
Town of Cortlandt, New York
WF 2
FUTURE SANITARY SEWER
MAIN EXTENSION, TYP.
8" DIP, SDR-35
WF 34 (CAP END)
MATCHLINE (SEE SHEET SP-2.1) MATCHLINE (SEE SHEET SP-2.1)
WF 1&36
FUTURE
MAIN SANITARYWF 35
SEWER OWNER / APPLICANT
EXTENSION
V.S. CONSTRUCTION CORPORATION
37 CROTON DAM ROAD
OSSINING, NY 10562
100' W
NEW 8"
GATE VALVE, TYP. PLANNER, CIVIL ENGINEER, LANDSCAPE
ETLAN
S ARCHITECT
DTS P O DENT
D BUF
u
ntelligent Land se
FER
DTS Provident Design Engineering, LLP CA #: 0017846
One North Broadway
White Plains, NY 10601
P: 914.428.0010
F: 914.428.0017
PROPOSED
MONUMENT
ARCHITECT - PARCEL 3
BEATTY HARVEY COCO ARCHITECTS
1300 WALT WHITMAN ROAD
MELVILLE, NY 11747
1+00 1+55 LAND USE ATTORNEY
ZARIN & STEINMETZ
81 MAIN STREET
WHITE PLAINS, NY 10601
FUTURE WATER MAIN
EXTENSION SURVEYOR
FUTURE SANITARY SEWER DANIEL T. MERRITTS, PLS
S
MAIN EXTENSION 394 BEDFORD ROAD
L
PLEASANTVILLE, NY 10570
AF
30' SIDE YARD SETBACK/ WETLAND CONSULTANT
A
NONDISTURBANCE AREA
TIM MILLER ASSOCIATES, INC.
Y
100
10 NORTH STREET
'
E
WE
COLD SPRING, NY 10516
0
TL
0+0
TT
PROPERTY LINE,
AN
TYP.
DB
E
UFF
R-40
ER
VE A
N
PROPERTY LINE,
U
MONUMENT
(TYP.) PROPOSED
E
386 30' SIDE YARD SETBACK/
Λ
Λ
Λ
TW 384.0 NONDISTURBANCE AREA
BW 371.8
Λ Λ Λ Λ Λ
Λ Λ Λ
Λ
Λ Λ Λ
Λ Λ Λ Λ Λ
Λ Λ Λ Λ
Λ
Λ
RW-BEND
Λ Λ Λ
Λ Λ Λ
TW 380.7
Λ Λ Λ
Λ
Λ
TW 382.5
Λ Λ
Λ
Λ
384
Λ Λ Λ
BW 366.0
Λ Λ Λ
RW-BEND S Λ Λ
BW 368.5
Λ
Λ Λ
Λ
Λ Λ Λ
382
Λ Λ Λ
TW 382.5 Λ
Λ Λ
380
Λ
Λ
Λ Λ
M
Λ
BW 370.0
Λ Λ
Λ
O
PRO
Λ
Λ
Λ
TW 390.0
Λ
Λ Λ
NUM SED
Λ Λ Λ
372
Λ Λ
382 Λ Λ Λ Λ
Λ
BW 374.0
Λ
PO
Λ Λ Λ Λ
Λ
Λ
Λ Λ Λ Λ
Λ Λ Λ
ENT
Λ Λ Λ Λ
Λ Λ Λ Λ Λ
Λ
Λ Λ
Λ
Λ Λ Λ Λ
Λ Λ Λ
370
Λ
7
Λ Λ Λ
Λ
Λ Λ Λ
Λ
Λ
Λ Λ Λ
Λ Λ Λ
N2
Λ
Λ
Λ
373
Λ Λ Λ
Λ
7 Λ
Λ
Λ Λ
9° 0
Λ Λ
Λ
Λ Λ Λ Λ
Λ Λ
Λ
Λ
TW 380.0 Λ
6' 1
Λ
Λ
UPo
Λ
NUE
TW 374.6
Λ Λ
BW 370.0
Λ
5 9" E
Λ
371
Λ
Λ
Λ
THE STATE OF NEW YORK REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY
Λ Λ
BW 363.0
le
Λ Λ
PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE.
