Official certified transcript

2026-05-05 · Planning Board

Imported from the Town’s original PDF. Speakers follow the printed labels. Citations use PDF pages rather than video timestamps.

Original certified PDF ↗ · Archived original ↓

Page 1 Original page ↗

      TOWN OF CORTLANDT

  PLANNING AND ZONING BOARDS




        BOARD MEETING




           Town Hall

        1 Heady Street

Cortlandt Manor, New York 10567

          May 5, 2026

    6:30 p.m. - 7:44 p.m.

Page 2 Original page ↗

                                                               Page 2
May 5, 2026

MEMBERS PRESENT:


    Steven Kessler, Chairman

    Thomas A. Bianchi, Vice Chairman

    Nora Hildinger, Member

    Kevin Kobasa, Member

    Peter McKinley, Member

    Jeff Rothfeder, Member

    Kellan Cantrell, Member



ALSO PRESENT:


    Chris Kehoe, AICP, Director of Planning

    Michael Cunningham, Esq., Deputy Town Attorney (Zoom)

    Heather LaVarnway, CNU-A, Planner

    Catherine Brosnan, P.E., Assistant Civil Engineer




                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 3 Original page ↗

                                                             Page 3
1    May 5, 2026
 2   (The board meeting commenced at 6:30 p.m.)

 3             MR. STEVEN KESSLER:           All right. Good

 4   evening. Welcome to the May 5th planning board

 5   meeting. Please rise for the pledge.

 6             MULTIPLE:       I pledge allegiance to the

 7   flag of the United States of America and to the

 8   republic for which it stands, one nation under

 9   God, indivisible with liberty and justice for

10   all.

11             MR. KESSLER:        Thank you. Chris, roll

12   please.

13             MR. CHRIS KEHOE:          Mr. Kobasa?

14             MR. KEVIN KOBASA:          Here.

15             MR. KEHOE:       Ms. Hildinger?

16             MS. NORA HILDINGER:           Here.

17             MR. KEHOE:       Mr. Rothfeder?

18             MR. JEFF ROTHFEDER:           Here.

19             MR. KEHOE:       Mr. Kessler?

20             MR. KESSLER:        Here.

21             MR. KEHOE:       Mr. Bianchi?

22             MR. THOMAS BIANCHI:           Here.

23             MR. KEHOE:       Mr. Cantrell?

24             MR. KELLAN CANTRELL:            Here.




                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 4 Original page ↗

                                                            Page 4
1    May 5, 2026

 2            MR. KEHOE:       Mr. McKinley?

 3            MR. PETER MCKINLEY:           Here.

 4            MS. KNICKERBOCKER:           So, Ms. Timko is

 5   absent. Mr. Cantrell is promoted to the full

 6   board. And the deputy town attorney, Michael

 7   Cunningham, is joining us on Zoom.

 8            MR. KESSLER:        Okay, thank you, Chris. We

 9   have no changes to the agenda this evening. Can I

10   please have a motion to adopt the minutes from

11   our April 7th meeting?

12            MR. BIANCHI:        So moved.

13            MR. MCKINLEY:          Second.

14            MR. KESSLER:        Second. Thank you. On the

15   question, all in favor?

16            MULTIPLE:       Aye.

17            MR. KESSLER:        Opposed? All right. The

18   first item tonight is a resolution. It’s the

19   application of Raphael Triana of High Question

20   Electric for renewal of a specialty trade

21   contractor special permit for an electrical

22   contractor located at 1 Dogwood Road. Drawings

23   dated April 5, 2022. Kevin.

24            MR. KOBASA:        I’d like to make a motion



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 5 Original page ↗

                                                            Page 5
1    May 5, 2026

 2   to adopt resolution 9-26 for this special permit.

 3               MR. KESSLER:     Thank you. Second, please.

 4               MS. HILDINGER:      Second.

 5               MR. MCKINLEY:      Second.

 6               MR. KESSLER:     Before we vote on this, we

 7   have an approving resolution for your

 8   application, and we’re all set to go. So if

 9   there’s no --

10               MS. CATHERINE BROSNAN:          We’d ask that

11   you please contact DOTS to schedule a site

12   inspection.

13               MR. RAFAEL TRIANA:        Okay.

14               MS. BROSNAN:     I think we emailed you

15   today, I’ve been trying to contact you guys.

16               MR. TRIANA:     Okay.

17               MS. BROSNAN:     So if you just reach out

18   to DOTS Engineering so we can schedule an

19   inspection.

20               MR. TRIANA:     Okay.

21               MR. KESSLER:     Okay, we’re on the

22   question.

23               MR. KOBASA:     Chris, I’m sorry. I thought

24   Chris said something.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 6 Original page ↗

                                                            Page 6
1    May 5, 2026

 2            MR. KEHOE:       Pardon me?

 3            MR. KOBASA:        I thought you were going to

 4   say something.

 5            MR. KEHOE:       No, just that I wanted to

 6   make sure that Katie wanted to get on the record

 7   that they need to get in touch with you with some

 8   permit issues at the site, and she’ll take care

 9   of that. But it’s not slowing down the planning

10   board’s action tonight.

11            MR. TIANA:       Okay. Thank you.

12            MR. KESSLER:        Thank you.

13            MR. KOBASA:        All good.

14            MR. KESSLER:        So we’re on the question.

15   All in favor?

16            MULTIPLE:       Aye.

17            MR. KESSLER:        Opposed?

18            MR. KEHOE:       So I’ll mail you the

19   approving resolution in the mail. And for the

20   time being, it says you have to come back for

21   another extension next year, but that may change,

22   and we’ll let you know if that changes.

23            MR. TIANA:       I appreciate it. Thank you,

24   everyone. Have a good night.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 7 Original page ↗

                                                            Page 7
1    May 5, 2026

 2            MR. KESSLER:        Thank you. You too.

 3            MS. BROSNAN:        Bye.

 4            MR. KESSLER:        Good luck. Next item is a

 5   public hearing adjourned from our previous

 6   meeting. It’s the application of VS Construction

 7   Corporation for site plan approval and for tree,

 8   wetland, and steep slope permits for a proposed

 9   96,850 square foot assisted living facility

10   located in the medical-oriented district at 2003

11   Crompond Road. Latest drawings, April 22, 2026.

12   Good evening, Mr. Steinmetz.

13            MR. DAVID STEINMETZ:            Good evening, Mr.

14   Chairman, members of the board. Good to see you

15   all, David Steinmetz, from the law firm of Zarin

16   and Steinmetz here representing VS Construction,

17   joined by Val and Mandy Santucci and Matt

18   Steinberg from DTS Provident, our project

19   engineers and planners. I appreciate the

20   conversation that took place at the work session.

21   And let me acknowledge that we’re aware of the

22   issues that Katie raised. We are working actively

23   with DOTS, Katie, and Mike Preziosi, as well as

24   with Chris Lapine. There are some storm water



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 8 Original page ↗

                                                            Page 8
1    May 5, 2026

 2   issues that have to be addressed and we’re going

 3   to be doing that over, over the next, I guess,

 4   several days and weeks. As far as the public

 5   hearing, Mr. Chairman, you may be surprised,

 6   we’re not going to ask that you close the public

 7   hearing tonight. We understand we need to address

 8   this. I would ask respectfully that you schedule

 9   it or adjourn it to the June date as opposed to

10   July. If we’re not ready for the June meeting

11   because there are still things being addressed

12   technically, we’ll correspond with DOTS and with

13   Chris and with Heather, and we’ll make sure that

14   you all know and we can come off that agenda.

15            Tonight, what we really wanted to do

16   briefly, and it was discussed at your work

17   session, make sure you’re all clear on the wall

18   modifications that have been made with regard to

19   the assisted living. We’ve spent a fair amount of

20   time last year on the sidewalk, and then

21   subsequently, we think we’ve come to a good

22   solution there. We want to make sure we share

23   that with you for the record.

24            Previously, there had also been some



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 9 Original page ↗

                                                            Page 9
1    May 5, 2026

 2   discussions with the board and with staff about

 3   fire department access, fire department staging.

