Saturday, November 14, 2026Cortlandt, New YorkWeatherSearch
cortlandt.news
Local news · Reporting produced with AI
← Meeting & documents
Official certified transcript

2026-06-02 · Planning Board

Imported from the Town’s original PDF. Speakers follow the printed labels. Citations use PDF pages rather than video timestamps.

Original certified PDF ↗ · Archived original ↓

Page 1 Original page ↗

       TOWN OF CORTLANDT

  PLANNING AND ZONING BOARDS




         BOARD MEETING




           Town Hall

        1 Heady Street

Cortlandt Manor, New York 10567

         June 2, 2026

     6:30 p.m. - 8:30 p.m.

Page 2 Original page ↗

                                                             Page 2
June 2, 2026

MEMBERS PRESENT:


     Steven Kessler, Chairman

     Thomas A. Bianchi, Vice Chairman

     Nora Hildinger, Member

     Kevin Kobasa, Member

     Peter McKinley, Member

     Jeff Rothfeder, Member

     Kellan Cantrell, Member



ALSO PRESENT:


     Chris Kehoe, AICP, Director of Planning

     Michael Cunningham, Esq., Deputy Town Attorney (Zoom)

     Heather LaVarnway, CNU-A, Planner

     Catherine Brosnan, P.E., Assistant Civil Engineer




                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 3 Original page ↗

                                                             Page 3
1    June 2, 2026
 2   (The board meeting commenced at 6:30 p.m.

 3             MR. STEVEN KESSLER:           Good. Welcome to

 4   the June 2nd planning board meeting. Please rise

 5   if you’re able to for the pledge.

 6             MULTIPLE:       I pledge allegiance to the

 7   flag of the United States of America and to the

 8   republic for which it stands, one nation under

 9   God, indivisible with liberty and justice for

10   all.

11             MR. KESSLER:        Thank you. Roll, please.

12             MR. CHRIS KEHOE:          Mr. Kubasa?

13             MR. KEVIN KOBASA:           Here.

14             MR. KEHOE:       Ms. Hildinger?

15             MS. NORA HILDINGER:           Here.

16             MR. KEHOE:       Mr. Rothfeder?

17             MR. JEFF ROTHFEDER:           Here.

18             MR. KEHOE:       Mr. Kessler?

19             MR. KESSLER:        Here.

20             MR. KEHOE:       Mr. Bianchi?

21             MR. THOMAS BIANCHI:           Here.

22             MR. KEHOE:       Ms. Timko?

23             MS. KAREN TIMKO:          Here.

24             MR. KEHOE:       Mr. McKinley?




                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 4 Original page ↗

                                                            Page 4
1    June 2, 2026

 2            MR. PETER MCKINLEY:           Here.

 3            MR. KESSLER:        Thank you. Just in terms

 4   of the agenda this evening, I just want to note

 5   that there are, the first two public hearings are

 6   going to be adjourned at the request of the

 7   applicant, and that concerns the Alvarez

 8   Specialty Trade Electrical Contractor yard and

 9   the VS Construction’s application for the

10   assisted living facility. And we have one

11   addition to the agenda, which we’ll add to under

12   correspondence B, and that is a referral from the

13   town regarding a zoning omnibus regulation.

14            And one more addition to the agenda this

15   evening, and as many of you know, Chris Kehoe’s

16   last meeting is tonight, as in 10 days he’ll be

17   retiring as the director of planning after 30-

18   plus years with this town and the last 15-plus

19   years as the director of planning. I think it’s

20   fair to say that Chris has been an integral part

21   of everything that’s happened up here on this

22   board in these past 10 years when you look at the

23   things that we’ve dealt with that Chris has been

24   part of, ranging from the town center and the



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 5 Original page ↗

                                                            Page 5
1    June 2, 2026

 2   expansion of town center, the hospital expansion,

 3   the golf course, Valeria. We also get to blame

 4   him for all the gas stations in the town.

 5            But also behind the scenes, what he does

 6   in terms of working with the town on the master

 7   plan committee, on the medical-oriented district,

 8   which of course is on the agenda this evening,

 9   and the transit-oriented district, I mean it’s

10   quite a resume of the things that he’s worked on

11   over these 30-plus years.

12            But I also don’t think people appreciate

13   what goes on behind the scenes. Chris has to

14   juggle a lot of things. It reminds me of the old

15   Ed Sullivan Show with the guy with the plates

16   spinning in the air, dealing with the applicants,

17   their attorneys, their lawyers, their

18   consultants, their engineers, their architects.

19   That’s just one phase of this. It’s really like a

20   five-legged stool.

21            And then you have the town departments

22   that he has to navigate between legal and the

23   supervisor’s office and Department of Technical

24   Services and our outside consultants and the



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 6 Original page ↗

                                                            Page 6
1    June 2, 2026

 2   Conservation Advisory Committee, the

 3   Architectural Review Committee, our own

 4   consultants that we bring in, the arborists, and

 5   others.

 6             And of course, then there’s the county

 7   and the state departments that you have to deal

 8   with, DOH and DEC and others, and of course, most

 9   importantly, the public.

10             I think it’s fair to say, though, that

11   what Chris does is very even-handed. He treats

12   everybody with dignity and respect and is very

13   generous with his time in everything that he’s

14   dealt with. And I don’t think people appreciate,

15   many of you are here before us quite often, but

16   there are many people in this town who are here

17   for the first time, and Chris really has to

18   handhold them and walk them through the process,

19   manage their expectations, small businesses, nail

20   salons, you name it. All those little things that

21   make this town what it is today.

22             So, the work for the board, the work for

23   the town, and just how generous he is with his

24   time with everybody is just truly something to



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 7 Original page ↗

                                                            Page 7
1     June 2, 2026

 2   behold.

3              And on a personal note, Chris, I always

4    appreciated your advice, your counsel, your

5    insight, and for, more importantly, occasionally

6    making me look like I know what I’m doing up

7    here, and I think that’s critically important. So

8    on behalf of the board and me, Chris, I just want

 9   to thank you for your dedication to the town and

10   the residents. It’s not often that people get to

11   retire knowing they’ve made an impact on

12   something, but I think it’s very clear, Chris,

13   that you certainly made an impact on the town,

14   and we all thank you for that, and I hope you

15   have a long, healthy, and personally fulfilling

16   retirement. So thank you for everything that

17   you’ve done.

18             MR. KEHOE:      Thank you.

19             (APPLAUSE)

20             MR. KESSLER:       I think we have one other

21   addition to the agenda. Mr. Steinmetz?

22             MR. DAVID STEINMETZ:            Sorry, Chris.

23   You’re not getting rid of me so quickly. Chris,

24   for more than 30 years, you’ve had to listen to



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 8 Original page ↗

                                                            Page 8
1    June 2, 2026

 2   me, my clients, and our various development teams

 3   through a number of different applications and

 4   multiple iterations of this board. From John Felt

 5   to Ken Verschoor, to you as the director of

 6   planning, you have done this truly, as Steve sort

 7   of said, gracefully, with a smile, occasional

 8   wit, and for the Cortlandt community, a sincerity

 9   of concern that was always self-evident.

10            I’m here a lot, as we both know, so I

11   have dealt with you on a more regular, frequent

12   basis, literally over decades, than I have in

13   many other communities. You’ve consistently been

14   a pleasure to deal with personally and

15   professionally. You’ve always been a true public

16   servant, Chris. Someone who’s there playing an

17   important role in government, who understands

18   that your job is to serve the public, and

19   sometimes that means competing interests. Again,

20   Steve implied, I know you’ve had people nipping

21   at your heels from different directions, and you

22   always seem to do this, Chris, in a real even-

23   handed, calm, and a pleasant way, and that’s not

24   an easy thing.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 9 Original page ↗

                                                            Page 9
1    June 2, 2026

 2            You’re unquestionably going to be missed

 3   by all of us who deal with you and have dealt

 4   with you regularly. But speaking for myself and

 5   some of my colleagues and members of my teams, we

 6   take great solace in knowing that you’ve had the

 7   opportunity, literally, to sit beside Heather,

 8   and model for her and others in your department

 9   what it means to take on the leadership that you

10   have done.

11            So Chris, on a less serious note,

12   obviously I’ve always known that you were a

13   hockey fan. I don’t understand how you’ve spent

14   your entire professional career in the penalty

15   box. Having said that, Chris, I wish you freedom

16   from the penalty box, freedom from town hall from

17   time to time. I hope you will still give all of

18   us your friendship and your wisdom and your

19   professionalism, and I wanted to make sure,

20   because I can’t be there tomorrow night, Chris, I

21   wanted to wish you only the best, and

22   congratulations to you on your retirement.

23            (APPLAUSE)

24            MR. KESSLER:        One more addition to the



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 10 Original page ↗

                                                            Page 10
1    June 2, 2026

 2   agenda, Mr. Schwartz.

 3            MR. BRAD SCHWARTZ:           And I’ll be brief.

 4   But Chris, I obviously echo everything that David

 5   said, except for the 30-year part. But what’s

 6   wild is I’ve been up here now 23 years. And I

 7   learned land use coming before this planning

 8   board and doing work in this town, and you were

 9   instrumental in that. I will forever be grateful

10   to you. It was also very meaningful to get to

11   know you personally on the ice. And while David

12   says you’ve been in the penalty box your entire

13   professional career, in my book, you have the

14   highest hockey IQ of anyone that I’ve ever skated

15   with. So you’ve never been in a penalty box in

16   real life.

17            And I heard a rumor that in honor of you

18   last night, everyone here tonight is getting

19   approval. Is that right?

20            MR. KEHOE:       Yes. Check marks for

21   everyone. Chris, congrats and good luck.

22            MR. KESSLER:        Thank you.

23            (APPLAUSE)

24            MR. KESSLER:        Okay. Let’s move on to the



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 11 Original page ↗

                                                            Page 11
1     June 2, 2026

 2   agenda. Okay. Okay with you, Chris?

 3               MR. KEHOE:     Yep.

4                MR. KESSLER:     So the first item tonight

5    under correspondence, a letter dated May 15, 2026

6    from Martin Petrovic, and May 19, 2026, a letter

7    from Brian Minto, the Hollowbrook Golf

8    superintendent, requesting approval for a new

 9   chemical at the Holbrook Golf Course. We have a

10   resolution prepared. I think the consultants that

11   we deal with have approved the use of this, so I

12   think it’s pretty perfunctory here that we set

13   this as an approval. So Jeff?

14               MR. ROTHFEDER:        I move that we approve

15   resolution 11-26.

16               MR. KESSLER:     Second, please.

17               MS. HILDINGER:        Second.

18               MR. KESSLER:     And on the question. All

19   in favor?

20               MULTIPLE:    Aye.

21               MR. KESSLER:     Opposed? Thanks. The next

22   item is the addition to the agenda, which is the

23   referral from the town board regarding the zoning

24   omnibus ordinance. Can I have a motion, please?



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 12 Original page ↗

                                                              Page 12
1     June 2, 2026

 2               MR. ROTHFEDER:        I move that, what, we

 3   have received this?

 4               MR. KESSLER:       Yeah.

 5               MR. ROTHFEDER:        That we’ve received

 6   this.

 7               MR. KESSLER:       Okay. A motion to receive

 8   a file, so we’ll review this for the next

 9   meeting?

10               MR. KEHOE:      Yeah, and I think what

11   you’ve done in the past, you can send us emails.

12               MR. KESSLER:       Okay.

13               MR. KEHOE:      We can discuss it again.

14   Heather can discuss it again at the next meeting.

15   But if you have anything between now and then,

16   just send emails along.

17               MR. KESSLER:       Okay. There’s something we

18   received tonight in our mail, so we’ll go through

19   that. So we have a motion. Second, please?

20               MR. BIANCHI:       Second.

21               MR. KESSLER:       And on the question. All

22   in favor?

23               MULTIPLE:      Aye.

24               MR. KESSLER:       Opposed? Okay. Thank you.



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 13 Original page ↗

                                                            Page 13
1    June 2, 2026

 2   All right. Moving on, our first public hearing of

 3   the evening is the application of 70 Roa Hook

 4   Road Realty, LLC, for site development plan

 5   approval to redevelop the site of the partially

 6   constructed Crystal Clean Carwash facility to a

 7   proposed vehicle showroom and service facility

 8   for property located at 70 Roa Hook Road,

 9   drawings revised March 25, 2026, except sheet two

10   of seven, which was revised on May 21, 2026. Good

11   evening, Brad.

12            MR. SCHWARTZ:         Good evening, Mr.

13   Chairman, board members, and staff, so just for

14   the record, Brad Schwartz from Zarin and

15   Steinmetz on behalf of the applicant. We have our

16   full team here tonight, John Gilchrist, project

17   engineer, John Canning, traffic consultant. And

18   we’ll get right into our presentation.

19            MR. JOHN GILCHRIST:           Good evening. Okay,

20   just a quick rehash. We have the former car wash

21   that was constructed nearly complete and then

22   abandoned. We are reusing this building as a

23   truck service facility, repairing trucks up to 30

24   feet, not longer. The building will be increased



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 14 Original page ↗

                                                            Page 14
1    June 2, 2026

 2   with an addition to the southwest and a little

 3   bit more to the north corner to make the building

 4   big enough to accommodate the trucks. The ceiling

 5   height of the car wash is not sufficient for what

 6   we need to do, so we’re putting up a new building

 7   to replace part of the car wash to accommodate

 8   the higher ceilings and the bigger trucks.

 9            The property is about two-thirds of an

10   acre. It was, again, formerly developed with

11   accommodations for vehicles to move around the

12   building and through the building in the car

13   wash. We are going to change the circulation

14   through the site to have one-way in and one-way

15   out driveways, so that the circulation will be

16   around the back of the building and then back out

17   to Roa Hook Road.

18            My drawing of -- I should say, the

19   amount of impervious coverage does not change. We

20   have more building, but less paving. The

21   stormwater collection system doesn’t change. We

22   have a series of pipes that runs around the

23   perimeter of the property and then discharges

24   under the Roa Hook Road to Annesville Creek.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 15 Original page ↗

                                                            Page 15
1     June 2, 2026

 2            The change, the small changes I made to

 3   the site plan since our last meeting, one is to

 4   reconfigure the exit driveway. There is a

 5   pollution control device. After this whole

 6   stormwater collection system exits the property,

 7   I called it a oil water separator, but it’s

 8   really a pretty sophisticated device. It uses a

 9   helix collector to get the stormwater to swirl

10   and separate out the solids and the floatables

11   and collect that, and also to separate out any

12   oil that might be on the parking lot. So, I have

13   that water quality device.

14            And then the other thing, so we

15   reconfigured the driveway to preserve that, so I

16   won’t have to move it. And then after that and

17   before the river, we’ve introduced a seepage pit

18   that will allow a certain amount of flow to

19   percolate back into the ground.

20            We did speak to the Department of

21   Environmental Protection, DEC, Conservation. They

22   say due to the fact that we’re under an acre of

23   property, they’re not involved, and they were not

24   involved in our car wash project. The water



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 16 Original page ↗

                                                            Page 16
1    June 2, 2026

 2   quality device was installed at the request of

 3   the town of Cortlandt. We also have applied for a

 4   multi-sector general permit, no exposure

 5   certification, which is part of the SPDES

 6   application, and we anticipate that’ll be

 7   approved shortly.

 8            MR. KESSLER:        And that’s from whom?

 9            MR. GILCHRIST:         From Environmental

10   Protection, Department of Environmental

11   Protection. And basically, that says that all

12   activities will be within the building, all

13   industrial practices will be indoors and nothing

14   will occur outside.

15            We are, in addition to the seepage pit,

16   we are proposing solar collectors on the roof.

17   Not determined how many or exactly what the

18   function is. We are discussing retaining parts of

19   our water recycling. We have water recycling from

20   the car wash that the intent was to reuse the

21   wash water. This water is, we don’t have a

22   particular use for it, but we think we can reuse

23   it as irrigation water for our plantings. And the

24   other one is, we will provide a electric car



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 17 Original page ↗

                                                              Page 17
1    June 2, 2026

 2   charging station.

 3              MR. KESSLER:        Okay.

 4              MR. GILCHRIST:         That’s about what I

 5   have.

 6              MR. KESSLER:        Okay. I brought it up at

 7   the work session, but in the upper left-hand

 8   corner, I think on your map, you call it a

 9   chambers something that we saw on the site visit.

10   Did we figure out what that was?

11              MR. GILCHRIST:         I didn’t figure out what

12   that is, I’m sorry. Let me see if I can see it on

13   here. I know it’s on the survey.

14              MR. KESSLER:        It was sort of in the, let

15   me get the, southwest corner of the building.

16              MR. GILCHRIST:         Right. I’m sorry, I

17   don’t know what they are. There’s an aeration

18   system for the septic system, and that’s not

19   installed. That may be part of that. I have to

20   put a air pump in, I know that’s not in. And no,

21   I don’t know. And I’m going to reach out to Steve

22   Auth, who installed those, and try to find out

23   what they are.

24              MR. KESSLER:        Okay. I appreciate it. All



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 18 Original page ↗

                                                                 Page 18
1    June 2, 2026

 2   right.

 3               MR. ROTHFEDER:         I was just going to say,

 4   so the oil water separator that you have on your

 5   current drawing, is that the same one that you

 6   had?

 7               MR. GILCHRIST:         That exists today, yes.

 8               MR. ROTHFEDER:         Okay. But the seepage

 9   pit is new?

10               MR. GILCHRIST:         Is new, proposed, yeah.

11               MR. ROTHFEDER:         Uh-huh. And so again,

12   what are we waiting for in terms of approval for

13   that, Cathy, Catherine?

14               MS. KATHERINE BROSNAN:             So we were

15   looking for a letter of no objection from the DEC

16   per a phone conversation, and it sounds like

17   you’ve obtained that in email form. Is that

18   correct?

19               MR. GILCHRIST:         Yes.

20               MS. BROSNAN:        Can you forward that?

21               MR. GILCHRIST:         Yeah, I sent it to you

22   this afternoon. It was probably late.

23               MS. BROSNAN:        Oh, this afternoon? Okay,

24   no problem.



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 19 Original page ↗

                                                            Page 19
1     June 2, 2026

 2            MR. KESSLER:        So that should close out

 3   that issue?

 4            MS. BROSNAN:        Yes. I mean, I haven’t

 5   read it yet, but yes.

 6            MR. KESSLER:        Okay.

 7            MR. ROTHFEDER:         Okay, and then just one

 8   other thing. So, I appreciate the photovoltaic

 9   system. Thank you. But you say provisions, I’m

10   assuming that means you’re going to do it, not

11   just providing for it.