AVE
34.
374
Λ
Λ
Λ
Λ
1-800-962-7962 OR 811
Λ
TW 370.5 Λ Λ
6
Λ
Λ Λ
3 5'
E
Λ Λ
BW 364.3
YETT
Λ
Λ
Λ
Λ Λ
Λ
TW 375.0
Λ
Λ
TW 370.5
Λ
Λ
BW 373.0
LAFA
Λ
Λ
Λ
Λ
BW 369.4
Sto
Λ
TW 372.0
Λ
Λ
Λ
n
5 BW 368.5
Λ
eW
Λ
370
X
369
Λ
5
Λ
5
37
4
a
Λ
.81
X
37
ll
372
3
0
37
37 2
Λ
+37
37
X
Λ
373
1
1
NOTE: ALL SITE DESIGN CONCEPTS AND INFORMATION INDICATED OR REPRESENTED
BY THIS DRAWING ARE OWNED BY AND ARE THE PROPERTY OF DTS PROVIDENT
Λ
375
0
DESIGN ENGINEERING, LLP. THIS DRAWING WAS CREATED AND DEVELOPED FOR USE
37
Λ
ON, AND IN CONNECTION WITH, THE SPECIFIED PROJECT INDICATED HEREON AND
8
6
S
36
SHALL NOT BE USED BY OR DISCLOSED TO ANY PERSON OR ENTITY WHATSOEVER
Λ
36
WITHOUT THE WRITTEN PERMISSION OF DTS PROVIDENT DESIGN ENGINEERING, LLP.
Λ
374
WRITTEN DIMENSIONS ON THIS DRAWING SHALL HAVE PRECEDENCE OVER SCALED
Λ
MEASUREMENTS. CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL
TW 370.0 TW 373.0 DIMENSIONS AND CONDITIONS ON THE JOB AND THIS OFFICE MUST BE NOTIFIED OF
Λ
Ston
BW 366.0 BW 366.0 ANY VARIATIONS FROM DIMENSIONS AND CONDITIONS
100' WETLAND
Λ
SHOWN BY THESE DRAWINGS.
BUFFER, TYP.
e
8.0'
364
Λ
LEGAL NOTICE: IT IS A VIOLATION OF ARTICLE 145 OF THE NEW
Wa
Stone
YORK STATE EDUCATION LAW FOR ANY PERSON TO ALTER THIS
Λ
ll
DOCUMENT IN ANY WAY EXCEPT AS PROVIDED IN SECTION
UPo
7209 (2), ARTICLE 145, NEW YORK STATE EDUCATION LAW.
Λ
Wire
Wall
le
Guy
Λ
onc C
Copyright DTS Provident Design Engineering, LLP 2025
Λ
All rights reserved.
Pad
rete
Λ
TW 367.0 NOT FOR CONSTRUCTION
BW 366.0 30' FRONT YARD SETBACK
MOD
323.99'
WF
S ENERGY 30' SIDE YARD SETBACK
DISSAPATOR, TYP.
UPo S 76° 13' 31" E 1 01/21/2026 SITE PLAN APPLICATION
C4
le
UPole
UPole
+(355.9) TC
S 77
WF
(355.4)
TC +
20.0
WE
Post
Ligh
TLA UPole UPole
C3
DB N
OU +(354.9
UPo
'
t
E
UPo
4
Sign raffic
UPo
U
3"
ND ) TC
UPo
Pole
1
A
'4
° 37 64.77'
RY
42
le
le
Wire
le
al B
8°
T
le
Guy
N7
INV.B=346.83
WF
ox
+(35 INV.A=346.83
Pole l
' 03
W
Sign
4.4) RIM=350.53
Traf
TC
100.00' BUFF
ER 18"RCP
C2
a
te DRAIN INLET
UPo
a
fic
r
UPo
le
e l
"W
+(35
A
3.7)
B
TC
'
.67
Wire 18"RCP
Co
3
UPole
25
UPole
Traf l Lid
Guy
Met
Con
urs
Ston
Traf l Lid
Wire
Aspha
fic S
e
Met
PR UM
MO
a
cret
UPole
eW
Guy
W
fic S
OP EN
igna
a
N
0
Sign
e Pa
0+0
F C1
lt D
OS T
all
igna
(35
2.7
l Bo
S )T UPole
ED
rive
d
C+
Be
Ston
l
x
Box
eM Signal Box
aso
gin
INV UP o nry Traffic
20" =348.7
AD
le R
MOD
eta
: 0+
RO
RC 0 inin
Traf
D
PARCEL 3 -
S P gW
02
Wire
ON
all Con
MP E 35/2
00.