 4   That has been, we believe, resolved. Matt’s going

 5   to speak to that. We’re happy to answer any

 6   questions, but we’re going to try to make this

 7   part of the public hearing a brief.

 8             MR. KESSLER:       Okay, thank you. Matt?

 9             MR. MATT STEINBERG:          Thank you. Matt

10   Steinberg, DTS Provident. Heather, could you

11   bring up the renderings? I think it’d just be

12   better to start with those. That kind of shows

13   everything that we’ve been working on. So one of

14   the comments that we had received, through staff,

15   through their memo, was about that retaining wall

16   at the corner, that main intersection, so what

17   we’ve done in the time since we last saw you was

18   take an opportunity to rework, that wall in

19   concert with the architect to develop essentially

20   a tiered wall that kind of wraps around that

21   corner.

22             And what this does is it consists of

23   essentially two five-foot walls with a space

24   between them. That will be, landscaped with some



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 10 Original page ↗

                                                            Page 10
1    May 5, 2026

 2   low plantings. There’s a limit of what we can do

 3   in between the tiers. But, we believe that this

 4   you know, starts to address some of the concerns

 5   with that one single wall, but still achieves

 6   what’s needed grading-wise, height-wise, and

 7   aesthetically for the landscaping. Heather, could

 8   you go to the next one?

 9               MR. KESSLER:     Can I ask you just a

10   question?

11               MR. STEINBERG:      Oh, sorry.

12               MR. KESSLER:     On the wall, I see on the

13   upper tier you have, is there fencing on the wall

14   on the upper one and not on the lower one?

15               MR. STEINBERG:      Correct. So there’d be

16   the fall protection fencing at the upper wall.

17   The lower wall, there would be, potentially, a

18   fence that just wouldn’t allow someone to climb

19   between the two tiers, as opposed to having a

20   second fence on that wall.

21               MR. KESSLER:     So there won’t be a fence

22   on the lower wall?

23               MR. STEINBERG:      We’re proposing not to

24   put one.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 11 Original page ↗

                                                               Page 11
1    May 5, 2026

 2               MR. KESSLER:        Not to. Okay. Sorry, go

 3   ahead.

 4               MR. STEINBERG:         No, that’s a good

 5   question. This is a view from essentially

 6   internal to the site, looking at that main entry,

 7   that main porte cochere. This was something that

 8   I believe you saw earlier in the process. This is

 9   essentially unchanged. Heather, could you go to

10   the next one, please?

11               So this is a new image that was part of

12   the request through the planning department. This

13   looks at the site from Route 202, looking to the

14   southwest. What you see, the paved area is the

15   emergency access for fire and for any other

16   emergencies. As part of our discussions with the

17   fire officials, they asked that that be a paved

18   surface. So what we’ve done is we’ve shown

19   essentially a 12-foot wide paved surface for the

20   fire apparatus, and then there would be

21   stabilized shoulders on the side of that to give

22   additional area should the fire truck meander

23   down that during that route. But they wouldn’t be

24   setting up on this. This is really just for



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 12 Original page ↗

                                                              Page 12
1    May 5, 2026

 2   access to the site.

 3              MR. KESSLER:        And what’s the width of

 4   that?

 5              MR. STEINBERG:         The paved section would

 6   be about 12 feet. So essentially, it’s a width of

 7   a lane for their access.

 8              MR. KESSLER:        And does the fire

 9   department have any comments as to what their

10   preferences are in terms of the gate?

11              MR. STEINBERG:         So the gate, they did

12   ask that the gate have either a horn or a siren

13   operation. So essentially, when they pull into

14   the site, they would whoop their siren, and it

15   would activate a signal, and open that gate. So,

16   the gate that the architect has shown is kind of

17   conceptual in nature. It may be a little beefier

18   because it’s going to have a mechanism in it that

19   will operate that gate.

20              MR. KESSLER:        Okay.

21              MR. STEINBERG:         Heather, could you go to

22   the next? So this is looking also on 202, about

23   halfway between that emergency access and the

24   main entry road, so the Conklin intersection,



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 13 Original page ↗

                                                            Page 13
1    May 5, 2026

 2   looking straight at the building. Artistic

 3   license, they’re a little bit further, obviously,

 4   off the road just to get the whole image in, the

 5   whole building. But this is essentially that

 6   facade.

 7               MR. KESSLER:     And is that landscaping

 8   consistent with what you’re proposing?

 9               MR. STEINBERG:      Generally. You know, the

10   render --

11               MR. KESSLER:     In terms of the number of

12   trees and the types of trees?

13               MR. STEINBERG:      Right. Essentially

14   that’s what we’re proposing, is to have staggered

15   trees, a mix of deciduous and evergreens, and

16   we’ll continue to work with Chris and Heather on

17   the final details of that. And then the final

18   slide is -- this is now as if you’re driving up

19   the new road, the new subdivision road. So this

20   is looking at the west side of the building. This

21   image is kind of taken as if you’re standing in

22   the wetland. But again, you see that the wall on

23   the far left side is that new tiered wall, and

24   then the wall you see to the right side is kind



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 14 Original page ↗

                                                            Page 14
1    May 5, 2026

 2   of the plaza area near the front door.

 3            So hopefully those start to at least

 4   paint a better picture of the design for you.

 5   We’ve also resubmitted, the architect did some

 6   updated conceptual floor plans that were

 7   requested by DOTS and the Fire Advisory Board.

 8   Those are obviously going to continue to change.

 9   They’re very conceptual in nature, but they do

10   show essentially where a number of the egress

11   doors are located. And then obviously when they

12   get to the building permit review, eventually

13   they’ll have a much more detailed fire code

14   review as far as ingress and egress requirements.

15            MR. KESSLER:        Can you just go back one?

16   This one or is it -- yeah, this one.

17            MR. STEINBERG:         Mm-hmm.

18            MR. KESSLER:        So on the right-hand side,

19   that covered area, that’s what you’re calling the

20   garden area? Is that?

21            MR. STEINBERG:         Yeah. So the upper part

22   where you can see the covered porch area, that’s

23   an upper courtyard for residents and their

24   guests. What you see just below that, there’s a



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 15 Original page ↗

                                                               Page 15
1    May 5, 2026

 2   white strip. That’s a solid white fence. Within

 3   that would be one of the memory care gardens, so

 4   that’s fully fenced in, no access. I mean there’d

 5   be a gate for emergencies, but essentially folks

 6   in there would be safe and secure within that

 7   space.

 8               MR. ROTHFEDER:         And on the landscaping

 9   plan, on the shade trees, could you go a little

10   bit larger on them? You had three to three and a

11   half, maybe three and a half to four?

12               MR. STEINBERG:         You’d like to see three

13   and a half to four?

14               MR. ROTHFEDER:         Yeah. Thank you. The

15   ornamentals are nice, and they’re a good height.

16               MR. STEINBERG:         Okay. In terms of -- so

17   we submitted three response memos. One was to

18   planning. There was obviously a lot of stuff that

19   I’m not going over now, but planning will

20   obviously review that. We’ve submitted a response

21   to the Fire Advisory Board comments. So some of

22   the key changes were we created essentially a

23   little fire lane on the east side of the building

24   that provides a little closer access for their



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 16 Original page ↗

                                                            Page 16
1    May 5, 2026

 2   fire apparatus to set up, such that the fire

 3   truck could set up between 15 and 30 feet to the

 4   edge of the building, which is what they

 5   requested. Additional access in our maneuvering

 6   plans, we provided additional maneuvering plans

 7   to show the fire truck accessing the site from

 8   either side and circulating through. Additional

 9   access we discussed with them would be that they

10   could pull next to the porte cochere to have an

11   additional access to the roof. And then we talked

12   about that paved emergency access.

13             And then finally, we had also submitted

14   a full SWPPP and a response to Chris Lapine from

15   Labella Associates. His memo, as David mentioned,

16   we’re going to continue to talk and discuss that

17   with Chris and DOTTS as far as the additional

18   information they need so they can complete their

19   review.

20             MR. KESSLER:       And you’re referring to

21   the three, I think we received four memos from

22   you on April 22nd.