12            MR. GILCHRIST:         Yeah. We haven’t studied

13   it at this point. We’ll study it in the next, in

14   the architectural phase of the project.

15            MR. ROTHFEDER:         Okay.

16            MR. GILCHRIST:         And see what makes the

17   most sense.

18            MR. ROTHFEDER:         Okay, thank you.

19            MR. KEHOE:       But I think what we would do

20   though is we would condition the approval upon

21   that. And if it didn’t work out because financing

22   or the roof, they’d have to come back, I would

23   think, because it’s important enough to you.

24            MR. GILCHRIST: Sure, yes, exactly.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 20 Original page ↗

                                                            Page 20
1     June 2, 2026

 2               MR. KEHOE:     So it’d be required, but if

 3   it doesn’t happen, you would have to come back to

 4   the board and explain why. Okay.

 5               MR. KESSLER:     Okay. Before you open it

 6   up to the public, anybody else on the board have

 7   any comments?

 8               MR. MCKINLEY:      I’m good.

 9               MR. KESSLER:     So if not, anybody here

10   that wishes to comment on this application? No?

11   Oh, okay.

12               MR. SCHWARTZ:      Would you like to hear

13   from Mr. Canning on traffic, or is the board good

14   on traffic?

15               MR. KESSLER:     We had the, when we were

16   on the site, we had the trucks make the rounds

17   multiple times around the building. Everything

18   seemed to be fine. Is there anything that we

19   missed, John?

20               MR. JOHN CANNING:       Just for the record,

21   Mr. Chairman, John Canning, with Kimbley-Horn.

22   Good to see everybody, and good luck, Chris. So

23   you know it’s a built site. You know it was

24   studied extensively for a car wash. We provided a



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 21 Original page ↗

                                                            Page 21
1    June 2, 2026

 2   letter that indicated that the truck service

 3   facility is a much lower traffic generator,

 4   almost 75 percent lower. It’ll be 15 trips in the

 5   peak hour, actually 14, which is one trip every

 6   five minutes. We’re not changing anything on the

 7   site other than we’re separating the driveway, so

 8   it’s an in and an out. We’re going to retain the

 9   previously required peak hour turn restrictions,

10   so we’re not changing that. The previous

11   application was determined not to have a

12   significant traffic impact, so with 75 percent

13   less traffic, this will not have a significant

14   traffic impact. So I just wanted to put that on

15   the record.

16               MR. KESSLER:     I appreciate it.

17               MR. CANNING:     And thank you.

18               MR. KESSLER:     Thank you, John. Again,

19   last call, anybody else wish to comment on this

20   application?

21               MR. BIANCHI:     And the signage will be as

22   proposed?

23               MR. CANNING:     Yes.

24               MR. BIANCHI:     For turns.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 22 Original page ↗

                                                              Page 22
1     June 2, 2026

 2            MR. CANNING:        Yes.

 3            MR. BIANCHI:        Yeah.

 4            MR. KESSLER:        Okay, so if there’s no

 5   other comments, then Peter?

 6            MR. MCKINLEY:         Mr. Chairman, I’d like to

 7   make a motion to close the public hearing, PB-

 8   2025-18, and refer back to staff for further

 9   development.

10            MR. KESSLER:        Do we prepare a

11   resolution? And prepare a resolution?

12            MR. MCKINLEY:         And prepare a resolution.

13            MR. KESSLER:        Okay. Second, please.

14            MR. BIANCHI:        Second.

15            MR. KESSLER:        And on the question?

16            MR. ROTHFEDER:         Do we have to extend the

17   --

18            MR. KESSLER:        Well --

19            MR. KEHOE:       No, no.

20            MR. MICHAEL CUNNINGHAM:             If you’re

21   closing tonight --

22            MR. KESSLER:        If we’ve got the DEC stuff

23   and it’s satisfactory --

24            MR. KEHOE:       Well, if something goes



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 23 Original page ↗

                                                            Page 23
1     June 2, 2026

 2   wrong --

 3              MR. KESSLER:      -- if not, we won’t vote

 4   on it next time.

 5              MR. ROTHFEDER:        Okay.

 6              MR. CUNNINGHAM:        If there’s a problem,

 7   we can ask the applicants to extend the shot

 8   clock later. But it seems like there aren’t many

 9   issues that are preventing a resolution.

10              MR. KESSLER:      Okay, fine. So we’re on

11   the question, all in favor?

12              MULTIPLE:     Aye.

13              MR. KESSLER:      Opposed.

14              MR. SCHWARTZ:        Good night. Thank you.

15   Thank you. Thank you. All right, next item, a

16   second public hearing. It’s the application of

17   New York Presbyterian Hudson Valley Hospital

18   Center for an amended site plan approval for a

19   proposed 1,877 square foot addition to the

20   existing medical office building for a linear

21   accelerator, for property located at 1980

22   Crompond Road, drawings dated March 12, 2026.

23   Good evening.

24              MS. KATHERINE ZALANTIS:           Good evening.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 24 Original page ↗

                                                            Page 24
1    June 2, 2026

 2   Katherine Zalantis of Silverberg Zalantis LLC on

 3   behalf of the applicant, New York Presbyterian

 4   Hudson Valley Hospital. So the hospital is here,

 5   as you said, Mr. Chairman, in connection with

 6   site plan approval, or to obtain site plan

 7   approval to construct a small 1,877 square foot

 8   addition. And the addition will be to the

 9   existing building in the center of the campus.

10   The addition will house a more advanced linear

11   accelerator or a LINAC system used to treat

12   cancer patients. The hospital currently has a

13   LINAC system, but it’s at its end of life, and it

14   wants to replace this existing LINAC system with

15   a more technologically advanced LINAC system.

16            As the hospital regional medical

17   director will better explain, while both LINAC

18   systems treat cancer patients, the new

19   replacement LINAC system again, is more

20   technologically advanced and provides a broader

21   range of care to the hospital’s patients.

22            From a planning perspective, and the

23   only reason that we’re before this board is that

24   the new system, the new LINAC system, can’t fit



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 25 Original page ↗

                                                               Page 25
1    June 2, 2026

 2   in the existing room that currently houses the

 3   current LINAC system. But like the current LINAC

 4   system, the new LINAC will only continue to treat

 5   one patient at a time. So once the new LINAC

 6   system is installed, the existing LINAC system

 7   will be rendered inoperable and removed, and that

 8   space will be converted into storage. So there

 9   will not be two LINAC systems in use at the same

10   time. To be clear, it’s a straight one-for-one

11   replacement.

12               Also, as part of this project, and if we

13   can go to the next slide, please, one more. So

14   you could see the proposed work area includes a

15   parking area where the hospital’s proposing to

16   restripe the parking to avoid a loss of

17   potentially three or four spaces, and as a

18   result, there will only be a loss of one parking

19   space.

20               The existing LINAC building’s roof on

21   top of the LINAC has a green roof, and for the

22   proposed addition, it will continue to have a

23   green roof, so the green roof will be extended

24   from one area to the new area addition.



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 26 Original page ↗

                                                            Page 26
1    June 2, 2026

 2            And I’d like to at this time to

 3   introduce Dr. Lawrence Koutcher, the Regional

 4   Director of Clinical Operations, Department of

 5   Radiation Oncology, to better explain why having

 6   this equipment is both a benefit to the community

 7   and to the hospital and its patients.

 8            DR. LAWRENCE KOUTCHER:             Good evening.

 9   Thank you for having us here tonight. My name is

10   Lawrence Koutcher. I’m a radiation oncologist.

11   I’ve been at Hudson Valley Hospital since 2014,

12   and I want to talk about briefly the benefits of

13   having a new linear accelerator would provide the

14   community. So our field is a very technologically

15   driven field, and we’ve had this machine since we

16   opened in the end of approximately 2011.

17            As you can imagine, a lot of advances

18   have happened over those years. And just to

19   highlight a few of them, these advances help us

20   deliver better patient care. Again, just to

21   highlight a few of them, the new linear

22   accelerator has a very sophisticated way of

23   setting up a patient in the exact same position

24   every day, which is what we always strive to do.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 27 Original page ↗

                                                            Page 27
1    June 2, 2026

 2   We simulate and plan a patient in a certain

 3   position, and we want to reproduce that every day

 4   the exact same way. It has what’s called a six-

 5   degree couch, so we can use six dimensions to

 6   line them up in the same exact position. And now

 7   we don’t have that six-degree couch that would

 8   line everyone, that line the patient up exactly,

 9   more precisely.

10            The type of imaging that we use, we use

11   a CT scan before each patient is treated to make

12   sure they line up in the exact same position. The

13   CT scan that goes with this new linear

14   accelerator is basically a sharper, crisper image

15   that would allow us to better delineate exactly

16   how to set them up.

17            Also, the current machine doesn’t have

18   certain modalities. One of them is called

19   electrons, which basically allows us to treat

20   very superficial lesions. So currently when I see

21   patients, they are not -- a patient who needs

22   that kind of treatment is not able to get their

23   care here. So, we’re trying to create, really, a

24   state-of-the-art center so that patients can get



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 28 Original page ↗

                                                            Page 28
1    June 2, 2026

 2   all their care at New York-Presbyterian Hudson

 3   Valley Hospital and not have to leave the

 4   community.

 5            And then just a final reason, as I

 6   believe the board knows, but just to make sure

 7   everyone’s on the same page, the NYP Hudson

 8   Valley is part of the NYP system. So we have

 9   really three facilities in the Columbia sphere,

10   as we call it, one at 168th, one here, and one in

11   Bronxville at NYP Westchester. The other two

12   locations have this. And again, we always want

13   uniformity throughout the whole system for more

14   seamless patient care. So, by having that, that

15   would also help us in that regard.

16            MR. KESSLER:        Totally irrelevant, but

17   who makes this equipment?

18            DR. KOUTCHER:         So Siemens is the Siemens

19   dominant manufacturer for this. The tomotherapy

20   that we have now is made by Accuray.

21            MR. KESSLER:        By whom?

22            DR. KOUTCHER:         Accuray.

23            MR. KESSLER:        Okay. It’s a public

24   hearing, but before we get to that, any questions



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 29 Original page ↗

                                                            Page 29
1    June 2, 2026

 2   from the board? Anybody from the audience wish to

 3   comment on this application at this time? No.

 4   Just, you’re reconstructing the building. Is

 5   there anything special you have to do in that

 6   construction just in terms of safeguarding, you

 7   know, radiation or anything?

 8              DR. KOUTCHER:       Yeah, absolutely. I mean

 9   anytime we have a linear accelerator, there’s

10   always very significant shielding to make sure

11   that it’s safe. And so, different machines,

12   they’re slightly different. They all have their

13   own shielding requirements, and so we have, you

14   know, obviously when this would be built, it

15   would be built in a way that would be, of course,

16   safe for the public, that it would be shielded, a

17   physics team would test it, et cetera, yeah.

18              MR. KESSLER:      Okay. Thank you. So last

19   call, any final words before we close the public

20   hearing?

21              MS. ZALANTIS:       So your staff did prepare

22   a draft approval resolution --

23              MR. KESSLER:      Yes.

24              MS. ZALANTIS:       -- with us, and we had



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 30 Original page ↗

                                                             Page 30
1     June 2, 2026

 2   requested some changes to that approval

 3   resolution. Specifically --

 4             MR. KESSLER:        Yep.

 5             MS. ZALANTIS:         -- conditions five and

 6   six.

 7             MR. KESSLER:        Let me get the resolution.

 8             MS. ZALANTIS:         We request that instead

 9   of being a requirement of a building permit, they

10   be a requirement of certificate of occupancy. The

11   reason being, again, is that this equipment is

12   near end of life. The hospital hopes to be able

13   to pull a building permit to start construction

14   within a month, and it’s just not possible to

15   complete all the ADA upgrades and the wetland

16   mitigation within that same month period of time,

17   but those will be completed prior to a C of O.

18             MR. KESSLER:        Mm-hmm. Okay. Anybody have

19   any objections to that?

20             MS. BROSNAN:        Does that include the

21   sidewalk project to be complete before a CO?

22             MS. ZALANTIS:         So, with respect to the

23   sidewalk project, that’s a condition of the

24   Citron lot and we still, right now, that’s been



                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 31 Original page ↗

                                                             Page 31
1    June 2, 2026

 2   issued a temporary -- so there is the requirement

 3   to close out all active construction permits, so

 4   I --

 5             MS. BROSNAN:        Before CO?

 6             MS. ZALANTIS:         Before CO. I mean, non-

 7   active construction permits. So we had asked just

 8   some clarifying language to be added in there

 9   that all open permits be closed out, but not the

10   ones that are in active construction.

11             MR. KESSLER:        I’m sorry, but not the

12   ones that are in what?

13             MS. ZALANTIS:         Are in active

14   construction.

15             MR. CUNNINGHAM:         That phrase goes into

16   condition seven.

17             MR. KESSLER:        Yeah, I’m looking at

18   condition seven.

19             MR. CUNNINGHAM:         It says, applicant

20   shall not -- this is the applicant’s attorney

21   suggestion. The applicant shall close out all

22   open permits on the site, and here’s the new

23   language, “that are not in active construction.”

24             MS. BROSNAN:        So I guess my question is



                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 32 Original page ↗

                                                              Page 32
1    June 2, 2026

 2   the sidewalk project is considered active

 3   construction? Correct?

 4              MS. ZALANTIS:         Yes.

 5              MS. BROSNAN:        Okay.

 6              MS. ZALANTIS:         Well, that’s been issued

 7   a TCO, so we are still waiting CO for that. So it

 8   wouldn’t be a condition of this. It’s a condition

 9   of the previous Citron lot approval. I mean, yes,

10   we hope to close that out very quickly, but it’s

11   sort of out of our hands at this point, because

12   we’re waiting for New York State DOT. They have

13   had all the relevant information that they need

14   to issue the required easement agreement and to

15   agree to all of that, but we understand it’s now

16   in the legal, moving through the process, but

17   it’s out of our hands.

18              MR. KESSLER:        Is that okay? Adding the

19   language, “not in active construction”?

20              MR. CUNNINGHAM:         I have no objection to

21   that.

22              MR. KESSLER:        Okay. All right, so you

23   want six and seven modified from building permit

24   to C of O?



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 33 Original page ↗

                                                               Page 33
1    June 2, 2026

 2               MR. CUNNINGHAM:         That’s five and six.

 3               MS. ZALANTIS:         That was five and six.

 4               MR. KESSLER:        I’m sorry, five and six,

 5   to C of O, and then add the not in active

 6   construction language to number seven.

 7               MR. KEHOE:       Yeah. And we need to correct

 8   various references in a whereas clause --

 9               MR. KESSLER:        Okay.

10               MR. KEHOE:       -- with respect to addresses

11   and section blocks and lots, and we’ll check with

12   the applicant and make sure we have that right.

13               MR. KESSLER:        Okay.

14               MR. KEHOE:       We do want to keep condition

15   eight. A new site lighting plan was submitted,

16   but we haven’t blessed it yet. I don’t expect any

17   problems.

18               MS. ZALANTIS:         Okay. That’s acceptable.

19               MR. KESSLER:        Okay, so let’s get a

20   couple of motions on the table here. Who’s got

21   it, Kevin? No, I’m sorry, Karen? Oh, no, I’m

22   sorry.

23               MR. KOBASA:        I think you still need to

24   close the public hearing.



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 34 Original page ↗

                                                            Page 34
1     June 2, 2026

 2               MR. KESSLER:     Kevin. It is Kevin, isn’t

 3   it?

 4               MR. KOBASA:     First I’d like to make a

 5   motion to close the public. Oh.

 6               MR. KESSLER:     Second, please.

 7               MR. KOBASA:     I turned my mic off, sorry.

 8   First, I’d like to make a motion to close the

 9   public hearing.

10               MR. KESSLER:     Second, please.

11               MR. MCKINLEY:        Second.

12               MR. KESSLER:     And on the question, all

13   in favor?

14               MULTIPLE:     Aye.

15               MR. KESSLER:     Opposed? Okay.

16               MR. KOBASA:     Second motion to adopt the

17   Resolution 12-26, approving the amended site plan

18   with the changes proposed to conditions five,

19   six, and seven or contingent, the changes

20   proposed by the applicant to conditions five,

21   six, and seven.

22               MR. KESSLER:     All right. Second, please.

23               MR. ROTHFEDER:        Second.

24               MR. KESSLER:     On the question, all in



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 35 Original page ↗

                                                               Page 35
1    June 2, 2026

 2   favor?

 3               MULTIPLE:       Aye.

 4               MR. KESSLER:        Opposed? Okay, good luck.

 5   Thanks.

 6               MS. ZALANTIS:          Thank you.

 7               MR. KESSLER:        All right, onto old

 8   business, the application of Yeshiva Ohr Hameir

 9   for site plan approval, an amended special permit

10   for a university, college, or seminary, and for

11   wetland and tree removal permits for a proposed

12   51,730 square foot dormitory building, a 1,640

13   square foot storage building, and repurposing of

14   other buildings onsite, and site improvements

15   including stormwater, landscaping, and building

16   facade renovations, located at the existing

17   Yeshiva Ohr Hameir campus at 121 Furnace Woods

18   Road, drawings revised May 15, 2026. Good

19   evening, Mr. Steinmetz again.

20               MR. STEINMETZ:          Good evening, Mr.

21   Chairman, members of the board. David Steinmetz

22   from the law firm of Zarin and Steinmetz, here on

23   behalf of Yeshiva Ohr Hameir. We obviously

24   listened to your work session. We are here



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 36 Original page ↗

                                                            Page 36
1    June 2, 2026

 2   tonight with our team. There were a number of

 3   important meetings that took place that you heard

 4   Mr. Lapine talk about, as well as I think Chris

 5   mentioned as well, between our professional team

 6   of engineers as well as the town staff.

 7             I’m delighted that Chris indicated that,

 8   I think his phrase was great progress was made.

 9   There was a lot of back and forth in addressing a

10   number of technical issues. Mr. Chairman, I did

11   hear you, in particular, raise a number of

12   comments and questions at the work session

13   relative to DOH, the Department of Environmental

14   Facilities, DEF, the capacity of the sewer

15   system.

16             I’m going to make one simple statement,

17   not as an engineer, but just kind of watching

18   this process as it has unfolded. I want to remind

19   you and the board that that sewer line and that

20   pump station are yours. They are the town’s

21   public system. They only came into existence

22   after the town filed all of the necessary

23   applications and materials with the county for

24   the Peekskill Sanitary Sewer District and with



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 37 Original page ↗

                                                            Page 37
1    June 2, 2026

 2   the Westchester County Department of Health and

 3   Department of Environmental Facilities. So, the

 4   system was designed by your engineers, it went to

 5   bid for the town, and it is the town’s project.