S c. C UPole
fic S
Guy
Wire
Guy
O
urb
CR OUT
352
Traf
UPole
00
SITE GRADING AND
.5+
HOSPIT
ign
R
fic S
EXIT
al B
RIM=353.63
PI:
DRAINAGE PLAN
RIM=348.04
ign
DRAIN INLET
o
MANHOLE (CON-ED)
x
UPo
AL
al P
0+6
RIM=347.41
00
le
ole
Wire
4
Guy
MANHOLE (CON-ED)
1+
.62
RIM
S DR =352 Traffic Signal Pole
AIN .1
INL 1
NU PI ET
M
DEE BER :1
+0
30.0
D 4
STA CO 91320 7.
THE T E N
OF TRO 394 32 R
AIN IM=3
DR
'
L MA 52.6
LAN PEOP NEW NH 6
DS LE O YOR OL
AC K E
QU F THE RIM
IRE =
DB MA 353.0
0 Y
2+0
NH 8
OL
SP-2.0
E
PI:
Tra
ffic
1+8
Sto
CONKLIN
AVENUE
Sig
nal
ne
UPo THE DEED Tra Pol
6.3
l ffic e
EXPIRES 7/31/26
e PEO CO Sig
PLE NTR nal
8
Wall
OF O Box
THE L NUM
ST A BER
TE O 4
F N 91320
EW 4
Y O 41
Page 150
WF 31
WF 4
NEW FIRE HYDRANT
AND FUTURE WATER
MAIN EXTENSION, TYP.
8" DIP, CL 54
(CAP END)
WF 3 WF 32
WF 33
WF 2
EVERGREEN MANOR
Town of Cortlandt, New York
FUTURE SANITARY SEWER
MAIN EXTENSION, TYP.
1 8" DIP, SDR-35
WF 34 (CAP END)
WF 1&36
FUTURE
MAIN SANITARYWF 35
SEWER
EXTENSION
OWNER / APPLICANT
V.S. CONSTRUCTION CORPORATION
37 CROTON DAM ROAD
NEW 8" OSSINING, NY 10562
GATE VALVE, TYP.
PLANNER, CIVIL ENGINEER, LANDSCAPE
ARCHITECT
DTS P O DENT u
ntelligent Land se
DTS Provident Design Engineering, LLP CA #: 0017846
One North Broadway
White Plains, NY 10601
P: 914.428.0010
F: 914.428.0017
ARCHITECT - PARCEL 3
BEATTY HARVEY COCO ARCHITECTS
1300 WALT WHITMAN ROAD
MELVILLE, NY 11747
LAND USE ATTORNEY
FUTURE WATER MAIN ZARIN & STEINMETZ
EXTENSION 81 MAIN STREET
WHITE PLAINS, NY 10601
FUTURE SANITARY SEWER
MAIN EXTENSION
LA
SURVEYOR
DANIEL T. MERRITTS, PLS
FAY
30' SIDE YARD SETBACK/ 394 BEDFORD ROAD
NONDISTURBANCE AREA PLEASANTVILLE, NY 10570
NEW 8"
GATE VALVE, TYP.
WETLAND CONSULTANT
E T
PROPERTY LINE, TIM MILLER ASSOCIATES, INC.
TE
TYP. 10 NORTH STREET
R-40 COLD SPRING, NY 10516
VE A
N
PROPERTY LINE,
U
(TYP.) 10'-0" MIN.