23             MR. STEINBERG:        Correct. Yeah.

24             MR. KESSLER:       Responding to DOTTS,



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 17 Original page ↗

                                                            Page 17
1    May 5, 2026

 2   Planning, and Labella.

 3               MR. STEINBERG:      Yes, correct.

 4               MR. KESSLER:     Okay. Thank you. Any

 5   questions from the board? Nothing. Staff, any

 6   comments? All right. So as we discussed at the

 7   work session, and as Mr. Steinmetz said, we’ll

 8   adjourn the public hearing. Oh, I’m sorry. It’s a

 9   public hearing. Is there anybody that wishes to

10   comment on this? I lost myself here. Any comments

11   on this application? If not, it’ll be on the

12   agenda again. So we will adjourn this, as

13   requested, to the June 2nd meeting. So, with

14   that, Nora?

15               MS. HILDINGER:      I’d like to make a

16   motion to adjourn the public hearing to the June

17   2nd meeting.

18               MR. KESSLER:     Thank you. Second, please.

19               MR. MCKINLEY:       Second.

20               MR. BIANCHI:     Second.

21               MR. KESSLER:     And on the question, all

22   in favor?

23               MULTIPLE:    Aye.

24               MR. KESSLER:     Opposed?



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 18 Original page ↗

                                                            Page 18
1    May 5, 2026

 2              MR. STEINMETZ:       Thank you. We will

 3   continue to work with staff between now and June,

 4   and we’ll get back to you if for some reason we

 5   shouldn’t be here.

 6              MR. KESSLER:      Okay. Thank you. Thank

 7   you, David.

 8              MR. STEINMETZ:       Thank you.

 9              MR. KESSLER:      Okay. Next item is a

10   public hearing, a brand new public hearing. It’s

11   the application of Mario and Wilson Alvarez for

12   amended site plan approval and for a special

13   permit for a specialty trade electrical

14   contractor for property located at 1201 Oregon

15   Road. Latest revised drawings, March 2026. Good

16   evening.

17              MR. ANDY CHUNG:       Good evening, Chairman,

18   members of the board. My name is Andy Chung, AC

19   Engineering. I’m the engineer for the applicant,

20   Mario Alvarez, for 1201 Oregon Road. Just a recap

21   of the project, 1201 Oregon Road is an existing

22   office building. It currently, there’s two

23   floors, first floor and second floor, both being

24   used as office buildings. The owner is proposing



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 19 Original page ↗

                                                            Page 19
1    May 5, 2026

 2   to keep the first floor as an office for their

 3   electrical company, and the second floor will be

 4   converted into two apartments, two bedrooms, one

 5   bathroom each.

 6            The building is served by town sewer,

 7   town water. I know there were some comments from

 8   Chris Lapine and also from the town engineer

 9   discussing about the existing septic system that

10   was there. It was abandoned before the owners

11   purchased the property. So I think it may just be

12   a matter of contacting the Board of Health just

13   to get those records that it was abandoned

14   accordingly.

15            And then, some of the other comments we

16   received today from both the town engineer and

17   the consulting engineer, we just have to digest

18   it and kind of go through those comments and

19   address each thing. I think one of the big

20   comments had to do with the retaining wall that

21   we’re proposed on replacing. When I got involved

22   with the project, I kind of inspected the wall. I

23   determined that it wasn’t suitable, so we decided

24   to redesign the retaining wall with ready rock



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 20 Original page ↗

                                                               Page 20
1    May 5, 2026

 2   blocks. So we’re going to take a look at that

 3   design and maybe scale it back, see if we can

 4   move that wall a little further in from the

 5   parking area, so we’re not disturbing the

 6   neighboring property next door. And if we have to

 7   move a catch basin that’s in the way, then we

 8   just, if we have to move it over six inches,

 9   eight inches, or a foot, whatever it is, we’ll

10   reconnect it to the existing culverts that are in

11   there.

12               And as far as everything else, I think

13   everything is pretty self-explanatory from what I

14   read in the memos. I’ll just have to go through

15   there, go through the memos, and just address

16   each of those comments.

17               MR. KESSLER:        And then, as we discussed

18   at the work session, you’re not proposing any new

19   landscaping on the site?

20               MR. CHUNG:       There is no proposed

21   landscaping. I’m going to leave it to, I guess

22   you guys are going to be doing a site visit on

23   the 14th of May. I spoke to Lisa today. So I

24   guess maybe at that time, if you determine that



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 21 Original page ↗

                                                            Page 21
1    May 5, 2026

 2   more landscaping is necessary --

 3            MR. KEHOE:       Katie, is that your site

 4   inspection?

 5            MS. BRANSON:        Yeah, that would be --

 6            MR. KEHOE:       It’ll be a staff-level site

 7   inspection.

 8            MR. CHUNG:       Okay. Sorry. Yep. Yeah, so

 9   May 14th you’ll be taking a look at the site.

10            MR. KEHOE:       I do think, though, you

11   probably should -- we’ll work with you on the

12   details, but you’d want to see some more

13   landscaping?

14            MR. MCKINLEY:         Yeah.

15            MR. KESSLER:        Yeah.

16            MR. KEHOE:       So.

17            MR. CHUNG:       Okay. I think there are some

18   existing, I think there’s roughly 20 or so small

19   arborvitae along Old Oregon Road that kind of

20   separates the top of the hill from the bottom of

21   the hill. There’s a couple of mature existing

22   trees that are staying on site in the back. And

23   then the rest of it is just really just grass

24   areas inside the parking area in the back.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 22 Original page ↗

                                                               Page 22
1    May 5, 2026

 2               MR. KESSLER:        Okay.

 3               MR. FLEMING:        So I was just going to

 4   say, so could you report back to us on that, or

 5   Katie?

 6               MS. BRANSON:        Yeah. Sure, no problem.

 7               MR. ROTHFEDER:         Okay, thanks.

 8               MR. KESSLER:        This is a public hearing.

 9   Is there anybody that wishes to comment on this

10   application at this time? Okay. So I think -- no

11   comments. As we discussed, it looks like we’ll

12   adjourn the public hearing, deal with the staff

13   at the site visit. Hopefully, at the next

14   meeting, we can close the public hearing if there

15   are no major issues, and we can have a resolution

16   prepared at the next meeting with an approval for

17   your application.

18               MR. CHUNG:       Perfect.

19               MR. KEHOE:       So yeah, that assumes there

20   are productive meetings with Chris Lapine and

21   Mike and Katie. They’ll keep me informed. You’ll

22   have to revise the drawings. If some things

23   aren’t revised, maybe they can be worked into

24   conditions of the approval. So given that there’s



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 23 Original page ↗

                                                            Page 23
1    May 5, 2026

 2   no public comment tonight, I think the board says

 3   we can hold another public hearing next month,

 4   but we don’t assume anyone will be here, so they

 5   can close it and approve it that night.

 6               MR. CHUNG:     And we’ll work on those

 7   comments, keeping in mind the deadline dates for

 8   the next meeting.

 9               MR. KESSLER:     This resolution will be

10   redone for next meeting, right? We have a

11   resolution now?

12               MR. KEHOE:     No, the next one you have a

13   resolution for.

14               MR. KESSLER:     Oh, next one. I’m sorry.

15   All right, so with that, who do we have? Nora?

16               MS. HILDINGER:      I’d like to make a

17   motion to adjourn the public hearing to the June

18   2nd meeting.

19               MR. KESSLER:     Second, please.

20               MR. KOBASA:     Second.

21               MR. KESSLER:     And on the question? All

22   in favor?

23               MULTIPLE:    Aye.

24               MR. KESSLER:     Opposed?



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 24 Original page ↗

                                                             Page 24
1    May 5, 2026

 2              MR. ROTHFEDER:        Shouldn’t we also move

 3   to have a resolution?

 4              MR. KESSLER:       Oh, I’m sorry. Yes. Thank

 5   you.

 6              MS. HILDINGER:        And I’d like to make a

 7   motion to have a resolution ready for the next

 8   meeting.