 6            Having said all of that, you would not

 7   have gotten your permits to build the system if

 8   it was not appropriate and designed correctly.

 9   But most importantly, there will be a condition

10   in any resolution that says before we can get our

11   building permit, we have to get, as you heard at

12   the work session, final sign-off from DOH and

13   DEF. So, while your questions, and going back

14   historically in the Marian Pompa email, are all

15   fascinating, the 16,000 versus the 23 gallons per

16   day, interesting. My position, our position is we

17   can’t build until the county government signs

18   off. I think you know that. I know your staff

19   knows that.

20            MR. KESSLER:        I guess the question is,

21   when you were looking for the approval for this,

22   what were the numbers of students and staff that

23   you represented as the requirement for that, to

24   the town to build the facility at its current



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 38 Original page ↗

                                                              Page 38
1    June 2, 2026

 2   size?

 3              MR. STEINMETZ:         When you were looking,

 4   when you were, I want to go back to your

 5   question. When you were looking for this was your

 6   phrase.

 7              MR. KESSLER:        No, I’m sorry. When you

 8   went to the -- when you represented to the town

 9   that you needed this system, the sewer system,

10   what was the representation you made in terms of

11   the number of, the population of the yeshiva?

12              MR. STEINMETZ:         So, I don’t, I can’t

13   answer that definitively because I don’t think we

14   were asked to provide the town with a definitive

15   number of individuals, because the town was

16   building a sewer system. And Dan, Steve, Rabbi,

17   you can all correct me if I’m wrong, we were

18   representing that we were going to be doing what

19   you all approved 15 years ago, building a

20   dormitory. We were going to have students. There

21   was no final number on students or staff.

22              But the town determined, and I think you

23   have it in your materials, that there is a 10-

24   million gallon capacity at the Peekskill Sanitary



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 39 Original page ↗

                                                            Page 39
1    June 2, 2026

 2   Sewer Plant, and that the maximum that anybody

 3   was talking about in the materials was six

 4   million gallons. So, there’s such an excess

 5   capacity, nobody was in the weeds of the numbers,

 6   Mr. Chairman, as you were during the work

 7   session.

 8              So admittedly, it wasn’t like we backed

 9   into the number of students, it was actually the

10   other way around. A sewer system was finally

11   designed by the town, funded in large part by the

12   yeshiva, as well as grants from the state, and

13   once that was completed and fundraising completed

14   for the yeshiva, the yeshiva determined it could

15   actually build a Dodge City dormitory that would

16   lawfully accommodate 320 students.

17              So, we came and we actually have been in

18   front of you for almost a year talking about

19   those numbers. I hope that answers your question.

20   We didn’t come to the town. There was no

21   communication that said, there will be this many

22   people, please design a sewer system for that.

23              MR. KESSLER:      Give me one second here.

24   I’m just trying to find it.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 40 Original page ↗

                                                            Page 40
1    June 2, 2026

 2            MR. STEINMETZ:         And with all due

 3   respect, Steve, turn to your left and ask Katie.

 4   I mean, she’s from the, she’s from Dodge. Do you

 5   have a piece of correspondence from me saying to

 6   you or Michael that we need a sewer system for

 7   320 students? I don’t think you’re going to have

 8   that because that’s not the way it unfolded.

 9            MR. KESSLER:        But in Dan’s letter, he

10   says the original request initiated by the

11   yeshiva was 23,000 gallons per day.

12            MR. STEINMETZ:         I believe, and Dan, help

13   me here. I believe that was from years ago with

14   the out-of-district user.

15            MR. DAN CIARCIA:          That’s correct.

16            MR. STEINMETZ:         Steve, I want to remind

17   you and the board, we’ve been at this for

18   literally --

19            MR. KESSLER:        I understand.

20            MR. STEINMETZ:         And I mean no

21   disrespect, and I don’t want to be impatient.

22   We’ve been at this for 15 years, and there have

23   been so many different iterations. This is a

24   critical point that Dan whispered to me during



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 41 Original page ↗

                                                            Page 41
1    June 2, 2026

 2   your work session. You were looking at some

 3   materials that related to a moment in time when

 4   the yeshiva was going to be an out-of-district

 5   user of the county’s sewer system. Why? Because

 6   if we’re not in a town sewer district, we can’t

 7   be an in-district user. Years later, the town,

 8   your town, in its wisdom, decided to form the

 9   Furnace Woods Sewer District, which included our

10   property and has the potential, as you heard this

11   evening, for 135 other properties. So you can’t

12   cite the 16,000 and the 23 because they’re

13   historical numbers from literally, I think, 10

14   years ago, at a point in time when I was

15   negotiating. I think I actually got a written

16   out-of-district user agreement from the county,

17   but then we pivoted away from that.

18            MR. KESSLER:        Okay. But a point in time

19   when the population was probably half of what’s

20   being proposed, just --

21            MR. STEINMETZ:         It was never half of

22   being proposed. I mean half of -- there’s 225

23   now, and there’s only 320 proposed, so where

24   would the half be?



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 42 Original page ↗

                                                            Page 42
1     June 2, 2026

 2            MR. KESSLER:        Well, plus staff. Let’s

 3   not forget the staff.

 4            MR. STEINMETZ:         Correct.

 5            MR. KESSLER:        You’ve got another 100-

 6   plus people staff, right?

 7            MR. STEINMETZ:         Correct. It would never

 8   have been half. Okay. 434 versus, I don’t know,

 9   maybe 300, so maybe --

10            MR. STEINMETZ:         Regardless.

11            MR. KESSLER:        Okay. Maybe --

12            MR. STEINMETZ:         And to, to me, the

13   numbers --

14            MR. KESSLER:        maybe a third.

15            MR. STEINMETZ:         -- again, with all due

16   respect, Mr. Chairman, the numbers are largely

17   superfluous and irrelevant because the capacity

18   of the system, as you read in the record this

19   evening --

20            MR. KESSLER:        Right.

21            MR. STEINMETZ:         There is no cap on the

22   quantity of flow. That’s what Mr. Pompa put in

23   his communication to Mr. Ciarcia.

24            MR. KESSLER:        But there’s also --



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 43 Original page ↗

                                                            Page 43
1    June 2, 2026

 2            MR. STEINMETZ:         Because he knows he’s

 3   got four million gallons of capacity.

 4            MR. KESSLER:        But there is a cap on a

 5   per person per day.

 6            MR. STEINMETZ:         Based upon some act of

 7   the county that’s some kind of mathematical

 8   construct. I don’t believe that that’s actually

 9   an individual cap, but if there was an individual

10   cap of 150 gallons per day, I think the engineers

11   will tell you we don’t -- nobody generates --

12            MR. KESSLER:        Right

13            MR. STEINMETZ:         -- 150 gallons per day.

14            MR. KESSLER:        Unless you’re filling a

15   swimming pool every day.

16            MR. STEINMETZ:         Yeah, and each person on

17   the campus is doing it.

18            MR. KESSLER:        Right. Okay, so what are

19   we waiting for then now on all this? What’s left

20   over here?

21            MR. KEHOE:       Well, with all due respect,

22   I think you should be looking to the engineers.

23            MR. KESSLER:        Oh, I’m sorry.

24            MR. KEHOE:       Isn’t that what we’re



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 44 Original page ↗

                                                            Page 44
1    June 2, 2026

 2   waiting for.

 3            MR. KESSLER:        Yeah, Chris?

 4            MR. CHRIS LAPINE:          Yeah. It’s kind of

 5   been the sanitary aspect of this offsite, and the

 6   pump station has pretty much been under the

 7   review of DOTS. But as I stated during the

 8   workshop session, as it relates to the onsite

 9   facilities, they have been properly designed to

10   handle the expected flow of 320 students and a

11   staff member and family member population of 100.

12   They have eight-inch sewer lines on site, which

13   are more than adequate for what’s being proposed.

14            MS. BROSNAN:        And that’s on the DOTS

15   side of things, but it would still need to be

16   proved out by the engineer here.

17            MR. STEINMETZ:         And as we said, I agree

18   with Katie on that wholeheartedly. In my intro, I

19   said we know before we can get a building permit,

20   it will have to be proved out. Department of

21   Health and Department of Environmental Facilities

22   will have to sign off before we can connect.

23            MR. LAPINE:        Mr. Chairman, the pump

24   station that’s been installed has a -- there was



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 45 Original page ↗

                                                            Page 45
1    June 2, 2026

 2   a capacity analysis that was done on that

 3   originally when it was designed and approved by

 4   the Department of Health. The engineer is going

 5   to have to include in his engineering report and

 6   review that what’s being proposed for the yeshiva

 7   project, plus the other offsite properties that

 8   were originally considered, the total flow

 9   associated with all those properties is not over

10   the capacity of what the pump station was

11   designed for, if that makes sense to you. So

12   that’ll have to be proved out as well as part of

13   his engineering report.

14            MS. BROSNAN:        In addition to an I&I

15   study, is typically what we request.

16            MR. STEINMETZ:         In light of those

17   comments, Mr. Chairman and members of the board,

18   I would ask you to consider, and again, we’re

19   patient and will allow you to go through your

20   analysis and your questions. I do believe, Mr.

21   Chairman, that you’re in a position to ask staff

22   simply to draft a resolution for consideration at

23   the next meeting. You don’t have to vote. If you

24   don’t think you’re ready and they tell you you’re



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 46 Original page ↗

                                                               Page 46
1    June 2, 2026

 2   not ready, you’re not going to vote. I know that.

 3   However, we’ve come this far and your outside

 4   consulting engineer has told you both in this

 5   session and in the work session that we’ve made

 6   great progress, that he’s been working hand in

 7   glove with our engineer, which we very much

 8   appreciate. And I’m convinced that if you get 10

 9   more days out of Mr. Kehoe, you’ll get a draft

10   resolution before he leaves.

11               MR. KEHOE:       I don’t think so.

12               MR. STEINMETZ:         It was worth a try,

13   Chris.

14               MR. MCKINLEY:         You put him in the

15   penalty box.

16               MR. ROTHFEDER:         You’re talking about

17   based on the latest site plan?

18               MR. STEINMETZ:         Say, I’m sorry?

19               MR. ROTHFEDER:         The resolution would be

20   based on the latest site plan, the March 13th?

21               MR. STEINMETZ:         Correct. Yes.

22               MR. ROTHFEDER:         Okay. I don’t see any

23   solar.

24               MR. STEINMETZ:         So --



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 47 Original page ↗

                                                            Page 47
1    June 2, 2026

2             MR. ROTHFEDER:         We’ve talked about that.

3             MR. STEINMETZ:         And we’ve talked about

 4   it, and I’ll do the best I can, Jeff, to answer

 5   it, because I think we did put it in our most

 6   recent letter to you. My client, and I reiterated

 7   the question tonight, because I knew you’d ask it

 8   again. If we were building right now, if we had a

 9   building permit today, I’m told every building

10   would be solar. Why? Because right now there are

11   grant programs that make it economically feasible

12   for this not-for-profit religious institution to

13   put solar on every building. It would be a great

14   thing. They have consulted with a solar company.

15   They are committed to trying to do it. It is the

16   right thing to do if it works. This is not a for-

17   profit entity. This is a small campus with small

18   roofs, one good size roof on the dormitory. If it

19   makes sense economically, there’s no reason not

20   to do it. So, I think we gave you the commitment

21   in writing in the letter. We’re committed to

22   exploring it and making it happen if it can

23   happen, and not have a negative impact. The only

24   other thing that I would say, in fairness between



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 48 Original page ↗

                                                            Page 48
1    June 2, 2026

 2   us, your code does not, in my opinion, allow you

 3   to mandate, and I think you know that.

 4              MR. ROTHFEDER:       I know that.

 5              MR. STEINMETZ:       We’ve had this

 6   discussion --

 7              MR. ROTHFEDER:       But that doesn’t mean

 8   I’m going to vote for it. No, I understand that

 9   completely, but I still think that anything we

10   build at this point that doesn’t have solar makes

11   no sense for the future. And yes, the economics

12   may not be there today, although they are --

13              MR. STEINMETZ:       They are today.

14              MR. ROTHFEDER:       They are, and they’re

15   certainly going to be there in five years, in 10

16   years, and I assume you guys want to be here for

17   a while.

18              MR. STEINMETZ:       We do.

19              MR. ROTHFEDER:       That’s where my vote’s

20   coming from. I’m just saying, I can’t, I can’t

21   care about the code.

22              MR. KEHOE:     But Jeff, we’ve done that in

23   the past. And I was only kidding, I’ll be around,

24   and we’ll figure something out. But we have put



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 49 Original page ↗

                                                            Page 49
1    June 2, 2026

 2   language in resolutions to try to figure out a

 3   way to, not quantify, but figure out a way to

 4   give you a level of comfort that if it makes

 5   economic sense for them to do it.

 6              MR. ROTHFEDER:       Right.

 7              MR. KEHOE:     They would do it. I mean

 8   we’ll try to figure out some language in the

 9   resolution.

10              MR. STEINMETZ:       And we have no objection

11   to that.

12              MR. KEHOE:     Yeah.

13              MR. STEINMETZ:       And Jeff, we would

14   endorse that language. I’m aware that we have, I

15   have used that language with Chris on other

16   matters in other contexts, and I think that would

17   work here.

18              MR. ROTHFEDER:       Right. Okay. I’m fine

19   with that. Thank you.

20              MR. KESSLER:      I think there’s one other

21   issue we didn’t address, and that is the staging

22   of the construction.

23              MR. STEINMETZ:       Absolutely. So we did

24   submit, I think it’s dated May 20th, a rather



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 50 Original page ↗

                                                            Page 50
1    June 2, 2026

 2   extensive letter from Steve Marino of Tim Miller

 3   Associates, going through the phase one, phase

 4   two, and phase three aspects of construction. I’m

 5   not going to botch it, so I’m going to let Steve

 6   walk us through it so that you’re all clear. We

 7   do believe, as he’s coming up, that we got fair

 8   questions from your board and from DOTS to make

 9   sure that the campus can operate safely. It’s

10   their job to figure out how to operate it, but

11   operating it safely is within your purview. We

12   believe it can operate safely and lawfully during

13   the construction period.

14            MR. STEVE MARINO:          Thank you, David.

15   Steve Marino, Tim Miller Associates. If you could

16   put up sheet 16, that should be the colored

17   phasing plan. Somewhere in here there’s another

18   pair of glasses that I can actually read my

19   notes. Damn it. I was so smooth walking up here,

20   and now --

21            MR. SCHWARTZ:         You want to borrow these?

22            MR. MARINO:        Oh, I wonder where they

23   went. Oh, here they are, another pocket, got it.

24   Okay. Sorry about that. Okay. So, what we’ve done



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 51 Original page ↗

                                                            Page 51
1    June 2, 2026

 2   is we’ve broken down the project into three

 3   separate phases, beginning with the construction

 4   of the new Dodge City building. That’s the large

 5   building in the center of the site. So that’s

 6   phase one. During construction of that building,

 7   public water and sewer mains will be connected.

 8   Obviously, sewer and water facilities will have

 9   to be approved by the other agencies prior to

10   that, but we need that in order to get our

11   building permit. So, that will be taking place.

12   The stormwater basin will also be installed and

13   will be used as a sediment trap during

14   construction and excavation for the floodplain

15   compensation.

16            So if you recall, a portion of the new

17   building and parking area to the west of the

18   building are in the floodplain. So in order to

19   compensate for that fill, raising of the level on

20   that part of the property, there’ll be a

21   floodplain compensation area excavated to make up

22   the volume of water that would’ve been lost in

23   the floodplain.

24            So, the large building will be



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 52 Original page ↗

                                                            Page 52
1    June 2, 2026

 2   constructed. At the completion of that building,

 3   which we expect to take about two years, this

 4   campus can then safely accommodate up to 256

 5   students.

 6            Phase two. Now, with phase two, the

 7   previous dormitory building, one of the dormitory

 8   buildings which we’ve historically called the

 9   Pool Building, will undergo construction as well

10   as renovations to the existing sanctuary, which

11   you recall is that purple extension off the new

12   building there. While this existing sanctuary is

13   being built, sanctuary operations will be moved

14   into the new building. There’s a portion of the

15   new building in the northeast corner on the first

16   floor, which is dedicated in the future to the

17   rabbi’s offices and library. But during

18   construction, during that second phase, that area

19   will be used as the temporary sanctuary. And our

20   architect has, based on square footage of that

21   area, it can support a minimum of 256 students in

22   that area for sanctuary operations. That should

23   take about a year based on that.

24            MR. MCKINLEY:         How long was that for



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 53 Original page ↗

                                                            Page 53
1    June 2, 2026

 2   sanctuary?

3             MR. MARINO:        That’s about one year for

4    that phase. During that time also, the Dallas

 5   building, the existing Dallas Building will

 6   undergo the cosmetic improvements that are

 7   proposed for the outside of that building.

 8            In phase three, now that the sanctuary

 9   is completed, the sanctuary will be able to be

10   used for sanctuary operations again. At that

11   time, construction upgrades will occur to the

12   dining building as well as the remaining staff

13   buildings of Texas and Dakota. With the

14   completion of the sanctuary renovations, the

15   sanctuary functions will return to the Chalet

16   Building, and the rabbi’s lecture room will now

17   function as a temporary dining hall. So when the

18   existing dining room building is being renovated,

19   dining will then take place in that same square

20   footage in the new building, that northeast

21   corner. And that, again --

22            MR. KEHOE:       That northeast corner --

23            MR. MARINO:        The northeast corner of --

24            MR. KEHOE:       -- is sanctuary in phase two



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 54 Original page ↗

                                                            Page 54
1    June 2, 2026

 2   and dining in phase three.

 3            MR. MARINO:        Oh, right. Exactly. And as

 4   part of my report, I do include a sheet at the

 5   end, which shows the new dormitory building with

 6   that northeast corner of approximately 4,300

 7   square feet being able to accommodate 256

 8   students for the sanctuary in phase two, and then

 9   256 students for dining in phase three.

10            MR. KESSLER:        And where’s the food

11   coming from?

12            MR. MARINO:        Food’s coming from the

13   kitchen building right next door, because the

14   kitchen building is --

15            MR. KESSLER:        That’s going to be under

16   construction?