E
SEPARATION,
TYP. 30' SIDE YARD SETBACK/
NONDISTURBANCE AREA
Λ Λ Λ
Λ Λ Λ Λ
Λ Λ Λ Λ Λ
Λ Λ Λ
Λ
Λ Λ Λ
Λ Λ Λ Λ Λ
Λ Λ Λ
Λ
Λ
Λ Λ Λ
Λ Λ Λ
Λ Λ Λ
Λ Λ Λ
Λ
Λ Λ Λ Λ Λ
Λ Λ Λ
Λ Λ Λ
Λ
Λ Λ Λ
Λ Λ Λ
Λ Λ
Λ
Λ
Λ Λ
Λ Λ
Λ
Λ Λ
Λ
Λ Λ
Λ Λ
Λ Λ Λ Λ
Λ Λ Λ Λ
Λ
Λ Λ Λ
Λ Λ
Λ
Λ Λ Λ Λ
Λ Λ Λ
Λ Λ Λ Λ
NEW SMH-R2
Λ Λ Λ Λ Λ
Λ
Λ Λ Λ Λ
Λ Λ Λ
Λ Λ Λ
Λ Λ Λ
RIM. 175.15
Λ
Λ Λ Λ
Λ Λ Λ Λ Λ
20'-0" WIDE Λ Λ Λ
Λ
Λ Λ Λ
Λ Λ Λ Λ
WATER MAIN EASEMENT
Λ Λ Λ
Λ
Λ Λ Λ Λ
Λ Λ
PROPOSED
Λ
Λ
Λ
Λ
UPo
Λ
PROPOSED
NUE
Λ Λ
4" DIP, CL54 FIRE LATERAL
Λ Λ
Λ
Λ
6" DIP SANITARY
Λ Λ
3" DIP, CL54 DOM. LATERAL
le
Λ Λ
AVE
NEW WATER MAIN
Λ
Λ Λ
Λ
SEWER LATERAL
(SIZE TO BE CONFIRMED
Λ Λ
(8" DIP, CL 54)
Λ
Λ Λ
(6" D.I.P., CL52) S=0.02 MIN.
E
Λ Λ
BY MEP)
YETT
Λ
Λ
Λ
Λ Λ
THE STATE OF NEW YORK REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY
PROPOSED
Λ
Λ
Λ
NEW Λ
Λ PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE.
LAFA
Λ 1-800-962-7962 OR 811
6" DIP WATERMAIN NEW SMH-R1
Λ
FIRE HYDRANT
Λ
Λ
St
Λ
RIM. 363.84
Λ
one
Λ
Λ
Λ
Λ
NEW 8"
X
W
Λ
GATE VALVE, TYP.
Λ
all
Λ
X
Λ
X
CONNECT NEW 8"
Λ
WATER MAIN TO
Λ
EXISTING WATER MAIN
Λ
W/ NEW 8"x8"x8" TEE
Λ
NOTE: ALL SITE DESIGN CONCEPTS AND INFORMATION INDICATED OR REPRESENTED
Λ
BY THIS DRAWING ARE OWNED BY AND ARE THE PROPERTY OF DTS PROVIDENT
DESIGN ENGINEERING, LLP. THIS DRAWING WAS CREATED AND DEVELOPED FOR USE
Λ
ON, AND IN CONNECTION WITH, THE SPECIFIED PROJECT INDICATED HEREON AND
SHALL NOT BE USED BY OR DISCLOSED TO ANY PERSON OR ENTITY WHATSOEVER
Λ
Ston
WITHOUT THE WRITTEN PERMISSION OF DTS PROVIDENT DESIGN ENGINEERING, LLP.
Λ
8" S
eW
WRITTEN DIMENSIONS ON THIS DRAWING SHALL HAVE PRECEDENCE OVER SCALED
Λ
MEASUREMENTS. CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL
e
all
DIMENSIONS AND CONDITIONS ON THE JOB AND THIS OFFICE MUST BE NOTIFIED OF
Λ
w
UPo
RELOCATED ANY VARIATIONS FROM DIMENSIONS AND CONDITIONS
CONNECT
er P
Λ
Wire SHOWN BY THESE DRAWINGS.