 9              MR. MCKINLEY:         Second.

10              MR. KESSLER:       Second. Thank you. And on

11   the question? All in favor?

12              MULTIPLE:      Aye.

13              MR. KESSLER:       Opposed? Thank you. Thank

14   you, Jeff.

15              MR. CHUNG:      Perfect. Thank you.

16              MR. KESSLER:       Okay. See you at the next

17   one, and good luck with the site visit. Let’s

18   see. Where are we? Here we go. Okay. Our final

19   public hearing of the evening, it’s the

20   application of Steve Basini for the property of

21   Maric Family Limited Partnership and Maric 1903

22   LLC, for amended site plan approval and special

23   permit for an automotive body and paint shop, and

24   special permit for a reduction in the required



                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 25 Original page ↗

                                                            Page 25
1    May 5, 2026

 2   number of parking spaces for the conversion of a

 3   portion of the existing storage building into an

 4   auto body repair garage to include parking layout

 5   and interior modifications for property located

 6   at 23 Arlo Lane, drawings revised March 23, 2026.

 7   Good evening.

 8            MR. STEVEN BASINI:           Good evening. Steven

 9   Basini, SJB Architecture, representing the

10   applicant. This board and staff is familiar with

11   the application, as you just summarized it very

12   well, but also we’ve gone through several memos

13   and some meetings and gone through comments. I

14   know you know what the application is about and

15   the special permits that are required. However, I

16   do know that it’s a public hearing now, and if

17   you would like me to summarize the application

18   and proposal, I will.

19            MR. KESSLER:        Please do.

20            MR. BASINI:        Thank you. So it’s

21   approximately a 16,000 square foot building. Back

22   in 2022, it was approved by this board and the

23   town for self-storage. There were two tenant

24   spaces in there. One was about 9,500 square feet,



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 26 Original page ↗

                                                            Page 26
1    May 5, 2026

 2   the other 6,300 square feet, with a demising wall

 3   in the middle. A sprinkler system was proposed

 4   and some other, bathrooms inside. At the time, it

 5   was approved, like I said, for self-storage. It

 6   was never completed. Over the last few years,

 7   permits have been extended, and the work has been

 8   ongoing. As part of this application, we’re also

 9   tidying up those open permits and getting the

10   work completed, including the sprinkler system,

11   the bathrooms, the demising walls, and the

12   interior.

13               But this application also is to convert

14   or change the use of the smaller tenant space of

15   6,300 square feet into an auto body repair shop

16   with a paint booth on the inside. The permits

17   obviously, the application is for the change of

18   use. On the outside of the building, we’re really

19   not proposing anything with the exception of

20   there’s a small entrance foyer enclosure with a

21   shed roof at the entrance to this tenant space.

22   That was actually proposed back in ‘22 to be

23   removed. We are still removing that, and we’re

24   just beautifying that front entry there a little



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 27 Original page ↗

                                                            Page 27
1    May 5, 2026

 2   bit. We’re going to be taking up some of the

 3   asphalt, putting a little planting bed, striping

 4   some lines there from the accessible spot parking

 5   space, and that’s really the extent of the

 6   outside work.

 7               The lighting is all remaining the same

 8   on the building. It meets and complies with the

 9   town ordinance, and it’s working properly. In the

10   back there are some parking spaces that would be

11   required in order to meet what we have proposed.

12   So there’ll be some grass in the back that’s just

13   in a small slope that we’ve removed and paved.

14   But no retaining walls, no other impervious

15   surfaces, or any other structures would be

16   proposed.

17               The special permit also for the parking,

18   there’s 44 spaces required for both tenant uses.

19   What we’re requesting is to propose 32 spaces.

20   For the parking garage -- for the storage alone,

21   there’s only two spaces required. It’s one per

22   10,000 square feet. On this one, it’s a one per

23   150 for the auto body. There’s six spaces

24   proposed on the inside. There’ll be lifts and a



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 28 Original page ↗

                                                            Page 28
1    May 5, 2026

 2   paint booth, so a total of about six cars at any

 3   time in the building, about four to five employee

 4   spaces. That still leaves about 22 spaces left

 5   over for vehicles on site. The proposal is to

 6   turn these vehicles around much quicker than

 7   that. They’re not doing full extensive work.

 8   They’re not doing engine repairs. It’s auto body.

 9   So the idea is to turn this around quicker. So I

10   believe that we’ve gone through with staff, and I

11   believe that the 32 is the max that we can fit on

12   that area. We have striped it all accordingly.

13            We have fire emergency egress or access

14   to the sides of the building that are required.

15   There’s really not much more else or anywhere

16   else we can fit parking without tearing up

17   landscape in the front, and I don’t think that’s

18   needed or appropriate. Again, the sprinkler

19   system would be finished as part of this

20   application, and that is allowing the parking in

21   the back, because specifically with the sprinkler

22   system, the emergency vehicles do not have to get

23   around the back of the building. So by installing

24   that sprinkler system and completing it, we are



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 29 Original page ↗

                                                            Page 29
1    May 5, 2026

 2   allowed to put another 10, 15 spaces in the back,

 3   which again meets the 32 proposed that we have,

 4   still, however, under the 44. So we’re asking for

 5   a waiver on that.

 6            I believe there’s also the signage on

 7   the property. We are proposing a sign for the

 8   auto body shop. It will be out closer to Arlo

 9   Lane in the grass area. I show it on the site

10   plan. The details of it yet, there’s a small

11   little rendering of it. It’s just schematic. I do

12   know we have to go in front of the board again

13   for that approval, but did want to show exactly

14   where it would be on the property. The site is

15   mostly surrounded, obviously, by commercial. On

16   the back, it’s woods. The bowling alley is back

17   there, and the school is off the site.

18            I mean it’s a pretty remote site over

19   there, so I don’t believe there’s really any

20   impact to surrounding properties, neighbors. The

21   sign is out there as close as possible to the

22   street only because there really is no other

23   traffic going through that can really see the

24   sign or advertise. But we’ll have a modest design



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 30 Original page ↗

                                                            Page 30
1    May 5, 2026

 2   there. It’ll go in with the environment. There’ll

 3   be some nice plantings. I think it’ll be very

 4   attractive as well. That’s the proposal.

 5            MR. KESSLER:        Are the woods on your

 6   property, part of the woods?

 7            MR. BASINI:        There’s some portion of the

 8   woods that are on the property, yes. It slopes up

 9   away on the side and the rear of the building,

10   slopes up into the woods.

11            MR. KESSLER:        And would you say the

12   condition of the site currently is pretty much

13   clear of debris and things?

14            MR. BASINI:        Yes, it is. It’s very well-

15   maintained, actually. Yeah. I mean the front area

16   right there where the utility lines are going in

17   right now has steel road plates over it, but

18   that’s all part of construction. Other than that,

19   the site’s pretty clean, yes.

20            MR. KESSLER:        Okay. All right. This is a

21   public hearing. Does anybody wish just to comment

22   on this application? Zero for three here. Any

23   comments from the board? Staff? Wow. All right.

24   So, Jeff, why don’t we take it home?



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 31 Original page ↗

                                                            Page 31
1    May 5, 2026

 2               MR. ROTHFEDER:      I move that we close the

 3   public hearing and approve resolution 10-26.

 4               MR. KESSLER:     Second, please.

 5               MR. KOBASA:     Second.

 6               MS. HILDINGER:      Second.

 7               MR. KESSLER:     And on the question? All

 8   in favor?

 9               MULTIPLE:    Aye.

10               MR. KESSLER:     Opposed? All right. You’re

11   approved. Good luck.

12               MR. KEHOE:     So, Steve, we’ll be emailing

13   you the resolution in the next day or two.

14               MR. BASINI:     Okay.

15               MR. KEHOE:    Several, I didn’t share a

16   copy with you beforehand. Several engineering

17   comments have been added. They’re technical in

18   nature. They’re nothing too much.