17            MR. MARINO:        Well, the dining hall

18   portion of that building, the north portion of

19   that building, will be under construction. The

20   kitchen itself will not be going under

21   construction.

22            MR. KESSLER:        Nothing’s changing with

23   the kitchen?

24            MR. STEINMETZ:         We’re going to change



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 55 Original page ↗

                                                            Page 55
1    June 2, 2026

 2   maybe the fixtures, but there’s no changes being

 3   proposed in the kitchen.

 4            MR. KESSLER:        For the equipment or

 5   anything?

 6            MR. MARINO:        Right. Yep.

 7            MR. KESSLER:        And code doesn’t have an

 8   issue with the dining hall being -- moved to the

 9   dormitory?

10            MR. STEINMETZ:         Could you repeat that

11   question?

12            MR. KESSLER:        I’m asking if our --

13            MR. STEINMETZ:         I just want to hear it

14            MR. KESSLER:        -- if code would have an

15   issue with the dining facilities moving to the

16   dormitory.

17            MR. KEHOE:       So the food would be brought

18   outside. I don’t know if that matters or if

19   that’s even correct. I don’t know.

20            MR. STEINMETZ:         So, I believe our

21   architect, Chana, who is our code compliance

22   consultant, is on. So if you can confirm that

23   she’s on and can answer that question, while

24   we’re trying to see if she’s connected, I want to



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 56 Original page ↗

                                                            Page 56
1    June 2, 2026

 2   make sure that it’s clear that that northeast

 3   corner of the building that Steve just walked

 4   through, just to make it, to simplify it, it is

 5   being used as what I’ve been calling flex space.

 6   So in one section of the phase, it can be used as

 7   sanctuary, and that exact same space, 2,800

 8   square feet, can then be used for dining

 9   purposes. I have not been told of any kind of

10   code violation. And if you guys could --

11            MS. CHANA WEISZ:          David, I’m here. I

12   don’t know if you can hear me.

13            MR. STEINMETZ:         Perfect. Now we can. I

14   was delaying till I made sure you were there.

15   Chana, can you -- go ahead.

16            MS. WEISZ:       Yeah, there would be no

17   issues from a code perspective to use the flex

18   space, as you’re calling it, for dining. They’re

19   both assembly for educational use, as are the

20   classrooms. So there would be no issue with that.

21   And of course, we’d be providing adequate egress

22   and all safety features required. That would all

23   be overlapping. So there’s no code restricting us

24   from using that flex space as dining space.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 57 Original page ↗

                                                              Page 57
1    June 2, 2026

 2              MS. BROSNAN:        It’s my understanding that

 3   the kitchen is going to stay where it is.

 4              MR. STEINMETZ:         Correct.

 5              MS. BROSNAN:        And that the other spaces

 6   are just to eat. Is that correct?

 7              MR. STEINMETZ:         Correct. There’ll be

 8   tables like you’re sitting at, with chairs like

 9   you’re sitting at, in a room that’s larger than

10   this that can accommodate the tables and chairs.

11              MS. WEISZ:       That’s correct. We’re not

12   looking to move the kitchen into this building

13   and start with any cooking or anything like that.

14   This is just a cafeteria for eating, not food

15   prep.

16              MR. KESSLER:        And what does the space

17   become when all is said and done?

18              MR. STEINMETZ:         Ultimately becomes --

19              MR. YAAKOV ROTHBERG: The rabbi’s --

20              MR. STEINMETZ:         It’ll be the rabbi’s

21   study, lecture area, and a library. Yeah.

22              MR. KEHOE:       And that’s the first floor

23   of the dormitory building?

24              MR. STEINMETZ:         That’s correct.



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 58 Original page ↗

                                                            Page 58
1    June 2, 2026

 2             MR. KEHOE:      Which will be classroom

 3   space as well as this?

 4             MR. MARINO:       If we could bring up, I

 5   think it --

 6             MS. WEISZ:      Yes, this area is right

 7   opposite the kitchen.

 8             MR. KOBASA:       Yeah, I think it’s only the

 9   eastern end of the new dormitory.

10             MR. STEINMETZ:        It’s the northeast

11   corner.

12             MR. MARINO:       With my report from May

13   20th, I think the final page shows a floor plan

14   of that building, and it highlights --

15             MR. KEHOE:      Yeah, so it’s this.

16             MR. STEINMETZ:        There you go. You have

17   Steve’s --

18             MR. MARINO:       It highlights that corner

19   with approximately --

20             MR. STEINMETZ:        In salmon. If you have

21   Steve’s May 20th letter in front of you --

22             MR. KEHOE:      That would’ve come in your

23   packets tonight.

24             MR. KESSLER:       Is it one of the these?



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 59 Original page ↗

                                                            Page 59
1    June 2, 2026

 2             MR. KEHOE:      No, it would’ve come in your

 3   packets that we handed you tonight.

 4             MR. KESSLER:       Okay.

 5             MR. STEINMETZ:        Chris, could you just

 6   hold it up one more again?

 7             MR. SCHWARTZ:        Oh, there it is.

 8             MR. KEHOE:      Yeah. There it is.

 9             MR. STEINMETZ:        Just zoom in for just a

10   second.

11             MR. KESSLER:       Give me one sec. Got it.

12             MR. MARINO:       So that’s the layout of the

13   first-floor layout of the new building.

14             MR. KESSLER:       Got it.

15             MR. MARINO:       You can see that northeast

16   corner there is in salmon. And that’s what is

17   laid out during phase two, it’ll be used for

18   sanctuary space, and during phase three, will be

19   used for temporary dining. And that’s first

20   floor, you said?

21             MR. MARINO:       First floor.

22             MR. KESSLER:       And so going back to the

23   other one, so just give me the directions on this

24   one. So in the yellow, where is that located on



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 60 Original page ↗

                                                               Page 60
1    June 2, 2026

 2   the yellow? It’s that north --

 3               MR. KESSLER:        Right.

 4               MR. MARINO:        That corner right there.

 5               MR. KESSLER:        Right there? Okay.

 6               MR. MARINO:        And the kitchen’s straight

 7   across. Right there.

 8               MR. KESSLER:        And I assume there’s a

 9   walkway between the kitchen and that building? Or

10   --

11               MS. WEISZ:       There’s an ADA-accessible

12   route getting from one building to the other.

13               MR. MARINO:        So that closes out phase

14   three then, with the completion of the

15   improvements to the dining hall and to Texas and

16   Dakota. At that point, the entire project is

17   essentially complete. And at that time, the

18   campus can then accommodate the 320 students.

19               MR. KESSLER:        And I guess my last

20   question, is the engineering department

21   comfortable with the phasing? When I talked to

22   Mike, I thought there were some issues here

23   still.

24               MS. BROSNAN:        So the last time we looked



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 61 Original page ↗

                                                               Page 61
1    June 2, 2026

 2   at the phasing, was during the technical meeting.

 3   And from that meeting, we did have a number of

 4   comments which were discussed tonight.

 5               MR. KESSLER:        Oh, okay.

 6               MS. BROSNAN:        We’ll look at it again,

 7   just to really go through it, but the major ones

 8   that we wanted was that the wetlands were

 9   mitigated on the front end, in phase one, as

10   opposed to the original plan, which was phase

11   three.

12               MR. MARINO:        Yes.

13               MS. BROSNAN:        We didn’t want to wait for

14   the wetlands to be mitigated.

15               MR. MARINO:        Wetland mitigation and

16   floodplain compensation will occur in phase one.

17               MS. BROSNAN:        Yes.

18               MR. MARINO:        As well as abandoning the

19   existing septic systems, which again, is a big

20   contributor to any wetland problems out there on

21   the site. Those will be abandoned once the

22   connection to the pump station is complete.

23               MS. BROSNAN:        Another major item was we

24   wanted to make sure that the students that were



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 62 Original page ↗

                                                            Page 62
1    June 2, 2026

 2   there could safely eat their lunches and meals,

 3   which we asked them to describe in written

 4   narrative and to put on the plans as well.

 5            MR. MARINO:        Yes. It’s on, this new

 6   sheet, 16 of 17, now includes the same narrative

 7   I just read is on that plan.

 8            MR. KESSLER:        Okay.

 9            MR. LAPINE:        Well, Steve, I do have one

10   question as you were proceeding with this review.

11   The pool building and the Dallas building

12   renovations are going to take place in phase two,

13   and that’s primarily your staff housing. Where

14   will the staff be housed during phase two? Would

15   it make sense maybe to move the Dallas building

16   up to phase one so that you at least have a

17   portion of it?

18            MR. KESSLER:        Go ahead. Please come up.

19            MR. ROTHBERG:         Yaakov Rothberg from the

20   Yeshiva. Good evening. Chris, the pool building

21   is being renovated for new staff to move on

22   premises. They’re not currently living on

23   premises.

24            MR. LAPINE:        Correct.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 63 Original page ↗

                                                            Page 63
1    June 2, 2026

 2             MR. ROTHBERG:        The Dallas building is

 3   being proposed to give us the freedom of having

 4   traveling staff be able to come on a weekend or a

 5   holiday. So nobody’s currently -- those students

 6   that are living in the Dallas building, they’re

 7   going to be moved out into the new dormitory once

 8   it’s built. That building will be serving as,

 9   like we discussed, weekends and holidays for

10   traveling staff who don’t live on campus to be

11   able to move. So I don’t see -- we have no

12   concern about currently housing any staff members

13   until the pool building is complete, and the

14   Dallas building is just cosmetic on the outside.

15   Otherwise, it’s staying the same. We’re not

16   changing anything on the inside.

17             MR. LAPINE:       I think sprinkler systems

18   are getting installed as well.

19             MR. ROTHERBERG:        I don’t know if that

20   was determined. Chana would know better about

21   Dallas.

22             MS. WEISZ:      Well, we determined that we

23   would not be sprinklering. Again, we could

24   discuss this further with the code analysis. But



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 64 Original page ↗

                                                            Page 64
1    June 2, 2026

 2   per our last analysis, there’s no sprinkler

 3   proposed for Dallas.

 4            MR. ROTHBERG:         For the Dallas building?

 5            MS. WEISZ:       Correct.

 6            MR. LAPINE:        Yeah. I think just for the

 7   Dallas, Chana, I still think DOTS has a different

 8   perspective maybe as it relates to just the

 9   Dallas building, but, so I think you answered my

10   question, though. So there’ll be no overnight

11   staff during the construction of phase two.

12            MR. ROTHBERG:         Correct.

13            MR. STEINMETZ:         I think the short answer

14   --

15            MR. ROTHBERG:         Correct. That’s the short

16   answer. Yes.

17            MR. STEINMETZ:         I think the short answer

18   is that staff is commuting today.

19            MR. ROTHBERG:         That’s right.

20            MR. STEINMETZ:         And they will continue

21   commuting.

22            MR. ROTHBERG:         Yeah. So they will

23   continue commuting --

24            MR. LAPINE:        They’re not going to have



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 65 Original page ↗

                                                             Page 65
1    June 2, 2026

 2   to, yeah.

 3             MR. ROTHBERG:         -- until the building is

 4   complete.

 5             MR. LAPINE:        Until phase three, they’ll

 6   be able --

 7             MR. ROTHBERG:         That’s correct.

 8             MR. LAPINE:        -- to be there during,

 9   yeah. I just, I wanted to clarify for the record.

10   Yes.

11             MR. ROTHBERG:         Yeah. Am I good?

12             MR. KESSLER:        Good.

13             MR. LAPINE:        I think we’re good.

14             MR. KESSLER:        Okay. Any other comments,

15   concerns? Sure, Tom.

16             MR. BIANCHI:        I want to go back to the

17   sewage flows again, because I’m really not clear,

18   as so many numbers have been thrown around. As

19   to, I’m not questioning so much the calculations,

20   and I think that was, like David said, was the

21   town’s responsibility to design and calculate

22   what the flows would be. But there must be a, I

23   don’t think I have it, a report that was issued

24   showing not only the Yeshiva’s population



                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 66 Original page ↗

                                                              Page 66
1    June 2, 2026

 2   numbers, but the also potential residential

 3   numbers that are going to be or could be

 4   connected into the system. Does that exist?

 5              MS. BROSNAN:        Yes, that exists.

 6              MR. BIANCHI:        Could we get a copy of

 7   that?

 8              MR. STEINMETZ:         So if I can speak to it,

 9   Katie, because I lived through it, the duration.

10   I believe $90,000 was spent on Woodard and Curran

11   doing consulting engineering work for the town.

12   Somewhere in that expenditure, Woodard and Curran

13   did that analysis, and it was submitted to the

14   Department of Health in connection with an

15   analysis of the size of the pipes and the size of

16   the pump station.

17              MR. BIANCHI:        Okay. I understand that,

18   but I’d just like --

19              MR. STEINMETZ:         So that’s the report

20   you’re looking for, Tom.

21              MR. BIANCHI:        My concern, well, it’s not

22   so much a concern, but I want to make sure that

23   the proper student population and the teaching

24   population are included correctly.



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 67 Original page ↗

                                                            Page 67
1    June 2, 2026

 2            MR. LAPINE:        Yeah, that’s what I was

 3   going to, I’m sorry.

 4            MS. BROSNAN:        That’s okay. Yeah. So that

 5   letter does exist, or the memo exists from

 6   Woodard and Curran, so we have that. It was

 7   recently revised yesterday.

 8            MR. BIANCHI:        Okay.

 9            MS. BROSNAN:        From Woodard Curran. So

10   DOTS has that to share.

11            MR. BIANCHI:        Okay. Thank you.

12            MR. KESSLER:        It’s okay.

13            MR. LAPINE:        So Tom, the applicant’s

14   engineer will be responsible for preparing the

15   engineer’s report to show that their proposed

16   flows are less than what the capacity of that

17   pump station is.

18            MR. BIANCHI:        Okay. Okay.

19            MS. BROSNAN:        But it’s up to the

20   Yeshiva’s engineer to also prove out that the

21   expansion of the yeshiva sewer system can

22   withstand that as well.

23            MR. KESSLER:        And I assume we’ll see a

24   copy of that?



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 68 Original page ↗

                                                            Page 68
1    June 2, 2026

 2            MS. BROSNAN:        Mm-hmm.

 3            MR. STEINMETZ:         And Tom, just me to you,

 4   I want you to hear, the yeshiva has no desire to

 5   spend $25 million to improve its campus and not

 6   be able to flush its toilets and run its showers.

 7            MR. BIANCHI:        Hopefully not.

 8            MR. STEINMETZ:         So, I can assure you

 9   that they share the concern that the town’s

10   system has adequate capacity.

11            MR. BIANCHI:        Okay.

12            MR. KESSLER:        Are any other comments,

13   questions? So, well, we still haven’t -- I mean

14   understand your concern to prepare a resolution.

15   The question now becomes, you’re obviously

16   looking for us to approve your 350 --

17            MR. STEINMETZ:         Twenty.

18            MR. KESSLER:        -- 320, right.

19            MR. STEINMETZ:         So all we’re asking, Mr.

20   Chairman and members of the board, as we enter

21   the summer months and we have been at this for a

22   while, and I believe you know, my team has

23   responded to everything that has come at us as

24   quickly as they can. We’re asking simply for the



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 69 Original page ↗

                                                               Page 69
1    June 2, 2026

 2   preparation of a resolution. I think that will

 3   create the catharsis for us to look at the words

 4   and the language and the conditions that you need

 5   and satisfy Jeff on the solar language, and

 6   satisfy all of you on the various issues that

 7   warrant appropriate disposition. But it’s June.

 8   We had to take a couple of months off because of

 9   holidays, et cetera. We spent a lot of time with

10   staff. Let’s get to work on a resolution. I know

11   you will not vote on that resolution until the

12   people sitting to my right, your left, are

13   comfortable that you’re ready to vote.

14               MR. KESSLER:        Yeah. I’m just wondering,

15   is there some condition that determines to go

16   from student population A to B?

17               MR. STEINMETZ:         So --

18               MR. KESSLER:        And I know your position,

19   David.

20               MR. STEINMETZ:         Yeah. All right. But I -

21   -

22               MR. KESSLER:        We have no right to do

23   that. I understand that.

24               MR. STEINMETZ:         No, no, no. But that’s



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 70 Original page ↗

                                                            Page 70
1    June 2, 2026

 2   not fair to say it that way, because you’re

 3   right, you have no right. But we’ve offered to

 4   voluntarily, we’ve offered voluntarily to allow

 5   that to be a condition. You know that. We’ve

 6   discussed this together repeatedly. So while you

 7   can’t mandate it, we’ve offered it.

 8            MR. KESSLER:        Okay.

 9            MR. STEINMETZ:         I’ve discussed it

10   extensively with the town attorney’s office about

11   the language. So --

12            MR. CUNNINGHAM:         But just as a caveat,

13   too, if there’s a health, safety, or welfare

14   issue, then the board could have some sort of

15   student cap.

16            MR. STEINMETZ:         And there, in one year,

17   Mr. Cunningham, in one year, I’ve heard no

18   health, safety, and welfare legitimate concern

19   raised by anyone on the planning board or town

20   staff that has not been addressed. So if there is

21   a health, safety, and welfare concern tell us.

22            MR. KESSLER:        Well, again, that may come

23   up when you go from four to five in a room,

24   potentially. I’m not saying it -- that’s, I



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 71 Original page ↗

                                                            Page 71
1    June 2, 2026

 2   think, the issue that’s being brought up. First

 3   of all, we’re only proposing four.

 4            MR. KESSLER:        I understand that.

 5            MR. STEINMETZ:         And five is lawfully

 6   allowed. Check it with your code people. We know

 7   that. We’ve learned that in this process.

 8            MR. KESSLER:        Right.

 9            MR. STEINMETZ:         Five individuals are

10   lawfully, beyond your jurisdiction, under New

11   York State Code, five individuals are allowed in

12   each of those dorm rooms. So --

13            MR. KESSLER:        Assuming, yeah. Are you

14   referring --

15            MR. KEHOE:       But according to your own

16   phasing report, Steve says, and maybe phase one

17   takes two years, maybe phase two takes one year.

18   It says, based on available square footage, the

19   maximum student population during this time could

20   continue to be safely and lawfully at 256.

21            MR. STEINMETZ:         After phase one is

22   completed, yes.

23            MR. KEHOE:       So maybe something gets

24   worked in that 256 is the number until a certain



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 72 Original page ↗

                                                            Page 72
1    June 2, 2026

 2   point, then it can go up to 320.