8"CI
TO EXIST 8" DIP UTILITY POLE - LOCATION
le
Guy
Λ
LEGAL NOTICE: IT IS A VIOLATION OF ARTICLE 145 OF THE NEW
C
ipe
WATERMAIN STUB TO BE VERIFIED W/ UTILITY CO. YORK STATE EDUCATION LAW FOR ANY PERSON TO ALTER THIS
o
P
PER
n
Λ
DOCUMENT IN ANY WAY EXCEPT AS PROVIDED IN SECTION
c
O AP
Pad
PRO LD S
rete
7209 (2), ARTICLE 145, NEW YORK STATE EDUCATION LAW.
Λ
XIM URV
ATE EY - RIM=359.78
SEW NO 30' FRONT YARD SETBACK
MOD
ER T FO SEWER MANHOLE
MA U Copyright DTS Provident Design Engineering, LLP 2025
NH ND All rights reserved.
OL
E
NOT FOR CONSTRUCTION
WF
RIM=356.16
ENERGY UPo 30' SIDE YARD SETBACK SEWER MANHOLE
DISSAPATOR, TYP.
C4
le
UPole
Pipe
ipe
8" Sewer P UPole 8" Sewer
WF
1 01/21/2026 SITE PLAN APPLICATION
WE
Post
Ligh
TLA UPole UPole
C3
ND
BOU
UPo
t
UPo
Sign raffic
UPo
ND
UPo
ARY
le
le
Wire
le
al B
T
le
Guy INV.B=346.83
WF
ox
INV.A=346.83
Pole l
W
Sign
RIM=350.53
Traf
18"RCP
C2
a
te DRAIN INLET
UPo
a
fic
r 16"CIP
UPo
le
le
A
B
N
Wire 8"HP GAS MAI 18"RCP
Co
UPole UPole 16"CIP
Traf l Lid
Guy
Met
C
urs
o
Traf l Lid
Wire
Aspha
f
e
n
Met
ic
16"CIP
a
cret
Guy UPole
Sign
W
fic S
a
0
Sign
e Pa
8"CIP
0+0
F C1
lt Drive
al B
igna
16"CIP
UPole 8"CIP
d
ox
Be
Ston
lB
eM Signal Box
ox
aso
gin
INV UPo nry Traffic
20" =348.7
AD
le R
MOD
eta 8"CIP
: 0+
RO
RC 0 inin
Traf
D
P gW
02
Wire
ON
all Con
MP E 35/2
00.
8"CIP c. C UPole
fic S
Guy
Wire
Guy
O
urb
CR OUT
16"
Traf
UPole
00
C
HOSPIT
igna
IP
R
ic Si f
EXIT
RIM=353.63
l Bo
PI:
DRAIN INLET RIM=348.04
gna
PROPOSED 6" DIP SANITARY MANHOLE (CON-ED)
PARCEL 3 -
x
UPo
AL
0+6
l Po 2
SEWER CONNECTION 8"C PER OLD SURVEY - NOT FOUND RIM=347.41
00
le
Wire
SITE UTILITY PLAN
IP
4le.6
Guy
INV. OUT: 366.5 APPROXIMATE SEWER MANHOLE MANHOLE (CON-ED)
1+
RIM
Me DR =352 Traffic Signal Pole
ter AIN .1
Wa Pit INL 1
NU te r PI ET
M
DEE BER :1
D 4
STA CO 91320 +0
7.