19               MR. BASINI:     Understood.

20               MR. KEHOE:    Okay.

21               MR. BASINI:     Okay. Appreciate your time.

22   Thank you very much. Have a good night.

23               MR. KESSLER:     Thank you. All right, on

24   to old business, first item is the application of



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 32 Original page ↗

                                                            Page 32
1    May 5, 2026

 2   70 Roa Hook Realty for site development plan

 3   approval to redevelop the site of the partially

 4   constructed Crystal Clean Car Wash facility to a

 5   proposed vehicle showroom and service facility

 6   for property located at 70 Roa Hook Road.

 7   Drawings revised March 25, 2026. Good evening.

 8            MR. BRAD SCHWARTZ:           Good evening, Mr.

 9   Chairman, members of the board, and staff, Brad

10   Schwartz from Zarin and Steinmetz, representing

11   the applicant. Thank you all for coming out to

12   the site visit last week. I thought it was

13   productive. You got to see the 30-foot truck

14   maneuver, the site. We had a good Zoom call with

15   staff on some final, hopefully technical, items

16   on the site plans that our team is revising. To

17   answer the question that came up at the work

18   session about the left turns, yes, our client

19   will continue to make left turns into the site,

20   subject to the same restrictions that were

21   applied to the car wash, prohibiting left turns

22   between 7:00 and 9:00 in the morning and 4:00 to

23   6:00 in the afternoon. DOT had imposed that as

24   part of the car wash application. We are not



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 33 Original page ↗

                                                            Page 33
1    May 5, 2026

 2   seeking to relax those requirements as part of

 3   this application. John Gilchrist is here if you

 4   would like an update on storm water in response

 5   to the county comment.

 6            MR. KESSLER:        Yeah, I think that’s the

 7   important issue, one of the last issues.

 8            MR. SCHWARTZ:         Yep.

 9            MR. JOHN GILCHRIST: Good evening. John

10   Gilchrist, architect. There is indeed a large

11   water recycling system consisting of tanks,

12   reclamation tanks, and settling tanks built on

13   the site. It’s underground. The carwash uses a

14   lot of water. We were recycling as much as 90

15   percent of the wash water. And as I say, it goes

16   into a series of settling tanks, and then it’s

17   filtered and then reused for washing the cars.

18   That was augmented by rainwater and well water.

19   The 10 percent that we lose to evaporation and

20   cars, wet cars leaving the site is lost wash

21   water that we reclaim with well water and

22   rainwater. The idea that this is storm water

23   detention is not true. This is recycled wash

24   water. The current drainage system collects all



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 34 Original page ↗

                                                            Page 34
1    May 5, 2026

 2   of the runoff from the parking lot and conducts

 3   it to a oil water separator that was part of the

 4   car wash project, and we will continue to use

 5   that. And then it’s conducted under the highway

 6   into the river.

 7            Generally, detention is used to prevent

 8   flooding. We use a detention system to detain the

 9   water on the site to keep it from overwhelming

10   the existing drainage systems. But the Hudson

11   River, the Anneville Creek are tidal. They rise

12   and drop daily with the tides, and we’re not in

13   danger of flooding that river or exacerbating any

14   flooding with our runoff. So that’s why we don’t

15   have, and we were approved without, storm water

16   detention. So, we’re continuing to -- we’re not

17   changing the amount of impervious coverage, and

18   we’re not proposing to change the existing

19   drainage system.

20            MR. KOBASA:        So is there anything that -

21   - you’re basically, it goes into an oil water

22   separator and then just direct dumps?

23            MR. GILCHRIST:         Yes.

24            MR. KOBASA:        So there’s no treatment to



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 35 Original page ↗

                                                            Page 35
1    May 5, 2026

 2   it whatsoever?

 3               MR. GILCHRIST:      Excuse me?

 4               MR. KOBASA:     There’s no treatment? Like

 5   it’s no filtering, it’s going into a pipe and

 6   then out.

 7               MR. GILCHRIST:      Yes.

 8               MR. KOBASA:     So all of these trucks, all

 9   of the oil or whatever’s dripping on the ground

10   from underneath them, if there’s leaks or

11   anything, that just washes into the ground and

12   then out directly into the circle?

13               MR. GILCHRIST:      The trucks inside the

14   building, there are oil water separators. There

15   will be oil water separators inside the building

16   to separate out any oils that drip. If there’s

17   trucks that drip on the parking lot, would be not

18   much different from any other parking lot that we

19   would encounter. And the oil water separator is

20   an extra step at protecting the river.

21               MR. KOBASA:     But there’s no detention

22   that allows for infiltration on-site at all?

23               MR. GILCHRIST:      No.

24               MR. KEHOE:    Katie, can you, I don’t know



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 36 Original page ↗

                                                             Page 36
1    May 5, 2026

 2   --

 3               MR. KOBASA:      Sorry. Storm, new storm

 4   water rules.

 5               MR. KEHOE:     -- there’s a basin there.

 6   Well, there is a basin there, isn’t there, Katie?

 7               MS. BROSNAN:      So, there is a basin

 8   there, but that would be on the Camp Smith

 9   property.

10               MR. KESSLER:      Katie, why don’t you get

11   closer to microphone?

12               MS. BROSNAN:      Oh. So, there is a basin

13   there, but it is on the Camp Smith property.

14               MR. KESSLER:      Right.

15               MS. BROSNAN:      Which is, to your point,

16   Kevin, is an issue. So that hasn’t been sorted

17   yet, correct.

18               MR. GILCHRIST:       It’s being sorted out,

19   yes.

20               MR. KEHOE:     But my understanding, what

21   we saw on the site inspection, is there’s a pipe

22   that discharges from your site into that basin.

23               MR. GILCHRIST:       No, there’s not.

24               MR. KEHOE:     Okay.



                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 37 Original page ↗

                                                            Page 37
1    May 5, 2026

 2               MR. GILCHRIST:      Our site is completely

 3   contained. The Camp Smith work is completely

 4   separate.

 5               MR. KEHOE:    So, but I think I did see a

 6   pipe, but that’s dealing with Camp Smith runoff?

 7               MR. GILCHRIST:      There’s a pipe from the

 8   pond. There’s a pond there, and then there’s a

 9   pipe that conducts, if that pond were to fill,

10   conducts that out towards the highway, and it

11   would, it would then there’s a swale along the

12   highway that conducts that to the north under a

13   residential driveway, and then out to the river.

14               MS. BROSNAN:     And so this was all

15   checked like on the site visit, and it’s been

16   mapped out and surveyed, is that correct?

17               MR. GILCHRIST:      Yes.

18               MS. BROSNAN:     Been inspected?

19               MR. GILCHRIST:      Yes, yes, yes.

20               MS. BROSNAN:     Okay.

21               MR. GILCHRIST:      It’s completely and

22   absolutely separate from our project. The former

23   owner of the property did the work on his own,

24   and we are sorting through it with Camp Smith and



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 38 Original page ↗

                                                            Page 38
1    May 5, 2026

 2   the Department of Transportation.

 3            MS. BROSNAN:        So this is what I had

 4   mentioned at the work session, that we wanted to

 5   make sure, have the engineer or architect verify

 6   what was actually out there so we can assess it

 7   more closely, Kevin.

 8            MR. KOBASA:        Okay. Yeah. I have concerns

 9   about the fact that this entire impervious site

10   just dumps directly into the Annesville Creek

11   with no filtration of water in any way

12   whatsoever. So, I think you should look at some

13   green practices.

14            MR. KEHOE:       And that’s consistent with

15   the county’s recommendations.

16            MR. KESSLER:        Mm-hmm.

17            MR. GILCHRIST:         It’s something we can

18   consider, something we would have to add. But

19   currently, no, that’s not on the plan.

20            MR. KOBASA:        I understand that. I’m

21   asking you to look at it, because that’s a

22   natural resource directly across the river. This

23   is a huge, paved area. I have no idea how they

24   even got away with that in the beginning, but I



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 39 Original page ↗

                                                            Page 39
1    May 5, 2026

 2   do know that storm water rules have changed.

 3               MR. GILCHRIST:      All right.

 4               MR. KOBASA:     DEC is paying attention,

 5   like I’m amazed that DEC is just allowing someone

 6   to let this water to discharge straight to it

 7   without any sort of filtration.