3             MR. STEINMETZ:         I’ve offered, just again

 4   --

 5            MR. KESSLER:        I know. Okay.

 6            MR. STEINMETZ:         -- I feel like we miss

 7   each other because I’m having conversations with

 8   staff that are, I think, designed to protect what

 9   you’ve asked me to protect.

10            MR. KESSLER:        Right.

11            MR. STEINMETZ:         We are not seeking 320

12   boys, 320 students, until all of the

13   improvements, phases one, two, and three, are

14   completed and administratively reviewed by the

15   building department and the engineering

16   department. Period, the end. We are asking that

17   after the dormitory building is completed, the

18   wetlands that Katie reminded us of, and whatever

19   else Steve said and read to you from phase one,

20   that’s when we would be allowed to go to 256.

21   Allowed. Who knows whether there’ll be any demand

22   for the 256, and that’s not until 2029 probably.

23            MR. LAPINE:        And I think the caveat with

24   that, and as we spoke at the meeting, is that



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 73 Original page ↗

                                                              Page 73
1    June 2, 2026

 2   you’re going to demonstrate during phase one that

 3   you have the onsite capabilities for the dining

 4   that’s going to be temporary and the onsite

 5   capabilities for the studying when the chalet

 6   becomes there as a temporary --

 7              MR. STEINMETZ:         Certainly.

 8              MR. LAPINE:        When that’s under

 9   construction.

10              MR. STEINMETZ:         Yes, the flex space will

11   be built, and it has a lawful occupancy limit.

12              MR. LAPINE:        And that’ll be reviewed

13   during the building permit phase.

14              MR. KESSLER:        All right. So, okay.

15   Obviously, there’s language that needs to be

16   worked out to the satisfaction, obviously, of the

17   seven members of the board.

18              MR. STEINMETZ:         Absolutely. That’s what

19   I want to get to.

20              MR. KESSLER:        Okay. So, yeah. So I have

21   no problem with starting that process, again, not

22   knowing how long it’ll take. So I’m amenable to

23   that, to start, as long as the clock remains

24   open.



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 74 Original page ↗

                                                             Page 74
1    June 2, 2026

 2             MR. STEINMETZ:         So stipulated. Whatever

 3   extensions Mr. Cunningham needs, he knows he will

 4   get.

 5             MR. KESSLER:        Okay.

 6             MR. CUNNINGHAM:         When closing the public

 7   hearing, it was adjourned. The --

 8             MR. STEINMETZ:         We extended there.

 9             MR. CUNNINGHAM:         The shot clock was

10   adjourned without date.

11             MR. STEINMETZ:         Yeah, I thought we did.

12             MR. CUNNINGHAM:         So we don’t need

13   another course on that.

14             MR. KESSLER:        Any final words? So if

15   not, Karen, anything on --

16             MR. STEINMETZ:         May the Knicks get as

17   much latitude on the shot clock as Cunningham

18   got.

19             MR. KEHOE:       Just on the record, too, we

20   mentioned at the work session, the response to

21   all public comments --

22             MR. KESSLER:        Oh, yes

23             MR. KEHOE: -- that the applicant put

24   together, just so that’s on the record, that’s in



                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 75 Original page ↗

                                                            Page 75
1    June 2, 2026

 2   the file.

 3            MR. STEINMETZ:         Okay.

 4            MR. KESSLER:        Okay. Thank you. You’ll

 5   get that to us. Great.

 6            MR. LAPINE:        Perhaps between now and the

 7   next meeting, the applicant’s engineer can work

 8   with our office and DOTS at vetting out the

 9   capacity of the sewer pump station, so when it’s

10   time, you all feel comfortable with that.

11            MR. KEHOE:       Yeah, that’ll work itself

12   into either whereas clauses and/or conditions.

13            MR. LAPINE:        Right.

14            MR. ROTHFEDER:         And just one other

15   thing, just to get that on the record. So in

16   terms of the trees that are being taken down,

17   there are going to be more planted than are

18   necessary. That’s what I saw in the notes.

19            MR. STEINMETZ:         Correct. That was seven

20   months ago we did that.

21            MR. ROTHFEDER:         Well, I just wanted to

22   get that on the record.

23            MR. KEHOE:       It may have been seven

24   months ago, but it was just really sort of



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 76 Original page ↗

                                                            Page 76
1    June 2, 2026

 2   quantified, at least to my knowledge. So we are

 3   sending our arborist out there. Steve did a

 4   thorough job, 29 trees are going to be removed,

 5   he’s got a replanting plan but we’re having our

 6   arborist go out to confirm that.

 7            MR. ROTHFEDER:         Okay, great. Yeah, I

 8   hadn’t seen that, that way before, but so I

 9   appreciate that.

10            MR. KESSLER:        Okay, so why don’t we get

11   a motion on the table. Karen?

12            MS. TIMKO:       I’d like to make a motion on

13   PB 2025-7, Yeshiva Ohr Hameir, to refer this back

14   to staff for additional technical review and to

15   commence preparation of a draft resolution.

16            MR. KESSLER:        Perfect. Second, please.

17            MR. BIANCHI:        Second.

18            MR. KESSLER:        And on the question, all

19   in favor?

20            MULTIPLE:       Aye.

21            MR. KESSLER:        Opposed?

22            MR. STEINMETZ:         Thank you, all. I

23   appreciate that.

24            MR. KESSLER:        Thank you. Okay, next item



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 77 Original page ↗

                                                            Page 77
1    June 2, 2026

 2   under old business, the application of VS

 3   Construction Corporation for site development

 4   plan approval and for steep slope and tree

 5   removal permits for a proposed 9,600 square foot

 6   commercial building located on future parcel

 7   three within the medical-oriented district for

 8   property located at 2003 Crompond Road, drawings

 9   revised March 25, 2026. Good evening.

10            MR. STEINMETZ:         Good evening, Mr.

11   Chairman, David Steinmetz from the law firm of

12   Zarin and Steinmetz, here on behalf of VS

13   Construction. And this parcel three or lot three

14   commercial building, I’ll be very brief on this.

15   Obviously, you all went out, and many of you went

16   out and conducted a site inspection. Once again,

17   much like the last application, there have been a

18   number of meetings with staff, and we appreciate

19   all of the time that we’ve gotten from Katie and

20   Michael, and DOTS, and from Chris Lapine, as well

21   as Chris, Heather, and MC.

22            There have been a number of different

23   iterations of the commercial building that we

24   have analyzed. Heather talked a little bit about



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 78 Original page ↗

                                                            Page 78
1    June 2, 2026

 2   that, I think, this evening at the work session.

 3   I’m going to let Matt Steinberg walk us through.

 4   As you asked, there is a retaining wall that, in

 5   essence, and I can allow the technical folks to

 6   explain it, essentially remains where it is in

 7   order to develop the site. That retaining wall

 8   will remain in its location just outside the 30-

 9   foot buffer area.

10            The building itself, as you saw, for

11   those of you that went out there, there’s some

12   latitude to move it around. We expect this to be

13   an attractive commercial building, exactly like

14   what we had talked about throughout the full

15   comprehensive SEQR process with the town board as

16   lead agency. I remind your board simply that the

17   findings statement adopted pursuant to SEQR

18   acknowledged that this building would be there,

19   that there would be an access to this building,

20   there would be parking associated with it, and

21   that there were no significant adverse

22   environmental impacts.

23            Having said that, I know you all did the

24   site walk. I know you saw the neighboring



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 79 Original page ↗

                                                            Page 79
1    June 2, 2026

 2   property. We’re prepared to mitigate the views of

 3   and from that property to the maximum extent

 4   practicable. We think our building does that, and

 5   I’ll let Matt walk us through the different

 6   iterations.

 7            MR. MATT STEINBERG:           Thank you. Good

 8   evening. Matt Steinberg, DTS Provident. Heather,

 9   I guess if you bring up the first one. So at our

10   previous appearance, there were some questions

11   about the size and location of the proposed

12   commercial building. And this board obviously had

13   an opportunity to walk the site as well. So this,

14   we want to take a few moments just to go through

15   some of the, as David mentioned, some of the

16   iterations of this.

17            So this image is essentially our current

18   proposed site plan. This is the full-size set of

19   plans that we submitted. This is what we walked

20   around with on the site, holding onto. In this

21   case, the building is acting as a part of that

22   retaining wall system, the back of the building

23   that is, with the parking along the Crompond Road

24   side of the plan. We had previously submitted a



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 80 Original page ↗

                                                            Page 80
1    June 2, 2026

 2   site section. This is a version of that that cuts

 3   through, essentially, that building. We’ve kind

 4   of broken that to get you the view of to the

 5   neighboring property as well.

 6            This is a 9,600 square foot building, so

 7   during the SEQR process and the findings, we

 8   evaluate up to a 10,000 square foot commercial

 9   building. As part of this plan, we’ve reduced

10   that somewhat to try to get a better fit on the

11   property. So this is a 9,600 square foot

12   building, single story with approximately 44

13   parking spaces.

14            And since our original submission to

15   this board, what we managed to do was pull this

16   building forward by a few feet just to give a

17   little bit more space between the back of the

18   building and the retaining wall, and that 30-foot

19   non-disturbance buffer.

20            Heather, if you could go to the next. So

21   this is one of the iterations that we had

22   discussed with staff. This is about showing

23   approximately a 10,000 square foot building.

24   Roughly the same number of parking spaces as the



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 81 Original page ↗

                                                            Page 81
1    June 2, 2026

 2   other plan. This would still require a retaining

 3   wall. In this case, the retaining wall would run

 4   the entire length of the parking lot. The

 5   building obviously isn’t in that place to make up

 6   part of that wall. And the building is pushed

 7   forward closer to Crompond Road. Essentially, the

 8   rear of the building would be facing towards

 9   Crompond Road with the parking between it and the

10   neighboring property. We’ve included a site

11   section, and we can obviously submit this to the

12   board as well.

13            So essentially, the layout, it’s

14   flipped, but has the same components, same

15   parking lot, just on the other side, same

16   retaining wall. The building, as you can see from

17   the neighboring property, while there’s some

18   vegetation and trees in that 30-foot non-

19   disturbance area, the owner would be looking out

20   over to this building. Although, instead of

21   looking completely over it, there may be views to

22   it since it’s further in that line of sight.

23            MR. KESSLER:        How many feet does it move

24   forward in this rendition?



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 82 Original page ↗

                                                              Page 82
1    June 2, 2026

 2              MR. STEINBERG:         In this one, it’s about,

 3   essentially it’s 25, about 35 feet.

 4              MR. KESSLER:        Thirty-five feet closer to

 5   Crompond Road?

 6              MR. STEINBERG:         Yep.

 7              MR. STEINMETZ:         Satisfying setbacks on

 8   that?

 9              MR. STEINBERG:         Yes. So you can kind of

10   see the setbacks. It’s a dashed line between

11   Crompond Road and -- so essentially, it’s the

12   width of the -- the length of the parking space

13   and the width of the aisle.

14              MR. KEHOE:       And a while ago, very

15   preliminarily, you talked to staff about these

16   options, and we were a little concerned that that

17   would be the back of the building facing Route

18   202.

19              MR. STEINBERG:         Correct.

20              MR. KEHOE:       And then you provided some

21   renderings or images of what that would look

22   like? I can’t remember.

23              MR. STEINBERG:         I don’t think we had

24   images of that building in that location, showing



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 83 Original page ↗

                                                              Page 83
1    June 2, 2026

 2   the rear of it.

 3              MR. KEHOE:       We --

 4              MR. STEINBERG:         But we did discuss that,

 5   yes.

 6              MR. KEHOE:       But maybe you showed the one

 7   -- you did get something if you were standing in

 8   Route 202 looking up through it.

 9              MR. STEINBERG:         Right, and that is of

10   the current proposal with the building to the

11   back.

12              MR. STEINMETZ:         The original proposal.

13              MR. KEHOE:       Okay, so you have that

14   somewhere in your packets.

15              MR. STEINBERG:         Yeah.

16              MR. KEHOE:       Okay.

17              MR. STEINMETZ:         But Chris, we’re

18   prepared to do the same kind of architectural

19   treatment.

20              MR. KEHOE:       Okay.

21              MR. LAPINE:        How high is the wall in

22   this alternative?

23              MR. STEINBERG:         So in this alternative,

24   it’s still about 16 feet in the center.



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 84 Original page ↗

                                                              Page 84
1    June 2, 2026

 2              MR. STEINMETZ:         At the highest

 3   point.Right, the highest point.

 4              MR. STEINBERG:         Right, the highest

 5   point. So, closer to Lafayette, it goes down to,

 6   kind of peters out to about two feet, and then

 7   kind of in the center portion, so I guess if you

 8   look at the center of the building across from

 9   that, you’re at about 16 feet in height, and then

10   it gradually goes down again to about 12 feet in

11   height on the western side. So, in the version

12   with the building as the retaining wall, it

13   would, the parapet would rise above that, in that

14   case.

15              MR. LAPINE:        And that’s keeping the same

16   finished floor elevation in this model of 377?

17              MR. STEINBERG:         Yes, because it’s really

18   based off of that, trying to set that parking

19   lot, so it’s about the same.

20              MR. LAPINE:        If you raised that finished

21   floor, though, then we can lower that wall in

22   this alternative?

23              MR. STEINBERG:         It’s possible. Then it

24   starts having some, obviously trying to get the



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 85 Original page ↗

                                                            Page 85
1    June 2, 2026

 2   grading to work with the Lafayette access and the

 3   access road into it, but, yeah.

 4            MR. STEINMETZ:         Remind everyone that’s

 5   the emergency access.

 6            MR. STEINBERG:         Correct. Right. So this

 7   parcel itself also serves as an emergency access

 8   point. So the entry road, the main entry road to

 9   that lollipop that everyone kind of refers to,

10   this driveway comes off of that. A fire truck or

11   emergency vehicle could circulate through this

12   parking lot and in and out from Lafayette as

13   another point of access to the overall

14   development. And during this process, we did try

15   to raise the building a little bit to reduce not

16   only cut and fill, but also to try to reduce the

17   height of that wall.

18            I guess, Heather, if you’d go to the

19   next one, I’ll show this one as well. So this is

20   a little bit less developed of a plan because

21   this generally comes from an earlier version of

22   the master plan that we had been reviewing during

23   the end of the SEQR process. This represents

24   essentially a two-story version, so it’s



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 86 Original page ↗

                                                            Page 86
1    June 2, 2026

 2   approximately 5,000 square foot footprint, so

 3   5,000 on each level. In this scenario, retail on

 4   the second level doesn’t really work for an

 5   operator, especially the type of retail that’s

 6   permitted in the mod. So most likely it would be

 7   all medical office on that second level. So it’s

 8   additional parking that’s required for that. And

 9   then the retail space, obviously, is much more

10   limited on the first level because this building

11   would also be required to have some kind of an

12   entry lobby for the office, an elevator, and a

13   staircase. So it wouldn’t actually be 5,000 of

14   retail most likely. So, this was previously

15   evaluated, but it just, for the applicant, it

16   wasn’t really a feasible option compared to the

17   one story.

18            MR. KESSLER:        Feasible for tenanting

19   purposes?

20            MR. STEINBERG:         For their tenant, right,

21   right. So obviously you can see that we’ve got

22   the site plan to work, but from looking for a

23   tenant, the interest that was out there, it

24   wasn’t feasible for them.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 87 Original page ↗

                                                            Page 87
1    June 2, 2026

 2            MR. KEHOE:       I think this is always the

 3   point where they want you to tell them what to

 4   do.

 5            MR. KESSLER:        Well, the main concern was

 6   obviously the proximity to the neighbor, even

 7   though we know that the neighbor’s going to be

 8   looking at the roof of the building, right, that

 9   we’ve established that on the site visit.

10            MR. STEINBERG:         Right.

11            MR. KESSLER:        But I guess now, I didn’t

12   realize that we’re talking such a significant

13   retaining wall going up there as well. And that’s

14   represented by the red? Where’s the retaining

15   wall, up against the --

16            MR. STEINBERG:         So if you look at this,

17   there’s kind of a darker line along the back of

18   the parking there. That is essentially --

19            MR. KESSLER:        Okay.

20            MR. STEINBERG:         -- the retaining wall.

21            MR. KESSLER:        Abutting the parking.

22            MR. STEINBERG:         Yeah.

23            MR. STEINMETZ:         Abutting the parking.

24            MR. STEINBERG:         Right. Essentially, that



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 88 Original page ↗

                                                              Page 88
1    June 2, 2026

 2   creates the pad for the parking.

 3              MR. KEHOE:       But I think you touched upon

 4   it, Matt. If the building is -- it depends what

 5   the view from the neighbor’s house is going to

 6   be. If the building is pushed way back, they may

 7   be overlooking the roof of the building. If it’s

 8   pushed forward, they may be seeing the roof of

 9   the building.

10              MR. STEINBERG:         They may be seeing the,

11   right. So obviously, the closer something is,

12   they would potentially be looking over it. We’ve

13   proposed -- the architects have proposed like a

14   parapet wall at the top of the back. We can also

15   install, between the back of the building, there

16   would have to be a fall protection fence. So that

17   could be a solid fence. It could definitely be

18   solid so that it provides additional screening as

19   well.

20              MR. KESSLER:        So the choice is looking

21   over the top of the building or looking over the

22   parking lot.

23              MR. KOBASA:        Well, sorry. No.

24              MR. KESSLER:        Is that what it comes down



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 89 Original page ↗

                                                            Page 89
1    June 2, 2026

 2   to?

 3            MR. KOBASA:        Can you go back to the

 4   first, yes, plan? The current proposal. Yeah.

 5   It’s not looking at the parking lot. You’ll never

 6   see the parking lot from the standpoint.

 7            MR. KESSLER:        No, these other two,

 8   though, you look at the parking lot.

 9            MR. KOBASA:        You, no.

10            MR. STEINBERG:         You probably look over

11   the parking lot.

12            MR. KOBASA:        You’ll never see the

13   parking lot.

14            MR. STEINBERG:         You likely would not see

15   the parking lot.

16            MR. KOBASA:        In this view right here --

17            MR. STEINBERG:         Right.

18            MR. KOBASA:        They will never see the

19   parking lot.

20            MR. STEINBERG:         Right.

21            MR. KOBASA:        Not possible. And if a

22   solid screened fence goes up, they probably won’t

23   see most of the building unless they’re up in the

24   dormer floor of that building, but even then



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 90 Original page ↗

                                                               Page 90
1    June 2, 2026

 2   they’re looking through canopy trees. So maybe

 3   that’s your winter --

 4               MR. KEHOE:       Well, and you don’t have

 5   these in paper copy, correct, right?