THE T E N
OF TRO 394
L 32 R
AIN IM=3
DR
MA 52.6
DS
RELOCATE
LAN PEOP NEW
LE O Y O R NH 6
OL
FIRE HYDRANT
AC
QU F THE
K
RIM
E
IRE =
DB MA 353.0
0 Y
2+0
NH 8
OL
SEW RIM E
ER =
MA 353.1
PI:
Tra NH 8
8"C ffic OL
1+8
Sto
CONKLIN
AVENUE 8" PIPE
E
16"PIPE
IP Sig
nal
ne
SP-3.0
UPo THE DEED Tra Pol
6.3
le ffic e
PEO CO Sig
PLE NTR
8
nal
Wall
OF O Box
RIM THE L NUM
STA BER
DR =355. LAN TE OF 4913
AIN 65
INL
ET Stre
DS N
AC EW Y 0441
2
EXPIRES 7/31/26
CR gn
et S
i
QU
IRE
OR
DB K
OM Y
PO
Page 151
•
CONCEPT PLANT SCHEDULE
•
WF 31
•
•
WF 4
•
•
NEW FIRE HYDRANT
•
SHADE TREES 3" - 3.5" CAL. 13
•
AND FUTURE WATER
•
•
MAIN EXTENSION, TYP. ACER RUBRUM `OCTOBER GLORY` - `OCTOBER GLORY` RED MAPLE
•
•
8" DIP, CL 54 LIQUIDAMBAR STYRACIFLUA `ROTUNDILOBA` - `ROTUNDILOBA` SWEETGUM
•
•
•
(CAP END) LIRIODENDRON TULIPIFERA - TULIP POPLAR
•
QUERCUS SPP. - OAK SPECIES
WF 3 WF 32
•
TILIA AMERICANA - BASSWOOD
•
WF 33 ULMUS AMERICANA `NEW HARMONY` - `NEW HARMONY` AMERICAN ELM
EVERGREEN MANOR
•
•
•
WF 2
Town of Cortlandt, New York
•
ORNAMENTAL TREES 6` - 8` HGT. 15
•
•
AMELANCHIER X GRANDIFLORA - APPLE SERVICEBERRY
W
BETULA NIGRA `BNMTF` - `DURA HEAT` RIVER BIRCH
FUTURE SANITARY SEWER
CERCIS CANADENSIS - EASTERN RED BUD
W
MAIN EXTENSION, TYP.
CORNUS FLORIDA `CHEROKEE BRAVE` - CHEROKEE BRAVE DOGWOOD
1 8" DIP, SDR-35
WF 34 W
W
W
W
(CAP END)
W
W
W EVERGREEN TREES 6` - 8` HGT. 39
WF 1&36 W ILEX OPACA - AMERICAN HOLLY
W
FUTURE JUNIPERUS VIRGINIANA - EASTERN RED CEDAR
MAIN SANITARYWF 35
SEWER PICEA GLAUCA - WHITE SPRUCE
W
EXTENSION PICEA PUNGENS - BLUE SPRUCE
OWNER / APPLICANT
W
V.S. CONSTRUCTION CORPORATION
37 CROTON DAM ROAD
NATIVE SLOPE STABLIZATION SHRUBS 24" - 36", 4` O.C. 3,406 sf
W
OSSINING, NY 10562
100' W
NEW 8" ARONIA ARBUTIFOLIA `BRILLIANTISSIMA` - `BRILLIANT RED` CHOKEBERRY
GATE VALVE, TYP. CORNUS SPP. - DOGWOOD SPECIES
W
ETLAN
ILEX GLABRA SPP - INKBERRY HOLLY
MYRICA PENSYLVANICA - NORTHERN BAYBERRY PLANNER, CIVIL ENGINEER, LANDSCAPE
D BUF
RHUS AROMATICA `GRO-LOW` - GRO-LOW FRAGRANT SUMAC
W
VIBURNUM DENTATUM - ARROWWOOD VIBURNUM
ARCHITECT
FER
DTS P O DENT u
W
ntelligent Land se
W
DTS Provident Design Engineering, LLP CA #: 0017846
One North Broadway
NATIVE RESTORATION SEED MIX 10,635 sf White Plains, NY 10601
W WOODLAND RESTORATION AREA SEED MIX
ERNMX-132-1 "RIGHT OF WAY NATIVE WOODS MIX WITH ANNUAL RYEGRASS" BY P: 914.428.0010
F: 914.428.0017
ERNST CONSERVATION SEEDS (800) 873-3321 OR APPROVED EQUAL.
W
INCLUDES THE FOLLOWING:
ANNUAL RYEGRASS, DEERTONGUE, SWITCHGRASS, VIRGINIA WILD RYE ARCHITECT - PARCEL 3
W
BEATTY HARVEY COCO ARCHITECTS
SEEDING RATE: 30 LBS/ACRE
SEED AND MAINTAIN PER SEED SUPPLIER`S SPECIFICATIONS.