 8               MR. KEHOE:     The applicant is on Zoom,

 9   Mauricio. He’s raised his hand, so we’re going to

10   promote him.

11               MR. KESSLER:     Okay.

12               MR. KEHOE:     Can you hear us? We can’t

13   hear you.

14               MR. MAURICIO:      Can you hear me now?

15               MR. KEHOE:     Yep.

16               MR. MAURICIO:      Good afternoon,

17   everybody. Thank you for me to be in this

18   meeting. So just to add a little bit to what John

19   just mentioned, we have a number of locations,

20   five of them, already in the New York area. This

21   will be the number six. In the 15 years that I’ve

22   been doing this in New York and I never had a

23   truck outside the parking lot just dripping

24   excessive amounts of oil irresponsibly. And



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 40 Original page ↗

                                                            Page 40
1    May 5, 2026

 2   usually the trucks come in on a schedule, right?

 3   They just come in into the shop, and if they’re

 4   dripping oil, we put a basin under the truck

 5   because we know and we understand the

 6   consequences of not doing so. I understand that,

 7   the concern of the member of the board, but I can

 8   assure you that we take this very seriously. Our

 9   job is to prevent, of course, any damage to the

10   environment, and we do anything in our power to

11   contain that possibility. So trucks, when trucks

12   come in for electrical work, they usually don’t

13   have any oil dripping or leaking from the

14   engines. We do not do oil changes in the

15   property. We do not generate dirty oil. If we had

16   to change an engine completely, we just swap

17   engines. So the use of oil, whether it’s dirty or

18   new, it’s very minimal.

19            MR. KOBASA:        Sorry. Oil may have been a

20   bad example, but you have tires that are going to

21   be turning. You’re going to have rubber being

22   ground into the asphalt. Your first flush is

23   going to send all of that into the Annesville

24   Creek. So that is my concern.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 41 Original page ↗

                                                            Page 41
1    May 5, 2026

 2            MR. MAURICIO:         Well, let me -- and I

 3   think it’s valid. However, the number of vehicles

 4   that we’re going to have in this location during

 5   any given week, it will be limited to what John

 6   and Brad, 14 vehicles, I think that was the

 7   number that we presented. While you guys had

 8   approved the use of a car wash with God knows how

 9   many vehicles going to the car wash daily. I

10   don’t know, 200, 300, 400? And again, I

11   understand what you’re telling me, but --

12            MR. ROTHFEDER:         Maybe we made a mistake

13   back then.

14            MR. MAURICIO:         -- if you have any

15   considerations that you would like us to take a

16   look at, I’ll be happy to address them, for sure.

17            MR. KOBASA:        Sorry. Yeah, I was not part

18   of the board back then, and I’ve given you my

19   considerations that I want you to look at.

20            MR. ROTHFEDER:         No, I think Kevin is on

21   to something. And I just don’t know that we can

22   answer that question. We really need guidance

23   about that.

24            MR. KOBASA:        Yeah.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 42 Original page ↗

                                                             Page 42
1    May 5, 2026

 2             MR. ROTHFEDER:         I mean it’s Annesville

 3   Creek, we all want to take care of it, and

 4   arguing about it is not going to do it. So can

 5   you guys help out?

 6             MS. BROSNAN:        We can definitely look at

 7   it again now that we have this information that

 8   he’s confirmed the drainage, and they’re still

 9   working on the Camp Smith side of things to

10   ensure that they are not connected and that they

11   are separate. So we need to have all the

12   information before we can make determinations, of

13   course.

14             MR. ROTHFEDER:         Yeah, because I’m

15   concerned. I mean Kevin’s right, and I’m

16   concerned that while we believe you, what you’ve

17   just told us, to the applicant, we can’t go on

18   that. We can’t go on that you’re not going to do

19   something wrong.

20             MR. MAURICIO:         I get that, but do you

21   guys have the number of vehicles that transit

22   through that stretch any day in a given basis?

23   What do I say, 1,000 trucks or 1,000 vehicles a

24   day?



                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 43 Original page ↗

                                                            Page 43
1    May 5, 2026

 2            MR. KOBASA:        Are you talking about

 3   within the right of way?

 4            MR. MAURICIO:         On the right of way.

 5            MR. KOBASA:        Yeah, that’s not our

 6   purview right now. We’re not talking about the

 7   right of way, so --

 8            MR. MAURICIO:         I understand that, but

 9   the damage that those could potentially cause.

10            MR. KOBASA:        I agree with it, and I’m

11   not okay with that either, but I can’t force DOT

12   or anyone to do that. Our purview is this site

13   plan right before us, and that’s why we’re

14   raising our concerns. So we can keep arguing it

15   here, or you can have the engineer, our

16   engineering look at it, and you guys can work it

17   out with them.

18            MR. MAURICIO:         Yeah, I agree with that.

19            MR. KESSLER:        Okay. So, the plan here,

20   okay, so you guys will meet, but in the meantime,

21   we hope to, we’ll set up the public hearing.

22   Hopefully, you can resolve this, and we can close

23   it out at the next meeting. If not, we’ll have to

24   extend it over, but that’s --



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 44 Original page ↗

                                                            Page 44
1    May 5, 2026

 2            MR. GILCHRIST:         Yes. That’s fine.

 3            MR. KESSLER:        So the ball’s in your

 4   court to get this resolved so that we can have an

 5   effective public hearing next time. Any more

 6   comments from the board?

 7            MR. ROTHFEDER:         Same issue about the

 8   green technology that the Westchester Planning

 9   Board brought up. We’d like you to look into that

10   and come back with some kind of recommendation if

11   it makes sense and if it doesn’t, but if it

12   doesn’t, tell us and why.

13            MR. GILCHRIST:         Certainly.

14            MR. ROTHFEDER:         Thank you.

15            MR. KESSLER:        Okay. Any last call? So,

16   with that, who do we got? Peter.

17            MR. MCKINLEY:         Mr. Chairman, I’d like to

18   make a motion to open a public hearing for the

19   PB2025-18, 70 Roa Hook Realty LLC and schedule

20   that for June 2nd at 5:00 p.m.

21            MR. BIANCHI:        Second.

22            MR. CANTRELL:         Second.

23            MR. KESSLER:        Wait, I’m sorry.

24            MR. KEHOE:       6:30.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 45 Original page ↗

                                                             Page 45
1    May 5, 2026

 2             MR. KESSLER:        On the question?

 3             MR. KEHOE:       That’s not the site

 4   inspection.

 5             MR. MCKINLEY:          Yeah, I’m sorry. That was

 6   my error, my bad.

 7             MR. KESSLER:        So we’ve got it our next

 8   meeting on June 2nd. I’m sorry. Do we have a

 9   second on the question?

10             MS. HILDINGER:         Second.

11             MR. KESSLER:        And all in favor?

12             MULTIPLE:       Aye.

13             MR. KESSLER:        Opposed?

14             MR. SCHWARTZ:         Have a good night. Thank

15   you.

16             MR. KESSLER:        Thank you. Okay. All

17   right. Next item under old business, it’s the

18   application of VS Construction for site

19   development plan approval and for steep slope and

20   tree removal permits for a proposed 9,600 square

21   foot commercial building located on future parcel

22   three within the medical oriented district for

23   property located at 2003 Crompond Road, drawings

24   revised March 25, 2026. Matt?



                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 46 Original page ↗

                                                            Page 46
1    May 5, 2026

 2              MR. STEINBERG:       Hi, good evening, Mr.

 3   Chairman, members of the board, Matt Steinberg,

 4   DTS Providence, here representing VS

 5   Construction. So, we understand the planning

 6   board obviously went on a site visit recently of

 7   the site. I had a chance to inspect the site. We

 8   are also in receipt of an engineering memo from

 9   Labella Associates that we’ll be working to

10   address.