 6               MR. STEINBERG:         Not the second two,

 7   correct.

 8               MR. KEHOE:       Right. And so it’s hard to

 9   see, but the bottom of that image really is what

10   I think Kevin’s talking about. It’s giving you

11   the view from the neighbor’s house out across the

12   property.

13               MR. KOBASA:        Mm-hmm.

14               MR. KEHOE:       So we’ll get you the hard

15   copies and you can easily see.

16               MR. KOBASA:        Yeah. Can you, when you

17   send us these copies, can you just do a vision,

18   right?

19               MR. STEINBERG:         We can do that. Yeah.

20   And I think in one of our earlier --

21               MR. KOBASA:        What someone would be

22   looking at?

23               MR. STEINBERG:         Yeah. Like that we add

24   that back on.



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 91 Original page ↗

                                                              Page 91
1    June 2, 2026

 2              MR. KOBASA:        So you’ll be able to see

 3   that if they give you a sight line cone. So what

 4   someone will be looking at, what gets caught in

 5   that. Of these three plans, this is, in my

 6   opinion, the most preferable because you’re only

 7   putting parking adjacent to two sides. One of

 8   those sides is a much lower wall probably, right?

 9   That’s the side where it’s almost two feet, the

10   Lafayette side

11              MR. STEINBERG:         The Lafayette side, it

12   does, yeah. And that’s --

13              MR. KOBASA:        So then it’s just the other

14   side where you’re closer to like a 12-foot wall.

15   But most of that 16-foot wall that are in these

16   other two plans are, they disappear by the

17   building. So the building becomes the retaining

18   wall. You’ll never see the 16-foot high retaining

19   wall if the building goes where it’s in this

20   thing, because the building becomes the retaining

21   wall.

22              MR. STEINMETZ:         So, Mr. Chairman, we

23   agree with Kevin’s request. Allow us to do that

24   visual assessment. I think it makes a lot of



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 92 Original page ↗

                                                            Page 92
1    June 2, 2026

 2   sense. And I think the other thing that we’re

 3   looking for some guidance on, we don’t believe as

 4   a team that the two-story building makes sense.

 5            MR. KESSLER:        Right.

 6            MR. STEINMETZ:         And unless you want,

 7   unless you disagree, we don’t want to spend time,

 8   money, and effort studying it because it just

 9   doesn’t work there --

10            MR. KESSLER:        Right.

11            MR. STEINMETZ:         -- from our standpoint.

12            MR. KESSLER:        Right. If it’s not

13   commercially feasible, then yeah, absolutely.

14            MR. STEINMETZ:         Okay. So, I think the

15   issue is we will do a visual assessment of the

16   building where we’d like it, sort of towards the

17   back of the lot, up against the retaining wall,

18   and then we will do a further visual analysis

19   pulling it forward. And to your point, Kevin, we

20   will look at it, and I want to look at it, with

21   all due respect, to studying it from the

22   neighbor’s vantage point, which is fine, and we

23   will do that. There are thousands of passersby on

24   202, and seeing, understanding what that view is



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 93 Original page ↗

                                                               Page 93
1    June 2, 2026

 2   for a commercial building is a very important

 3   analysis. So I want to make sure we’re giving you

 4   that, too.

 5               MR. KESSLER:        Okay.

 6               MR. KOBASA:        When you do it, not just a

 7   person standing at grade, but also assume

 8   someone’s looking out that dormer window up

 9   there.

10               MR. STEINMETZ:         Yeah, we can cut it,

11   what that looks like, so the site view from both

12   sides, both heights.

13               MR. KOBASA:        Yes.

14               MR. STEINBERG:         All right.

15               MR. ROTHFEDER:         I was just going to,

16   that issue about the trees that came up in the

17   work session.

18               MR. STEINBERG:         Yes.

19               MR. ROTHFEDER:         Yes. So you said you had

20   a different number, that the number from Save a

21   Tree is the whole property?

22               MR. STEINBERG:         It is the whole

23   property, right. So, it’s for this parcel, and

24   we’ll talk later this evening about the town



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 94 Original page ↗

                                                              Page 94
1    June 2, 2026

 2   owned parcel.

 3              MR. ROTHFEDER:         Right.

 4              MR. STEINBERG:         It covered that as well.

 5   So they did the whole balance of the site that

 6   wasn’t previously done. So it’s a big number in

 7   the report you got. So what we can do is we can

 8   parse out --

 9              MR. ROTHFEDER:         Okay

10              MR. STEINBERG:         -- parcel three, parcel

11   two. We started doing that. We can provide a tree

12   map. We have the trees in that buffer area that

13   we looked at when we were on the site, walked

14   together, so --

15              MR. ROTHFEDER:         Okay. So you’ll provide

16   that?

17              MR. STEINBERG:         So provide that with

18   some additional detail.

19              MR. ROTHFEDER:         Okay. Thank you. Yep.

20              MR. STEINBERG:         And it’s all based on

21   Save a Tree.

22              MR. ROTHFEDER:         Thank you.

23              MR. KESSLER:        Okay. Any other comments

24   from the board or staff? Hearing none, Nora?



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 95 Original page ↗

                                                            Page 95
1    June 2, 2026

 2            MS. HILDINGER:          I’d like to make a

 3   motion for PB 2026-3 to refer this back to staff

 4   for additional technical review.

 5            MR. KESSLER:        Thank you. Second?

 6            MR. MCKINLEY:          Second.

 7            MR. KESSLER:        And on the question? All

 8   in favor?

 9            MULTIPLE:       Aye.

10            MR. KESSLER:        Opposed? Okay. Moving on.

11   Next item is the application of John Lentini for

12   the property of J Glamour Nails and Spa for site

13   development plan approval and for conversion of

14   the former La Valetta Restaurant into a nail

15   salon for property located at 3172 East Main

16   Street. Drawings revised February 13, 2026. Good

17   evening, Mr. Lentini.

18            MR. LENTINI:        Good evening, Mr.

19   Chairman, members of the planning board, town

20   staff, and Mr. Kehoe.

21            MR. KESSLER:        So we had a site visit

22   last Thursday.

23            MR. LENTINI:        Yes. I’d like to say,

24   first of all --



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 96 Original page ↗

                                                            Page 96
1    June 2, 2026

 2            MR. KESSLER:        Yeah

 3            MR. LENTINI:        -- I heard everything that

4    was said about Chris. I’d like to second it. I

 5   have nothing to add, but I have had one problem

 6   with him now that he’s leaving. And I wonder if I

 7   can get your home number.

8             MR. KEHOE:       Sure.

 9            MR. LENTINI:        I need him. I don’t know

10   how I’m going to do this without him. Well, we’ll

11   work it out. Okay. As far as the Glamour Nail

12   goes, I know that one of the things we discussed

13   at length was the amount of seats, and I’m

14   working on a plan to reduce them by 40 percent,

15   maybe 50 percent. I’m reminded by the former

16   owner, who was just here a moment ago, that there

17   were like 40 or 50 seats in La Valletta. So I’m

18   going to keep it to that. I also want to explain

19   what the owner was trying to explain in her

20   broken English, that she wants to show she has a

21   big place, not that she planned on populating it,

22   which might sound a little inefficient, but I’m

23   reminded of my history. I worked at a drafting

24   office in Brooklyn in the ‘60s, and we had 16



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 97 Original page ↗

                                                            Page 97
1    June 2, 2026

 2   drafting tables and four draftsmen. So when

 3   people came in, we were courting big work, and

 4   they would look all, where are all the draftsmen?

 5   Well they’re out measuring. You know, but the

 6   fact is, that was part of the sales pitch. But

 7   they have no intention, or they don’t have any

 8   dream that they’ll ever fill up 56 seats.

 9            MR. KESSLER:        Well, you have nine

10   parking spaces that you’re proposing, so I guess,

11   you know.

12            MR. LENTINI:        Right.

13            MR. KESSLER:        You know, 54 doesn’t go

14   into nine.

15            MR. LENTINI:        Well, the building was

16   designed so that it fell within the zoning code

17   for the amount of spaces per square feet. It’s

18   always nice to have more parking, but I believe

19   we are conforming with the code.

20            MR. KESSLER:        Understood.

21            MR. LENTINI:        Another thing that was

22   discussed with the engineering department,

23   actually with the planning board, that my plans

24   are a little unclear now because I originally was



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 98 Original page ↗

                                                            Page 98
1    June 2, 2026

 2   adding to this building to make it look like

 3   something. Obviously, it’s going to be a new

 4   building, so I’m going to take reference off the

 5   plans. I tried to get it in before tonight, but

 6   it wouldn’t have been circulated anyway. But

 7   it’ll be presented as a completely new building.

 8            MR. KESSLER:        Okay.

 9            MR. LENTINI:        Herein, going forward. The

10   other issue that we discussed briefly, but that

11   the engineering department has had a problem

12   with, is the three curb cuts. And the prior owner

13   was telling me that when they had a taking on

14   Route 6, this was a big issue with the Department

15   of Transportation, and they came up with this

16   configuration as being the best for the use at

17   the time, which was the same thing, a multifamily

18   house and a pizza shop. So, besides, we’re

19   looking at it as a drop-off point for first

20   responders to be able to get emergency vehicles

21   around the building. We don’t want to cut access

22   to the building.

23            I’m not sure how I’m going to resolve

24   that with the engineering department, but the one



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 99 Original page ↗

                                                            Page 99
1    June 2, 2026

 2   issue about the two properties with the one

 3   driveway, we will provide whatever easement is

 4   required that will legally allow people to come

 5   into both properties, even though they’re under

 6   the same ownership. So I’m here to request that

 7   we can advance this to possibly a public hearing.

 8            MR. KESSLER:        You think we’re ready for

 9   a public hearing on this?

10            MR. KEHOE:       I hate to do this to John at

11   my last meeting, but I would think we’d like to

12   see the revised plan --

13            MR. KESSLER:        Yeah

14            MR. KEHOE:       -- first.

15            MR. LENTINI:        I’d like to get more

16   comments so I don’t keep on drawing. If any

17   comments come out from the public, I’ll be back

18   to the drafting table.

19            MR. KESSLER:        I don’t think we’ll hear a

20   lot from the public. I think the issue still

21   remains the --

22            MR. MCKINLEY:         Parking.

23            MR. KESSLER:        -- capacity and the

24   ability of the parking to accommodate the



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 100 Original page ↗

                                                              Page 100
1    June 2, 2026

 2   proposed capacity.

 3              MR. LENTINI:        Understood.

 4              MR. KOBASA:        What is the amount of

 5   parking required for the two-story dwelling?

 6              MR. LENTINI:        Nine spaces. It’s for the

 7   first floor, every square foot, 300 square feet

 8   per car.

 9              MR. KOBASA:        No.

10              MR. KEHOE:       The house next door.

11              MR. KOBASA:        The house, right? Because

12   part of this issue with this site plan is you

13   have -- there’s existing parking that’s shown in

14   the middle of your drive lane that you want to

15   keep.

16              MR. LENTINI:        I’ll move it. That’s where

17   I see cars parked. There’s no striping, but I’ll

18   move that parking over towards the other parking.

19   And I understand there’s three families there,

20   two spaces per family, I believe is what the code

21   would require, that we have six spaces.

22              MR. KOBASA:        Yeah, I think we need to

23   see how you park that out.

24              MR. KESSLER:        Are you going to be



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 101 Original page ↗

                                                            Page 101
1    June 2, 2026

 2   striping those parking spaces as well?

 3             MR. LENTINI:       I think we should.

 4             MR. KESSLER:       I think you should, too.

 5             MR. LENTINI:       Yeah. And I think the

 6   whole parking lot’s going to have to get repaved

 7   anyway.

 8             MR. KESSLER:       Yeah.

 9             MR. LENTINI:       Both of them.

10             MR. BIANCHI:       You mentioned the code.

11   You meet the code, but the code is based on, as I

12   understand, it’s square footage, not clients --

13             MR. LENTINI:       Right.

14             MR. BIANCHI:       -- which is the problem

15   here. How do you fit, even if you cut it in half,

16   how do you fit that many potential clients at one

17   time into nine parking spaces?

18             MR. LENTINI:       And the workers, and the

19   employees.

20             MR. BIANCHI:       Excuse me?

21             MR. LENTINI:       And the employees. We have

22   the customers and the employees. Well, the

23   employees are driven there by bus. Most of the

24   families are from Queens, I understand. They



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 102 Original page ↗

                                                            Page 102
1    June 2, 2026

 2   actually commute up for other businesses from

 3   Queens. And I explain my own family situation. My

 4   wife, daughter-in-law, and two granddaughters get

 5   their nails done regularly as an ordeal. And

 6   either they’ll drive in one car or my son drops

 7   them off and picks them up. So there’s ways of

 8   getting there, and if you are used to not getting

 9   enough parking, I believe you won’t just try to

10   park at the ShopRite. I think that’s one of the

11   concerns, that everybody will start parking at

12   ShopRite.

13            MR. BIANCHI:        Well, yeah or parking

14   adjacent to the neighboring houses there.

15            MR. LENTINI:        Well --

16            MR. BIANCHI:        And there, right in front

17   of their house, you know, just fitting in

18   whatever they can.

19            MR. LENTINI:        Well, they can’t park on

20   Route 6, so it would be --

21            MR. BIANCHI:        That I know, yeah.

22            MR. KESSLER:        Or parking in the front,

23   where there’s room.

24            MR. BIANCHI:        The front.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 103 Original page ↗

                                                            Page 103
1    June 2, 2026

 2            MR. LENTINI:        No, we prohibited parking

 3   in the front.

 4            MR. KESSLER:        I understand that.

 5            MR. LENTINI:        That would be --

 6            MR. BIANCHI:        You’ve got to, go ahead,

 7   I’m sorry.

 8            MR. LENTINI:        The town would have -- I

 9   once saw Eddie Brexa giving tickets out in front

10   of NAPA Auto Parts. So the town would actually

11   have the ability to ticket vehicles if they were

12   parked in the front.

13            MR. KEHOE:       You’ll flesh out some more

14   parking, both with respect to the house next

15   door, figure out what you’re going to do with

16   those spots, because there was some parking

17   shown, I guess, right in front of that other curb

18   cut, which doesn’t work.

19            MR. LENTINI:        Yes.

20            MR. KESSLER:        Yeah. Right.

21            MR. LENTINI:        Well, I could park more in

22   the back where the septic system’s getting

23   abandoned, but then we start losing the

24   impermeable to the ratio for landscaping.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 104 Original page ↗

                                                             Page 104
1    June 2, 2026

 2             MS. LAVARNWAY:         I think you’re also

 3   going to want to just be careful with your site

 4   circulation, where you’re putting the spaces,

 5   because if the spaces right now that are sort of

 6   shown in the entrance, obviously, if cars were

 7   parked there, it would impede --

 8             MR. LENTINI:        Well, for the residents,

 9   yes.

10             MS. LAVARNWAY:         -- it would impede

11   circulation for a fire vehicle or -- so, you have

12   to keep that into consideration if all those

13   spaces are filled with cars, what does --

14             MR. LENTINI:        Absolutely.

15             MS. LAVARNWAY:         -- it do to the

16   circulation?

17             MR. LENTINI:        That was a bad choice on

18   my part, drafting error. Because I just, I really

19   wasn’t involved with the house until the

20   engineering department asked me to draft it. And

21   I used a survey and Google Images, and I found

22   after year after year, that’s actually where the

23   cars parked. So we’ll prevent them from parking

24   in front of the curb cut.



                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 105 Original page ↗

                                                            Page 105
1    June 2, 2026

 2            MR. BIANCHI:        I just think you need to

 3   prove, to me especially, how you’re going to fit

 4   whatever number of clients you expect to have

 5   there at one time into the number of parking

 6   spaces that you make available.

 7            MR. LENTINI:        I’d like to say it’s --

 8            MR. BIANCHI:        That’s the bottom line.

 9            MR. LENTINI:        Yeah. I’d like to say it’s

10   their problem, but I understand completely. And

11   unless I -- we need a variance for the side yard,

12   too. That’s something else I’d have to get

13   referred to. So perhaps we could increase the

14   parking lot and request a variance for lack of

15   landscaping.

16            MR. KEHOE:       But John, if you’re going to

17   start from scratch, tear the building down and

18   start over.

19            MR. LENTINI:        We have to --

20            MR. KEHOE:       You sure you’re still going

21   to need a variance?

22            MR. LENTINI:        Yes.

23            MR. KEHOE:       Okay.

24            MR. LENTINI:        Because there’s no way



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 106 Original page ↗

                                                            Page 106
1    June 2, 2026

 2   we’re going to get entrance to the building with

 3   the side yards that are required. We’re hugging

 4   that one corner. It’s only five feet from the

 5   Crossings property, and if we moved it 30 feet

 6   over, we lose the driveway.

 7            MR. KEHOE:       Well, you would need to get

 8   the drawings a little more fleshed out to figure

 9   out the coordination between the planning board

10   and the zoning board.

11            MR. CUNNINGHAM:         And John, if you’re

12   going to ask for at least one variance anyway,

13   why don’t you design it in a way, even if you

14   need extra variances to put more spaces on, it

15   might improve the site plan overall.

16            MR. LENTINI:        I will do that.

17            MR. CUNNINGHAM:         Even if you need all

18   the variances.

19            MR. LENTINI:        I’ll do that.

20            MR. ROTHFEDER:         How many spaces are we

21   looking for, though? I mean --

22            MR. LENTINI:        It’s many more than nine.

23            MR. ROTHFEDER:         Well, yeah.

24            MR. KOBASA:        I don’t want to just all of



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 107 Original page ↗

                                                               Page 107
1    June 2, 2026

 2   a sudden build a giant parking lot.

 3               MR. BIANCHI:        Right.

 4               MR. KOBASA:        Like I understand

 5   everyone’s concerns, right. But, well, how many

 6   more do we want?

 7               MR. LENTINI:        Well, here was the

 8   landscape requirement.

 9               MR. KOBASA:        If we put in 16 spaces,

10   right?

11               MR. BIANCHI:        Give us some kind of

12   guidance.

13               MR. KOBASA:        We’re putting in more

14   asphalt, we’re putting in more, like it’s, is it

15   worth it?

16               MR. KESSLER:        It’s got to be on the

17   other side. It’s not the parking issue, it’s the

18   number of --

19               MR. ROTHFEDER:         Yeah, clients.

20               MR. KESSLER:        -- yeah, clients, proposed

21   clients.