1300 WALT WHITMAN ROAD
MELVILLE, NY 11747
W
APPLICATION METHOD: HYDROSEED WITH MULCH TACKIFIER.
W W W
LAND USE ATTORNEY
W
LAWN 8,066 sf ZARIN & STEINMETZ
FUTURE WATER MAIN
W
81 MAIN STREET
W W W
LAWN SEED MIX - SUN/SHADE
W
EXTENSION
HARDSCRABBLE "ALL PURPOSE SUN/SHADE MIX" AS SUPPLIED BY WHITE PLAINS, NY 10601
HARDSCRABBLE FARMS, INC. (914) 669-5633 OR APPROVED EQUAL. CONTAINS
FUTURE SANITARY SEWER
W
THE FOLLOWING:
MAIN EXTENSION
30% SOPRANO PERENNIAL RYE,
SURVEYOR
30% INTEGRA PERENNIAL RYE, DANIEL T. MERRITTS, PLS
W
30% REBEL IV TALL FESCUE, 394 BEDFORD ROAD
10% PALOUSE KENTUCKY BLUEGRASS
PLEASANTVILLE, NY 10570
W
SEEDING RATE: 6 LBS/1,000 SF.
100
WETLAND CONSULTANT
'W
W
ETL
TIM MILLER ASSOCIATES, INC.
AN
10 NORTH STREET
DB
W
COLD SPRING, NY 10516
UFF
R-40
ER
W
W
EXISTING TREE LINE
TO REMAIN
W
PR
W
W
UTIL SED 20'
386
O
W
P
W Λ
W
O
IT
Λ Λ Λ
Λ Λ
Y
Λ
NATIVE SLOPE
W Λ Λ
W
Λ Λ
Λ
Λ
E
Λ Λ Λ
ASE IDE
Λ
STABILIZATION
W Λ Λ Λ
Λ Λ Λ Λ
Λ
Λ
Λ Λ
W Λ
PLANTING
Λ Λ
MEN
Λ
LIMIT OF DISTURBANCE,
Λ Λ Λ
Λ
W
W Λ Λ Λ
Λ
Λ
W
384
Λ Λ Λ
Λ
(TYP.)
W Λ Λ Λ
T
W Λ
Λ
Λ Λ
Λ
W Λ Λ Λ
W Λ Λ Λ
W Λ
Λ Λ
W
Λ
Λ
W Λ Λ
Λ
W
W Λ Λ
W Λ Λ
W
Λ
Λ
Λ
W Λ Λ
Λ Λ W Λ Λ
Λ
382 Λ Λ W Λ Λ
Λ
Λ Λ W Λ
Λ Λ
Tax rty Lin
Prop
Λ
Λ
Λ Λ W Λ Λ
W
Λ Λ
STREET TREE, (TYP.)
Λ Λ W Λ Λ
Λ Λ
are
Λ Λ Λ Λ
Λ
Λ Λ
Λ
Λ Λ Λ Λ
Λ W
L
Λ Λ Λ
e
Λ
o
Λ Λ
Λ
Λ Λ W Λ
Λ
t 7 a es Betw
Λ
W
not d Tax L en
Λ Λ Λ
Λ Λ Λ
Λ
Λ
Λ Λ Λ
W Λ
Λ Λ
Λ
Λ Λ Λ W Λ
C
Λ
Λ
n
Λ Λ Λ
MULCHED
W
Λ
o
Λ
0.00
W
Λ
20.0
Λ
Λ
Λ Λ
n
UPo
Λ
E
ISLAND
Λ W Λ
tigu t 8
STABILIZED TURF
ENU
Λ Λ
Λ
Λ
0'
Λ
: 0+0
Λ Λ
(TYP.)
W
W
le
Λ Λ
Λ
Λ
ous
Λ
Λ
E AV
W
o
Λ
e
Λ Λ
Begin
Λ
Λ W Λ
74.96
Λ Λ
THE STATE OF NEW YORK REQUIRES NOTIFICATION BY EXCAVATORS, DESIGNERS, OR ANY
YETT
W
Λ
Λ
Λ
CONCRETE
W
PERSON PREPARING TO DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE.