11              First, I just wanted to, I guess,

12   clarify a couple of things that kind of came up

13   during the work session. So the MOD zoning, the

14   code does allow the board to require additional

15   landscaping within that non-disturbance buffer

16   area. So that is something that the board has the

17   authority to require. We do anticipate adding

18   additional landscaping within that. What we are

19   waiting for, as I think Chris mentioned, is the

20   tree inventory is currently being conducted. We

21   expect that hopefully mid this month, so we’ll

22   have a better sense of what the existing trees

23   are, what their conditions are, which trees maybe

24   just because they’re either perhaps a hazard or



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 47 Original page ↗

                                                            Page 47
1    May 5, 2026

 2   something would have to come down, or perhaps

 3   they might be diseased. So we’ll see what those

 4   are. We’ll see where we can plant additional

 5   trees and landscaping within that area. So we

 6   understood, we heard, we obviously saw it

 7   together, the distance between the property and

 8   the neighbor.

 9            So the 30-foot non-disturbance area is

10   within our property. The adjacent residence was

11   about 60 feet beyond that. So it’s a total of 90

12   feet between the back of the building, proposed

13   back of the building and that residence.

14            We’ve also, in the latest set of plans

15   that we submitted, we also worked to pull the

16   building a little bit further forward, a few

17   feet, so that that retaining wall isn’t right on

18   that 30-foot non-disturbance line. We can

19   accomplish to build a wall. It’s a different type

20   of wall that would be constructed. It would have

21   a larger footing, it would have a gravity footing

22   that perhaps would go forward more into our site

23   to support that wall. But it is achievable to

24   create a wall not in that disturbance area, and



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 48 Original page ↗

                                                            Page 48
1    May 5, 2026

 2   that’s why we also pulled it back to provide a

 3   little bit more room to do that.

 4            One of the reasons why we had discussed

 5   with planning staff about moving the building to

 6   the rear of the property, is so that that rear of

 7   the building can act as part of the retaining

 8   wall, meaning you’d have less retaining wall

 9   visible, because the building itself is acting as

10   a part of that retaining wall.

11            During earlier reviews when the building

12   was pushed forward, that was at a point where I

13   think there were different uses proposed. Now

14   that it’s essentially a pharmacy or medical

15   office, there’s really nothing that -- the

16   building wouldn’t face Crompond. You would

17   essentially be looking at the rear of the

18   building if it was pushed forward. But I’m happy

19   to answer any questions as well.

20            MR. KESSLER:        Yeah, I’ve got -- so let’s

21   just talk hypothetically here. If we were to

22   approve this tomorrow, and the assisted living

23   tomorrow, is the intention to then build both of

24   those before the townhouses are approved?



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 49 Original page ↗

                                                              Page 49
1    May 5, 2026

 2              MR. STEINBERG:         So the MOD zoning

 3   requires that one of those two buildings be

 4   constructed ahead of the townhomes. One of the

 5   medical uses needs to have been built prior to a

 6   residential use.

 7              MR. KESSLER:        I did not know that.

 8              MR. STEINBERG:         Yes, so one of those two

 9   buildings will be in the earlier phase.

10              MR. KESSLER:        Okay, so let’s assume the

11   assisted living is built and then this one is

12   approved. Would you then build this one, the

13   commercial building? Is that --

14              MR. STEINBERG:         That’s something that VS

15   Construction is looking at, but --

16              MR. KESSLER:        I guess what I’m getting

17   at is there’s a lot of excavation that’s going to

18   take place to build that. Was that planned to go

19   on other parts of the property or trucked off the

20   site?

21              MR. STEINBERG:         So to the extent that we

22   can move it to other sites of the property to be

23   used for filling, we would. There would still

24   probably be a net export from the site. Now, this



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 50 Original page ↗

                                                            Page 50
1    May 5, 2026

 2   building is a smaller building. It’s obviously,

 3   the assisted living is a much more complex --

 4            MR. KESSLER:        Sure.

 5            MR. STEINBERG:         -- building. It’ll

 6   probably take a lot longer to, one, after

 7   approvals, to have its construction documents

 8   prepared, to get through building permits. So

 9   this building is probably the quicker.

10            MR. KESSLER:        Yeah.

11            MR. STEINBERG:         If I can use that word,

12   to get through construction documents.

13            MR. KESSLER:        Yeah. Okay, I understand

14   that, but, I mean not for me to say, really, but

15   it would seem that that building is being built

16   to help, poor choice of terms, assist the

17   assisted living, you know, in terms of having

18   medical offices as well as a pharmacy or

19   something.

20            MR. STEINBERG:         Right. The assisted

21   living would also qualify for that as well. So

22   the assisted living could also satisfy that

23   requirement. But it’s obviously a much bigger

24   building to get through the process.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 51 Original page ↗

                                                               Page 51
1    May 5, 2026

 2               MR. KESSLER:        Okay.

 3               MR. KEHOE:       So yeah, so the language of

 4   the MOD actually says no certificate of occupancy

 5   shall be issued for a non-medical structure

 6   before the medical structure use receives a CO.

 7               MR. KESSLER:        Okay. That’s news. Okay.

 8   Any comments from the board or --

 9               MR. KOBASA:        I just have, that 30-foot

10   non-disturbance, you said you’re planning to

11   plant that, right?

12               MR. STEINBERG:         We’ve been discussing,

13   right?

14               MR. KOBASA:        Okay.

15               MR. STEINBERG:         That there would

16   probably be, to infill the planting, right?

17               MR. KOBASA:        Okay.

18               MR. KESSLER:        You’re planning to go to

19   the town board to get permission to plant in the

20   buffer?

21               MR. KEHOE:       Well, we’re not sure --

22               MR. KOBASA:        I guess that’s my question.

23   Does planting count as disturbance?

24               MR. STEINBERG:         So I believe the



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 52 Original page ↗

                                                            Page 52
1    May 5, 2026

 2   planting, and my understanding is that the

 3   planting is something that the planning board may

 4   require additional landscaping or screening,

 5   including --

 6            MR. KEHOE:       We’re not sure Matt is

 7   reading the section the same way we would read

 8   that section.

 9            MR. KOBASA:        Okay. I guess what I’m

10   ultimately getting at is if you do end up

11   planting there, explore a plant palette that

12   doesn’t just focus on screening immediately, but

13   gets in different levels of plants so that you’re

14   building an understory, a mid-story in there, and

15   not just come in and put as big of the trees that

16   you can fit in there. You’ll get further from

17   that. It’ll extend the life of the screening a

18   lot longer than if you come in and just put the

19   biggest things possible in there. You’ll probably

20   have better succession too if you use some

21   smaller caliper container stuff.

22            MR. STEINBERG:         Yep, understood. No. And

23   then, yeah, we’ll have the discussion with staff

24   about what’s permitted.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 53 Original page ↗

                                                             Page 53
1    May 5, 2026

 2             MR. KESSLER:        But as we discussed at the

 3   work session, you agree with staff that there

 4   will be some encroachment in the 30-foot buffer

 5   to build the building?

 6             MR. STEINBERG:         Our anticipation is that

 7   we do not need to do that. We’re trying, we’re

 8   working on a plan so that that’s not required.

 9             MR. KEHOE:       And one thing that I think

10   was noticed at the site inspection, but is

11   definitely on the plan there, that you can see

12   that access road to this commercial parcel, those

13   fingers that come up is actual wetland. Correct?

14             MR. STEINBERG:         That’s the wetland.

15             MR. KEHOE:       That’s not wetland buffer,

16   that’s actual wetland.

17             MR. STEINBERG:         That is the wetland,

18   yes.

19             MR. KEHOE:       Yes. And then that’s one of

20   the issues, is that the town board adopted

21   findings with respect to those wetland impacts,

22   subject to now I guess you’re going to get a new

23   Corps permit?

24             MR. STEINBERG:         Right, because the



                        Geneva Worldwide, Inc.
            228 Park Ave S - PMB 27669. New York, NY 10003

Page 54 Original page ↗

                                                              Page 54
1    May 5, 2026

 2   wetland that was delineated during that process

 3   and what was delineated recently by Labella do

 4   not match so, essentially the impacts to build

 5   that road, that driveway between those two

 6   wetlands is very similar. It actually might be a

 7   little bit less, I think I presented at last

 8   meeting, under the Labella line.

 9              MR. KESSLER:        Okay.

10              MR. STEINBERG:         What is different is our

11   mitigation area in the southern part of the site.