22               MR. ROTHFEDER:         Yeah.

23               MR. LENTINI:        Well, we’re reducing the

24   seating, and I wish there was a way I could offer



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 108 Original page ↗

                                                            Page 108
1    June 2, 2026

 2   you the volume of a business like this, but most

 3   of the nail salons I’ve done have been a quarter

 4   of this size. I don’t think I’ve ever done

 5   anything quite this large. I’ve worked on beauty

 6   shops where there’s hair cutting and everything

 7   that aren’t even this big, but --

 8            MR. ROTHFEDER:         Which is the problem,

 9   though? I mean that ultimately becomes the

10   problem, right. If it were a smaller one like

11   normal, then the parking would be okay. You’ve

12   even cut it back, but that gives the capacity

13   then to include all of those people in there, and

14   the parking just doesn’t work out.

15            MR. KEHOE:       But once again --

16            MR. ROTHFEDER:         But that’s ultimately --

17            MR. KEHOE:       -- is it still sort of tied

18   to this? Does your client still have this idea

19   that she needs to be working from the footprint

20   of the existing building?

21            MR. LENTINI:        Yeah.

22            MR. KEHOE:       You could build an any size

23   new building you want.

24            MR. ROTHFEDER:         If you’re building --



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 109 Original page ↗

                                                               Page 109
1    June 2, 2026

 2               MR. LENTINI:        Well, that’s true. That is

 3   what crossed my mind, except that we still need a

 4   variance, and the foundation is there, and it’s

 5   good. We’re going to take the building down to

 6   the foundation. The foundation under the kitchen

 7   isn’t very good, but the rest of it is actually

 8   suitable for what we’re doing.

 9               MR. KEHOE:       But that’s just something to

10   think about. You’re in charge of the size of that

11   building.

12               MR. LENTINI:        Well, I got them to lower

13   it a little bit because they wanted two 12-foot

14   floors, and now we’re down to 11.

15               MR. LAPINE:        Could you also maybe, if

16   you’re taking a building down, and you’re

17   replacing a part of a foundation, why not

18   reorient the building somewhere onsite so that

19   the parking’s more suitable for the particular

20   use? You may be able to increase your parking by

21   relocating the building.

22               MR. LENTINI:        That’s a good, it’s a

23   luxury to have, to actually be able to do that,

24   but --



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 110 Original page ↗

                                                            Page 110
1    June 2, 2026

 2            MR. LAPINE:        Well, if you look at, and

 3   I’m not the engineer in charge of the review of

 4   this, but as I look at this and I see what your

 5   slopes are on the backside of where your parking

 6   is, they’re a little steep. Maybe it also affords

 7   you the opportunity to provide some less steep

 8   slopes for your patrons as well.

 9            MR. LENTINI:        Well, I think we got a

10   survey based on one of our earlier meetings that

11   proves that there was, I think a four percent or

12   five percent slope. I think it’s well within the

13   accessible route from anywhere in the parking lot

14   to the building right now.

15            MR. KOBASA:        Yeah. I guess if you’re

16   ripping this whole building down, why not look at

17   a different configuration for where that building

18   sits on the site that works better with all of

19   your curb cuts --

20            MR. KESSLER:        Yeah. It seems like you’re

21   --

22            MR. KOBASA:        -- the flow of traffic. It

23   seems like you’re tying yourself to the fact that

24   there’s a good foundation there, but maybe that’s



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 111 Original page ↗

                                                            Page 111
1    June 2, 2026

 2   what you got to ignore.

 3             MR. LENTINI:       I’m sure you’d want to

 4   keep it parallel to Route 6, though, and that’s

 5   what it essentially it is.

 6             MR. KOBASA:       But you could twist your

 7   building so it runs lengthwise and you’re still

 8   parallel to Route 6. Like --

 9             MR. LENTINI:       Well, there’s another

10   component too. He wants to put solar cells on the

11   roof, and this works out pretty good. I’m not

12   sure --

13             MR. KOBASA:       That works out good on one

14   side, not the other.

15             MR. LENTINI:       Well, I don’t think we can

16   get it on the whole building unless we put a flat

17   roof in, but he also wanted a gable roof. He

18   wants to look at kind of residential. It’s a

19   transition area. We’re coming from residential to

20   commercial.

21             MR. KOBASA:       Okay.

22             MR. LENTINI:       But I take it all. I

23   actually agree with everybody, and it’s much

24   easier for me to detail a brand new building than



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 112 Original page ↗

                                                               Page 112
1    June 2, 2026

 2   all the stuff I’ve been working on with this

 3   shape.

 4               MR. KESSLER:        Okay. I think we’re --

 5               MR. BIANCHI:        Yeah.

 6               MR. KESSLER:        -- grasping at straws

 7   here.

 8               MR. LENTINI:        I’ll be back with plans

 9   that will allow me to get on the next --

10               MR. KESSLER:        Before I pull my nails

11   out, yeah.

12               MR. LENTINI:        -- [unintelligible]

13   [01:36:18] possibly [unintelligible] [01:36:18]

14   somewhere.

15               MR. KESSLER:        Yeah.

16               MR. ROTHFEDER:         Exactly.

17               MR. KESSLER:        Okay. So, all right. Work

18   to be done, John, clearly.

19               MR. LENTINI:        Always. Thank you.

20               MR. KESSLER:        All right. So Tom?

21               MR. BIANCHI:        Mr. Chair, I move to refer

22   this back for further review and await further

23   development of plans for alternatives.

24               MR. LENTINI:        Thank you.



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 113 Original page ↗

                                                               Page 113
1    June 2, 2026

 2               MR. KESSLER:        Second, please.

 3               MR. ROTHFEDER:         Second.

 4               MR. KESSLER:        On the question? All in

 5   favor?

 6               MULTIPLE:       Aye.

 7               MR. KESSLER:        Opposed? All right.

 8   Thanks, John. All right, Next item, the

 9   application of Joel Greenberg on behalf of Robert

10   Fucci for preliminary plat approval for a two-lot

11   minor subdivision of an approximately 22,000

12   square foot parcel of property located at 12

13   Putnam Park Road, drawings revised May 20, 2026.

14   Mr. Greenberg, good to see you.

15               MR. JOEL GREENBERG:           Good evening. I’d

16   just like to make a statement before I go into

17   the project --

18               MR. KESSLER:        Sure.

19               MR. GREENBERG:         -- and to wish Chris a

20   happy retirement.

21               MR. KEHOE:       You came back specifically

22   after years of being away just for tonight,

23   didn’t you, Joel?

24               MR. GREENBERG:         Right.



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 114 Original page ↗

                                                            Page 114
1    June 2, 2026

 2            MR. KEHOE:       You organized your plan

 3   resubmittal.

 4            MR. GREENBERG:         I did. It was done

 5   purposely. And also, I must --

 6            MR. KESSLER:        Pull the microphone down a

 7   little bit. Yeah.

 8            MR. GREENBERG:         -- I must compliment

 9   Chris too. Over the years, I’ve been here on and

10   off, but Chris always reminds me, he says, don’t

11   forget to wish the board a good holiday, whatever

12   that next holiday is.

13            MR. KESSLER:        I’m sure he did that.

14            MR. KEHOE:       Steve and I talked. We were

15   guessing which one you were going to say but

16   we’ll wait till you say it and see.

17            MR. GREENBERG:         Oh, we’ll wait. Yes.

18            MR. KESSLER:        Okay.

19            MR. GREENBERG:         Anyway, as you can see,

20   we’re proposing a two-lot subdivision right off

21   Oregon Road, Putnam Park Road. Mr. Fucci has a

22   house on the right side of the lot, and we’re now

23   proposing a two-lot subdivision, and the other

24   lot will probably be a new lot for a house for



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 115 Original page ↗

                                                            Page 115
1    June 2, 2026

 2   his daughter. So, this basically is a family

 3   operation, but we obviously want to have two

 4   separate lots. We meet the code as far as area

 5   and setbacks are concerned. If you’ve been to the

 6   site, the street is perfectly level. The new

 7   driveway will be perfectly level, as you can see

 8   from the topo. And we’d like to -- we’ve been to

 9   the health department. We’ve done all our testing

10   for the septic for the new house, and that’s all

11   been submitted to the health department, just

12   waiting for their final approvals, and we’d just

13   like to proceed with the subdivision.

14            MR. KESSLER:        Yeah. Pretty

15   straightforward, you’re really threading a needle

16   here with these two lots, though, right?

17            MR. GREENBERG:         What’s that?

18            MR. KESSLER:        You’re threading a needle

19   here with, what is it, 10,000 --

20            MR. GREENBERG:         Yeah, but it --

21            MR. KESSLER:        It works.

22            MR. GREENBERG:         -- it does meet the

23   code. We have the 75-foot frontage, and we have

24   at least 10,000 square feet per lot.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 116 Original page ↗

                                                               Page 116
1    June 2, 2026

 2               MR. KESSLER:        Okay. Is there, is it

 3   ready?

 4               MR. KEHOE:       It’s a minor thing, but in

 5   looking at Joel’s plan, there’s like six things

 6   on the plan, and one of the smaller things is the

 7   actual plan. So, if you could enlarge that so

 8   it’s an entire sheet --

 9               MR. GREENBERG:         Okay.

10               MR. KEHOE:       -- rather than sort of just

11   as an inset, and make the zoning compliance table

12   and the location map smaller because it is hard

13   to see some of the details on that plan.

14               MR. GREENBERG:         Sure.

15               MR. KEHOE:       And Heather reminded me that

16   even though you may be compliant with respect to

17   lot area, there is probably a variance going to

18   be required. For width?

19               MS. LAVARNWAY:         Yeah.

20               MR. KESSLER:        Right. So, I think in your

21   zoning chart, you --

22               MS. LAVARNWAY:         Lot A.

23               MR. KEHOE:       Yeah.

24               MR. KESSLER:        A width variance, you’re



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 117 Original page ↗

                                                              Page 117
1    June 2, 2026

 2   saying?

 3              MS. LAVARNWAY:         For lot width of lot A.

 4   The chart indicates a variance would be required.

 5              MR. KESSLER:        Okay.

 6              MR. GREENBERG:         Okay, so can we go to

 7   the zoning board and see if we can get the

 8   variance so we can proceed?

 9              MR. KESSLER:        Okay. Yeah. It seems

10   pretty straightforward, but send us the enlarged

11   plan.

12              MR. GREENBERG:         Yes, of course.

13              MR. KESSLER:        We wrote a review memo,

14   you responded to the review memo?

15              MR. GREENBERG:         Yes. You have a letter.

16   I responded to all the items on the review memo.

17              MR. KESSLER:        And you’re satisfied with

18   the responses?

19              MR. KEHOE:       I think we want another

20   technical meeting.

21              MR. KESSLER:        Okay, fine. All right, so

22   we’ll refer this back, and hopefully we’ll get

23   you back on in July. All right?

24              MR. GREENBERG:         Okay. But in the



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 118 Original page ↗

                                                               Page 118
1    June 2, 2026

 2   meantime, can we apply to the zoning board?

 3               MR. CUNNINGHAM:         So, with that, Joel,

 4   you don’t even need the planning board’s

 5   permission. You’d have to just submit to code

 6   enforcement, they’ll have to give you a denial

 7   letter, and then you can get onto the ZBA agenda.

 8               MR. GREENBERG:         Okay. Well, thank you

 9   very much. And there’s several holidays we have

10   to talk about. There’s Father’s Day, 250th

11   anniversary, and July 4th. So, happy, happy,

12   happy.

13               MR. KESSLER:        Thank you, Joel.

14               MR. GREENBERG:         Thank you very much.

15               MR. ROTHFEDER:         I move that we refer

16   this application back to staff for further

17   review.

18               MR. KESSLER:        Second, please?

19               MR. BIANCHI:        Second.

20               MR. KESSLER:        On the question? All in

21   favor?

22               MULTIPLE:       Aye.

23               MR. KESSLER:        Opposed? Okay, thanks.

24               MR. GREENBERG:         Thank you very much.



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 119 Original page ↗

                                                            Page 119
1    June 2, 2026

 2   Good night.

 3             MR. KESSLER:       Okay, last item under old

 4   business is the application of Mike Miele for

 5   property at 56 Mistis Roa Hook Road Corporation

 6   for site development plan approval and for a

 7   steep slope permit for a proposed 16,000 square

 8   foot indoor multi-sports facility for property

 9   located at 56 to 64 Roa Hook Road, drawings dated

10   February 22, 2025. Pretty straightforward. Peter?

11             MR. MCKINLEY:        Mr. Chairman, I’d like to

12   declare the planning board as lead agent for PB

13   2026-8 at 56 Mantis Road Hook Road Corporation.

14             MR. KESSLER:       Second, please.

15             MR. KEHOE:      Declare your intent.

16             MR. BIANCHI:       Second.

17             MR. MCKINLEY:        Intent.

18             MR. KEHOE:      You’re not lead agent, yet.

19   You have to declare your intent.

20             MR. MCKINLEY:        Intent. Thank you, Chris.

21             MR. KESSLER:       So amended. Second,

22   please?

23             MR. ROTHFEDER:        Second.

24             MR. KESSLER:       And on the question? All



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 120 Original page ↗

                                                            Page 120
1    June 2, 2026

 2   in favor?

 3            MULTIPLE:       Aye.

 4            MR. KESSLER:        Opposed?

 5            MR. KEHOE:       So, just the purpose of that

 6   is we have to circulate it to other agencies, and

 7   until they object or don’t object, you’re not

 8   actually lead agent.

 9            MR. KESSLER:        Okay. Final item this

10   evening is new business. It’s the application of

11   VS Construction Corporation for preliminary plat

12   approval, steep slope, wetland, and tree removal

13   permits to permit the construction of 96

14   townhomes, including 10 percent affordable units,

15   with associated site improvements on an

16   approximately 17.6 acre portion of the Evergreen

17   Manor project site. The subdivision proposes 99-

18   lot subdivision of the approximately 21-acre

19   parcel two of 2023 Evergreen Manor subdivision to

20   create 96 individual townhome lots, a common

21   homeowners’ association lot, a commercial lot,

22   and an open space non-building lot parcel

23   containing the existing wetland adjacent to

24   Crompond Road. The project is located within the



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 121 Original page ↗

                                                            Page 121
1    June 2, 2026

 2   medical-oriented district on property located at

 3   2003 Crompond Road. Drawings dated May 20, 2026.

 4   Mr. Steinmetz, good evening again.

 5            MR. STEINMETZ:         Good evening, Mr.

 6   Chairman, members of the board. David Steinmetz

 7   from the law firm of Zarin and Steinmetz here

 8   with regard to VS Construction. Now, kicking off

 9   on our, what we refer to as lot two, or the

10   townhouse project.

11            I’m extremely pleased to announce that

12   with me this evening are two representatives of

13   Lennar Homes, Bob Geiger and Jake Gunning. For

14   those of you that don’t know, Lennar Homes, a

15   division of US Homes, is one of the nation’s

16   largest home builders. We are extremely pleased

17   that they are the contract vendee to implement

18   and develop the 96 proposed residential

19   townhouses. And they are here and have been

20   coordinating with our team as we’re now ready to

21   advance this.

22            As you heard from the chair and as the

23   agenda indicates, the proposal tonight is for 96

24   townhouse lots, two lots associated with the HOA



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 122 Original page ↗

                                                            Page 122
1    June 2, 2026

 2   and the project itself, and then an additional

 3   lot to finally create the lot that the chairman

 4   and I have discussed, debated, and disagreed on

 5   relative to whether or not I could advance the

 6   commercial application without a lot. So now,

 7   that lot line has been drawn as well. Okay. So,

 8   that is why we end up with 99 lots.

 9            You did ask the question, and I didn’t

10   respond during your work session, but I agree

11   with Mr. Kehoe. The road is a parcel. It is not a

12   lot, and that’s why it’s 99 lots. The project

13   itself, the reason we’re here talking about a

14   subdivision, and the reason I’m using the phrase

15   lots with regard to townhouses, reminding your

16   board when the town board adopted the MOD, the

17   medical-oriented district, the town mandated that

18   the townhouses or development in the MOD would

19   require fee simple lots.

20            So, just so that we’re all clear, I can

21   build a townhouse attached to another townhouse

22   unit, and I can develop them and sell them as

23   condominiums. I can also build the exact same

24   structure with one townhouse next to another



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 123 Original page ↗

                                                            Page 123
1    June 2, 2026

 2   townhouse, and I can create lot lines and sell

 3   them as fee simple HOA lots. They’re different

 4   forms of ownership. It’s the exact same unit or

 5   dwelling. Your town decided in its wisdom that it

 6   wanted fee simple lots. By creating fee simple

 7   lots, it allows the developer to create lot lines

 8   where driveways, patios, backyards are actually

 9   owned by the individuals acquiring the unit, as

10   opposed to the same exact dwelling where the

11   condominium allows you to own the interior skins

12   of your unit and everything else you actually

13   don’t own.

14            Regardless, there would still be a

15   homeowners’ association. The homeowners’

16   association would be responsible for the exterior

17   maintenance as prescribed in the declaration of

18   covenants and restrictions. Certainly, all snow

19   plowing would be done, and general open space

20   maintenance would all be done by the HOA.

21            And this is not Lennar’s first rodeo.

22   Lennar, if you’re not aware and you look into it,

23   you will see that Lennar is building residences

24   throughout the nation, throughout the region.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 124 Original page ↗

                                                            Page 124
1    June 2, 2026

 2   They have some rather large projects not far

 3   away, and they’re very excited to be coming into

 4   New York and coming into Westchester, in

 5   particular, coming into the town of Cortlandt.

 6            We have in front of you tonight the

 7   initial subdivision layout. You can see what Matt

 8   referred to earlier, and you’ve heard us

 9   throughout our deliberations and discussions with

10   you on other matters. That’s the top of the

11   lollipop road with the cul-de-sac. So we have our

12   main road coming into Evergreen Manor. That is a

13   public road culminating in a cul-de-sac. Off of

14   the cul-de-sac, we have two other private roads

15   that service different units, and there are two

16   other connections to the road itself.

17            The property would have 96 townhouses

18   developed in different groupings. They would be

19   what we refer to as four-packs, five-packs and

20   six-packs, if I’m not mistaken. The largest

21   grouping would be six units together, and there

22   would be some others that are somewhat smaller.

23   And you can see the distribution of the units.

24            We are required to have 10 percent



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 125 Original page ↗

                                                            Page 125
1    June 2, 2026

 2   affordable under the MOD, so there would be 10

 3   percent affordable housing units. The exact

 4   locations and distribution have yet to be

 5   finalized, but it’s essentially contemplated that

 6   the affordable units would likely be distributed

 7   along the main artery on the left-hand or eastern

 8   side of the property.