Λ Λ
1+0 Λ
0 W 1-800-962-7962 OR 811
Λ
Λ
SIDEWALK
PI: 0+
Λ
Λ
LAFA
W Λ
Λ
Λ
W
Λ
S
Λ
ton
W
Λ
Λ
Λ
W
Λ
e
MULCHED
Λ
W
X
W
Wa
Λ
ISLAND
Λ
W
ORNAMENTAL TREE (TYP.)
Λ
X
W W
(TYP.)
ll
W
W
W
W
Λ
W
0+
00
W
X
Λ
W
385.26 TC W
W
W
W
Λ
384.76 BC W
W
Λ
W
0
385.66 TC
W
1+0
W W
NOTE: ALL SITE DESIGN CONCEPTS AND INFORMATION INDICATED OR REPRESENTED
Λ
W
385.16 BC W W BY THIS DRAWING ARE OWNED BY AND ARE THE PROPERTY OF DTS PROVIDENT
Λ
DESIGN ENGINEERING, LLP. THIS DRAWING WAS CREATED AND DEVELOPED FOR USE
W
W
ON, AND IN CONNECTION WITH, THE SPECIFIED PROJECT INDICATED HEREON AND
Λ
SHALL NOT BE USED BY OR DISCLOSED TO ANY PERSON OR ENTITY WHATSOEVER
W
W
WITHOUT THE WRITTEN PERMISSION OF DTS PROVIDENT DESIGN ENGINEERING, LLP.
Λ
W
Ston
Λ
WRITTEN DIMENSIONS ON THIS DRAWING SHALL HAVE PRECEDENCE OVER SCALED
W
eW
MEASUREMENTS. CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR ALL
LAWN
Λ
DIMENSIONS AND CONDITIONS ON THE JOB AND THIS OFFICE MUST BE NOTIFIED OF
Stone
all
EVERGREEN ANY VARIATIONS FROM DIMENSIONS AND CONDITIONS
Λ
SHOWN BY THESE DRAWINGS.
UPo
TREE (TYP.)
W
Λ
LEGAL NOTICE: IT IS A VIOLATION OF ARTICLE 145 OF THE NEW
Wall
le
YORK STATE EDUCATION LAW FOR ANY PERSON TO ALTER THIS
Λ
C
DOCUMENT IN ANY WAY EXCEPT AS PROVIDED IN SECTION
onc
Λ
7209 (2), ARTICLE 145, NEW YORK STATE EDUCATION LAW.
W
Pad
rete
Λ
EXISTING TREE LINE
TO REMAIN Copyright DTS Provident Design Engineering, LLP 2025
MOD
W
SHADE TREE (TYP.) NATIVE WOODLAND All rights reserved.
RESTORATION MIX NOT FOR CONSTRUCTION
W
UPo
le
W
UPole
0
2+0
UPole
1 01/21/2026 SITE PLAN APPLICATION
W
Post
Ligh
UPole
PI: 2 UPole
+05
.9
UPo
t
UPo
7
UPo
U
UPo
Pole
9
W
le
.0
le
+33
le
le
PI: 2
W
ER
100.00' BUFF
UPo
UPo
le
ENTRY ROAD le
W
UPole UPole
.39
W
Con
Ston
+ 75
I: 2
Aspha
P
cret
UPole
Walle
0
Sign
e Pa
0+0
W
lt D
UPole
rive
d
Be
Ston
eM
aso
W
gin
UPo nry
AD
le Ret
MOD
3+0
: 0+
RO
inin a
D 02
gW
ON
Con
0
all
MP E 35/2
00.
c. UPole
W
Cu
O
CR OUT
rb UPole
00
R
W
PARCEL 3 -
PI:
UPo
6.82
0+6
3+3
SITE LANDSCAPE PLAN
W
:
00
le
3+3
4
1+
.62
7
W
PI
:1
+0
W
7.
32
W
PI:
1+8
Sto
CONKLIN
AVENUE
SP-4.1
ne
6.3
8
Wall
EXPIRES 7/31/26
Page 152