 9            The property is proposed to be developed

10   respecting the 100-foot buffer. There may be some

11   work that has to be done in reforestation behind

12   it, but the units have all been pulled forward to

13   respect that buffer. We do have a wetland area in

14   the southwest corner that you can see, a wetland

15   area. There have been reports and studies that

16   have been submitted on that. Steve Marino and

17   Matt Steinberg can speak to that if you have

18   questions.

19            There are no amenities. There is no

20   clubhouse or pool. Again, there’s been a fair

21   amount of discussion about that. Lennar’s

22   position is a development of this size, it’s

23   really not large enough to warrant some larger

24   public amenity or community amenities. They’ve



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 126 Original page ↗

                                                               Page 126
1    June 2, 2026

 2   done enough of these projects where if you have a

 3   community that is a little bit on the smaller

 4   side, it saddles residents with a rather sizable

 5   common area maintenance charge for something that

 6   they may not actually make sufficient use of. So

 7   there would be recreation fees paid to the town

 8   in connection with this development.

 9               We are happy to walk you through any

10   further details. We actually have some proposed

11   architectural renderings. Chris, I think you’ve

12   got that. These are all early, just conceptual

13   designs. There’s nothing that’s been finalized.

14   This is a six-pack that we’re looking at here,

15   where you can see six different units with

16   different roof lines and articulations so that

17   you’re not looking at one straight building.

18   That’s essentially the design concept. Lennar

19   spent a fair amount of time looking at

20   architecture throughout Cortlandt and trying to

21   come up with a design concept that they felt not

22   only fit the site, but fit the community at

23   large.

24               You can see that the units vary in size



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 127 Original page ↗

                                                            Page 127
1    June 2, 2026

 2   here. The end units both have garages that would

 3   accommodate two side-by-side cars. The middle

 4   units are smaller and would accommodate, I

 5   believe those are both Bob and Jake, one-car

 6   garages, right.

 7            We have sufficient driveway space in

 8   front of every unit to accommodate guest parking.

 9   So we do believe that we can adequately park the

10   site, and stormwater management for the

11   driveways, the roads, the roof areas have all

12   been taken into account. And Matt and DTS and

13   their group have designed the drainage for the

14   overall project.

15            We’ve got some iterations of the rear of

16   the property, with the rear of the six-pack

17   building and the side of the six-pack building,

18   you can see here. And just another, these are

19   some floor plans. The units vary in size from --

20            MR. GUNNING:        Approximately 2,200 square

21   feet, and then the two-story --

22            MR. STEINMETZ:         The units vary in size

23   from the smaller ones from 2,200 square feet to

24   the larger ones being 2,700 square feet. Again,



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 128 Original page ↗

                                                            Page 128
1    June 2, 2026

 2   everything is for sale. Steve, questions?

 3             MR. KESSLER:       Just so I’m clear, there

 4   are basically three models of homes that are

 5   being proposed. Is that correct? Three models,

 6   Emory, Yorktown, and Chase?

 7             MR. STEINMETZ:        Models? Yes. Somebody

 8   want to just --

 9             MR. GUNNING:       Yes, three separate

10   models?

11             MR. KESSLER:       Three separate models.

12             MR. KEHOE:      And so no on-street parking

13   or guest parking is proposed?

14             MR. STEINMETZ:        I believe that that is

15   correct. No, Matt? No. There is some guest

16   parking in a pull off.

17             MR. KESSLER:       Yeah, you’ve shown on the

18   plan, there’s guest parking.

19             MR. STEINMETZ:        Right. Oh, okay.

20             MR. KESSLER:       And this includes the

21   relocation of wetland mitigation?

22             MR. STEINMETZ:        Matt, you want to speak

23   to the mitigation?

24             MR. STEINBERG:        Yeah. So it’s, we’ve got



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 129 Original page ↗

                                                            Page 129
1    June 2, 2026

 2   it on this illustrative plan. You can see the

 3   wetland at the south, that’s that lighter green.

 4   So along this, essentially it expands that

 5   wetland, is the mitigation.

 6            MR. KESSLER:        So that is an expansion of

 7   the existing wetland to compensate for the

 8   wetland that’s being lost on other parts of the

 9   property?

10            MR. STEINBERG:         Correct. Yes.

11            MR. KESSLER:        Okay.

12            MR. STEINMETZ:         That’s what you meant by

13   relocation?

14            MR. STEINBERG:         Yes.

15            MR. STEINMETZ:         Got it.

16            MR. STEINBERG:         So replacement.

17            MR. KESSLER:        Remediation.

18            MR. STEINMETZ:         The relocation was what

19   threw me. The replacement or --

20            MR. LAPINE:        Mitigation.

21            MR. STEINMETZ:         Yeah.

22            MR. KOBASA:        Are you proposing a

23   walkway, a walking trail? Is that what that is?

24            MR. STEINMETZ:         There is a walking trail



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 130 Original page ↗

                                                               Page 130
1    June 2, 2026

 2   around the wetland area.

 3               MR. STEINBERG:         Yes.

 4               MR. KOBASA:        Okay.

 5               MR. STEINBERG:         There would be a walking

 6   trail around the wetland area that was studied.

 7   Most likely, this would be a -- it wouldn’t be a

 8   paved path. It would be something more of a

 9   mulch.

10               MR. KOBASA:        Are you proposing lighting

11   along it? Is that what the black dots are?

12               MR. STEINBERG:         I think we’ll have to

13   take another look at that. I don’t think it’s

14   necessary.

15               MR. KOBASA:        Nope.

16               MR. STEINBERG:         Yeah, we’ll --

17               MR. STEINMETZ:         I didn’t think we were

18   doing that lighting like that.

19               MR. KOBASA:        Nope.

20               MR. STEINBERG:         Yeah. We’ll, I think --

21   yeah, that’s fine.

22               MR. KOBASA:        But also you’re showing it

23   in your 100-foot no disturbance area. That would

24   be a disturbance. That’s supposed to be



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 131 Original page ↗

                                                              Page 131
1    June 2, 2026

 2   untouched.

 3              MR. STEINBERG:         We’ll take another look

 4   at that, and how much we’d previously proposed.

 5              MR. KESSLER:        I’m sorry, which one are

 6   you talking about?

 7              MR. KOBASA:        Go, Do you have a site, I’m

 8   looking at the site plan.

 9              MR. STEINBERG:         It’s at the, I guess the

10   top of this plan.

11              MR. KOBASA:        It’s at the top, but yeah.

12   So you can see, It’s this part ... there’s a 100-

13   foot no disturbance line, basically. The walking

14   trail goes up and into that 100-foot disturbance

15   area.

16              MR. BIANCHI:        I’m not sure if this has

17   been done yet, but have any traffic studies been

18   done? Was it part of the original --

19              MR. STEINMETZ:         Yes.

20              MR. BIANCHI:        -- MOD?

21              MR. STEINMETZ:         Important question, and

22   I appreciate you making sure we hit that for the

23   record, Tom. The 96 townhouses were studied as

24   part of the FEIS, and were determined, pursuant



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 132 Original page ↗

                                                            Page 132
1    June 2, 2026

 2   to the findings statement, to have been

 3   adequately studied and no significant adverse

 4   environmental impacts associated with the traffic

 5   here. So this project and its traffic was

 6   studied.

 7              MR. KESSLER:      So the impacts in terms of

 8   the operation of intersections and everything,

 9   were you saying was no impact?

10              MR. STEINMETZ:       Yes.

11              MR. KEHOE:     But they are making

12   improvements.

13              MR. CUNNINGHAM:       There are going to be

14   significant improvements on the corridor. So this

15   build-out is included in what’s required for the

16   improvements on the corridor, so --

17              MR. KEHOE:     New traffic lights.

18              MR. CUNNINGHAM:       Right.

19              MR. KEHOE:     New timing of traffic

20   lights.

21              MR. KESSLER:      Oh, okay.

22              MR. KEHOE:     Turning lanes.

23              MR. STEINMETZ:       These 96 townhouses are

24   part of the underpinning of the several million



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 133 Original page ↗

                                                            Page 133
1    June 2, 2026

 2   dollars of offsite mitigation that’s required

 3   together with Gyrodyne, et cetera.

 4            MR. KESSLER:        And fire has no issue

 5   getting to all these homes, right? I guess when

 6   you studied this under SEQR?

 7            MR. CUNNINGHAM:         Well, I think this

 8   layout itself has probably not been studied. So

 9   we’d have to review that, obviously.

10            MR. STEINMETZ:         Yeah. And I agree with

11   MC on that. We expect to be meeting with the fire

12   department and reviewing all of that. We believe

13   it does. It’s been templated out by our traffic

14   engineer, but obviously your fire department

15   needs to review it.

16            MR. KESSLER:        So just when the town

17   board approved the maximum of 96 townhomes, they

18   saw a rendition of it?

19            MR. STEINMETZ:         They saw an early

20   rendition. They saw a general concept that wasn’t

21   that different from this.

22            MR. KESSLER:        Okay.

23            MR. STEINMETZ:         But the details of fire,

24   K-turns, and turnaround obviously needs to be



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 134 Original page ↗

                                                            Page 134
1    June 2, 2026

 2   examined.

 3            MR. KESSLER:        Got it.

 4            MR. STEINMETZ:         Private roads, private

 5   maintenance, private curbing.

 6            MR. KESSLER:        And then just to bring it

 7   full circle, the road on the bottom right there,

 8   that’s the one that goes to the commercial

 9   property?

10            MR. STEINMETZ:         That is correct. If one

11   of you guys can just cursor over that so we make

12   sure we’re not talking about the wrong

13   connection. Close. Down.

14            MR. KESSLER:        I see it.

15            MR. KEHOE:       The one down there.

16            MR. STEINMETZ:         So it’s behind that

17   lower row of townhouses.

18            MS. BROSNAN:        It’s at the bottom of it.

19            MR. STEINMETZ:         All right. Anyway, I

20   think you guys --

21            MR. KOBASA:        It’s the one that doesn’t

22   have any color on it.

23            MR. STEINMETZ:         That’s exactly right.

24   There’s no color, and it is lower than where we



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 135 Original page ↗

                                                            Page 135
1    June 2, 2026

 2   are right now. Bingo, right there.

 3            MR. KESSLER:        Yeah.

 4            MR. STEINMETZ:         You got it. So yes, it

 5   is shown on there.

 6            MR. KESSLER:        Okay.

 7            MR. STEINMETZ:         I guess the best way to

 8   answer it to make sure we don’t miss each other,

 9   there are no townhouses accessed off of that

10   driveway connection to lot three, the commercial

11   lot. Thank you for putting the blue in there.

12            MR. KEHOE:       And you can’t really see on

13   that rendering, you can barely see, though, below

14   the blue line is actual water, and then I think

15   the water crosses the access road, and so some of

16   those units are actually in a wetland. Now, the

17   debate will be that the town board

18   environmentally cleared this through SEQR.

19            MR. KESSLER:        Right.

20            MR. KEHOE:       But you still have to issue

21   the wetland permit. So you would be within your

22   rights to analyze that, and that’s why they have

23   Steve Marino on board, and --

24            MR. STEINMETZ:         Correct



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 136 Original page ↗

                                                            Page 136
1    June 2, 2026

 2            MR. KEHOE:       That’s mitigated in other

 3   places on the site.

 4            MR. KESSLER:        Right.

 5            MR. STEINMETZ:         So everything Chris

 6   said, it took him 30 years, but I finally agree

 7   with him.

 8            MR. KESSLER:        It took you 30 years.

 9            MR. STEINMETZ:         All right. All kidding

10   aside, he accurately reports. We knew there was

11   going to be a wetland crossing. It was studied

12   pursuant to SEQR. And again, going back to the

13   commercial building that we talked about on the

14   earlier application, even just to build the

15   emergency access that the town board wanted from

16   the Lollipop cul-de-sac out to Lafayette, was

17   going to necessitate some degree of wetland

18   buffer and wetland crossing and disturbance. So,

19   this driveway connection was studied. That area,

20   we knew was going to be, the area Chris was just

21   referring to, where there are about four to six

22   townhouses that have buffer or some piece of

23   wetland on it, that was studied.

24            And it is, we believe, Steve believes,



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 137 Original page ↗

                                                            Page 137
1    June 2, 2026

 2   and DTS believes, adequately built into our

 3   mitigation proposal. But if you have questions on

 4   that, we want to know what they are, and we want

 5   to make sure we answer that, because those are

 6   very important townhouses, and we do not want to

 7   lose the density.

 8              MR. MCKINLEY:       What school district does

 9   this reside in? Is this Lakeland or --

10              MR. STEINMETZ:       This is Hen Hud, Matt,

11   correct?

12              MR. STEINBERG:       It’s Lakeland.

13              MR. STEINMETZ:       Lakeland, sorry, my bad.

14   Thank you.

15              MR. BIANCHI:      So all of that’s been

16   analyzed as well?

17              MR. STEINMETZ:       Yes

18              MR. BIANCHI:      Tax receipts?

19              MR. STEINMETZ:       Yes.

20              MR. BIANCHI:      Real estate taxes, and all

21   the other?

22              MR. STEINMETZ:       Yes.

23              MR. BIANCHI:      School population impact

24   and all that stuff has all been done already?



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 138 Original page ↗

                                                            Page 138
1    June 2, 2026

 2            MR. STEINMETZ:         Correct. SEQR is done.

 3            MR. KESSLER:        So our job is permits.

 4   What about landscaping? Was that done or --

 5            MR. STEINMETZ:         I mean there were

 6   conceptual landscape, but no, you get to look at

 7   the -- we invite you and hope you will look at

 8   and comment on the green areas, the street trees,

 9   the lighting. We’ve been told, we know from

10   Heather, that we’ve got to pay close attention to

11   the new lighting requirements and I believe we

12   have hopefully done that correctly. So, those are

13   the issues.

14            This is, though it’s 96 townhouses, and

15   I kind of foreshadowed this a year ago, and you

16   didn’t want to hear it then, but we knew this was

17   not -- we don’t believe this is a big lift. We

18   believe that this, the SEQR issues have been

19   addressed, thankfully, so the largest lift of

20   this has been addressed. There are some wetlands

21   technical details now that we have to look at.

22   But the density was addressed. The fact that this

23   was going to be townhouses has been addressed.

24            And you’re really commenting on our



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 139 Original page ↗

                                                            Page 139
1    June 2, 2026

 2   subdivision layout because we’re going to need

 3   preliminary subdivision approval with a public

 4   hearing under Section 276 and the town

 5   subdivision regulations, and then final

 6   subdivision approval. And we’re hoping to go

 7   through that fairly quickly. I can tell you --

 8            MR. KESSLER:        And the permits.

 9            MR. STEINMETZ:         Right, and the permits.

10            MR. ROTHFEDER:         And that includes the

11   buildings?

12            MR. STEINMETZ:         Lennar is anxious to get

13   in and file and start the building permit review

14   process with the building department. The market

15   is strong. The community is presently quite

16   desirable. And they’re ready to get going as soon

17   as we have everything fully baked here. So, the

18   good news for the town is there is a builder

19   here, anxious and ready to proceed. And from all

20   the data that we get from not just clients, but

21   from the State of New York and from the Regional

22   Planning Association, there is still tremendous

23   housing demand in our state that we are hopefully

24   going to hit and try to satisfy.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 140 Original page ↗

                                                               Page 140
1    June 2, 2026

 2               MR. KESSLER:        Okay. So, you know the

 3   routine. So we’ll refer this back. We’ll get some

 4   review memoranda, and we’ll proceed without

 5   Chris.

 6               MR. STEINMETZ:         The only thing that I

 7   would ask, to kind of cut to the chase,

 8   especially in light of the questions, if you’re

 9   going to bring a wetland person in to look at

10   that one area, let’s do that sooner rather than

11   later. And let’s confront that. I think we’ve

12   addressed --

13               MR. KESSLER:        Well, let’s get the review

14   memoranda first, and then we’ll make

15   determinations.

16               MR. STEINMETZ:         Fair enough.

17               MR. KESSLER:        You know, whether it’s --

18               MR. STEINMETZ:         Start thinking about who

19   you want to bring in.

20               MR. KESSLER:        Yeah. No, but I think

21   that’s definitely going to happen.

22               MR. KEHOE:       Yeah, you did fund --

23               MR. STEINMETZ:         What’s that?

24               MR. KESSLER:        -- fund a very large



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 141 Original page ↗

                                                            Page 141
1    June 2, 2026

 2   escrow account.

 3            MR. STEINMETZ:          We did?

 4            MR. KEHOE:       Yes.

 5            MR. STEINMETZ:          Then tell that to the

 6   chairman.

 7            MR. KEHOE:       Yeah. So, we have a huge pot

 8   of money to hire necessary consultants.

 9            MR. KESSLER:        Is that paying for your

10   party tomorrow night?

11            MR. KEHOE:       No.

12            MR. STEINMETZ:          Nice. Inappropriate, but

13   nice. I did have some town officials say to me

14   that the application fee that was paid on this

15   was one of the larger application fees that you

16   all have received in quite some time. So, every

17   single lot is a different fee. So, we’re ready to

18   rock and roll.

19            MR. KESSLER:        All right. So we will get

20   the ball rolling on this. So, Kevin?

21            MR. KOBASA:        I’d like to make a motion

22   to refer back to staff for review.

23            MR. KESSLER:        Second, please.

24            MR. ROTHFEDER:          Second.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 142 Original page ↗

                                                            Page 142
1    June 2, 2026

 2            MR. KESSLER:        And on the question, all

 3   in favor?

 4            MULTIPLE:       Aye.

 5            MR. KESSLER:        Opposed? Okay. Chris,

 6   again, thank you for all, everything you’ve done.

 7   And Kevin?

 8            MR. KOBASA:        The time is 8:30, meeting

 9   adjourned.

10            MR. KESSLER:        Okay.
11            (The public board meeting concluded at 8:30.)




                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 143 Original page ↗

                                                                      Page 143


                             CERTIFICATE OF ACCURACY



     I, Juliana Castano, certify that the foregoing

     transcript of the Board meeting of the Town of

     Cortlandt on June 2, 2026 was prepared using the

     required transcription equipment and is a true and

     accurate record of the proceedings.



        Certified By



        ________________________________________



        Date: June 18, 2026




GENEVAWORLDWIDE, INC

228 Park Ave S - PMB 27669

New York, NY 10003




                                 Geneva Worldwide, Inc.
                     228 Park Ave S - PMB 27669. New York, NY 10003