12   It was adjacent to a previously delineated

13   wetland, and now that doesn’t necessarily line up

14   with the new wetland line. So if we’re going to

15   move some of that wetland mitigation, we believe

16   we have to go back to the Corps and discuss that

17   with them, and have that modified around this new

18   wetland.

19              MR. KESSLER:        Just to be clear, as

20   originally proposed, the wetland mitigation was

21   supposed to happen on the town home part of the

22   site?

23              MR. STEINBERG:         Correct. Yes. So the

24   intention is obviously we’ll still maintain the



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 55 Original page ↗

                                                               Page 55
1    May 5, 2026

 2   same amount of mitigation, but we’re going to

 3   probably have to modify kind of where that goes.

 4               MR. KESSLER:        Okay.

 5               MR. STEINBERG:         Around the new wetland

 6   boundary. So that’s something that we’re going to

 7   discuss with the Army Corps.

 8               MR. KESSLER:        Okay. But that creates

 9   this chicken and egg issue about the town homes

10   and the impact on the town homes with the wetland

11   mitigation.

12               MR. STEINBERG:         Yes. So we’ll be

13   presenting that when we come with the town homes,

14   which we’re planning to do shortly. We’ll show

15   the proposed mitigation --

16               MR. KESSLER:        Okay. Okay.

17               MR. STEINBERG:         -- to the board.

18   Obviously, the board also has a wetland permit to

19   issue.

20               MR. KEHOE:       Yeah, I was going to mention

21   that. Even though the town board environmentally

22   analyzed this and adopted findings, you still

23   have to issue the permit.

24               MR. KOBASA:        Right.



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 56 Original page ↗

                                                               Page 56
1    May 5, 2026

 2               MR. STEINBERG:         And we typically will be

 3   running those concurrently while we’re before a

 4   planning board and an Army Corps. In this

 5   instance, because we were before the town board,

 6   it happened at that time, but it’ll happen now

 7   before the board.

 8               MR. KESSLER:        Okay. Any further comments

 9   from the board or staff?

10               MR. MCKINLEY:         Matt, along Lafayette

11   there’s an access road where the elevation is

12   pretty steep to the road. Was that also discussed

13   in further meetings this week?

14               MR. STEINBERG:         So we’re looking at

15   that. So that’s another emergency access to the

16   site so one of the comments, I think from

17   Labella, was about the slope of that, so we’ll

18   take another look. I believe we tried to design

19   so that it was the maximum ten percent, but we’ll

20   confirm that.

21               MR. KESSLER:        I think the fire

22   department also was a concern about the slope,

23   right?

24               MR. STEINBERG:         They had raised that on



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 57 Original page ↗

                                                            Page 57
1    May 5, 2026

 2   the other, on parcel one.

 3             MR. KESSLER:       Oh.

 4             MR. STEINBERG:        So actually, we have not

 5   heard back from them on this parcel. But because

 6   we had talked to them about parcel one, we were

 7   taking some of the stuff we learned about that

 8   from them on that one and tried to apply it here

 9   in terms of circulation.

10             MS. BROSNAN:       This was forwarded into

11   the fire department, and we have received their

12   memo --

13             MR. STEINBERG:        Okay.

14             MS. BROSNAN:       -- which I can give to

15   Chris to give to you guys.

16             MR. STEINBERG:        Okay. Yeah. We’ll review

17   that, certainly.

18             MR. KESSLER:       Okay, great.

19             MR. MCKINLEY:        And the other comment, it

20   was very apparent being on the site visit, and

21   thank you for addressing some of those things,

22   but it feels very close, as you’ve indicated. So

23   that is important to me, I’m sure, and making

24   some provisions to move it slightly forward or



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 58 Original page ↗

                                                            Page 58
1    May 5, 2026

 2   maybe giving us the options are helpful to see

 3   that. Because it really doesn’t translate, and

 4   I’ve been on site visits where it’s much less

 5   apparent, and this one was pretty jarring.

 6            MR. STEINBERG:         Right.

 7            MR. MCKINLEY:         The elevation helps, but

 8   I mean it looks like it’s my neighbor. That’s how

 9   close it is.

10            MR. STEINBERG:         Right. And I’ll clarify,

11   we tried to move it a few feet forward. You can

12   kind of see there’s a dashed line behind the

13   building. Beyond that, we really can’t move the

14   building much because then, as you can see, this

15   site is not very deep. So between the 30-foot

16   frontage, so the right of way goes back quite a

17   bit, and then there’s the 30-foot front yard

18   setback. And then we have our site, and then we

19   have this 30-foot non-disturbance, which means we

20   can’t even really grade into that area. So we’re

21   really tight, so really the building can be in

22   one of two places. It’s in the back with the

23   parking in the front, or the reverse.

24            In discussions, it seemed like we could,



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 59 Original page ↗

                                                            Page 59
1    May 5, 2026

 2   by pushing the building to the back, not only

 3   could we use it as the retaining wall, but our

 4   screening could then do more. Like it’s closer to

 5   you, so then our screening would be more

 6   effective in some ways than if the building were

 7   further out, and someone would be actually

 8   looking more over it or towards it.

 9            MR. KESSLER:        I know what the answer’s

10   going to be, but let me ask it anyway. Are you

11   locked into 9,600 square feet for the building?

12            MS. HILDINGER:         My question, too.

13            MR. STEINBERG:         I’ll have to talk to VS

14   Construction about that size. Yeah. Right now

15   it’s based on their discussions. Originally, it’s

16   a 10,000 square foot maximum, which was

17   permitted.

18            MR. KEHOE:       Well --

19            MR. KESSLER:        Oh, this was from the MOD

20   approval by the town board?

21            MR. STEINBERG:         Right. And part of their

22   discussions with potential pharmacy operators and

23   medical office users, it kind of worked out to be

24   8,000 square feet of pharmacy and then 1,600 of



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 60 Original page ↗

                                                            Page 60
1    May 5, 2026

 2   medical office.

 3               MR. KESSLER:     Okay, great. I appreciate

 4   it. Thank you. Any final questions? So if not,

 5   Kellan.

 6               MR. CANTRELL:       Chairman, I’ll make a

 7   motion to refer this back to staff.

 8               MR. KESSLER:     Second, please.

 9               MS. HILDINGER:      Second.

10               MR. KESSLER:     And on the question, all

11   in favor?

12               MULTIPLE:    Aye.

13               MR. KESSLER:     Opposed? Okay.

14               MR. STEINBERG:      Thank you very much.

15               MR. KESSLER:     Thank you very much. All

16   right, next item under old business, the

17   application for New York-Presbyterian Hudson

18   Valley Hospital Center for amended site plan

19   approval for a proposed 1,877 square foot

20   addition to the existing medical office building

21   for a linear accelerator for property located at

22   1980 Crompond Road, drawings dated March 12,

23   2026. Good evening.

24               MS. CATHERINE ZALANTIS:          Good evening,



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 61 Original page ↗

                                                            Page 61
1    May 5, 2026

 2   Mr. Chairman and board members, Catherine

 3   Zalantis from Silverberg Zalantis LLP,

 4   representing the applicant, New York-Presbyterian

 5   Hudson Valley Hospital Center. We did receive

 6   comments from staff and we’ve already provided,

 7   with respect to the outdoor lighting comments, a

 8   revised plan to address those lighting comments

 9   and revised specifications. As requested in item

10   two, a full-sized site-wide parking plan that

11   includes both the proposed ADA improvements and

12   the proposed improvements to Lot E, which is in

13   the northern part of the site, will be provided.

14   We anticipate providing that by next week.

15               Regarding the request to update the

16   board on the wetland mitigation conditions, we

17   will respond in writing. But I can advise the

18   board tonight that the hydrodynamic separator has

19   been installed, and the required 30 wetland

20   mitigation plantings have also been installed.

21   Five of those did not survive the winter, and

22   those are planned to be replaced this week by the

23   hospital.

24               Regarding the open permits, the



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 62 Original page ↗

                                                            Page 62
1    May 5, 2026

 2   hospital’s committed to working through and

 3   moving to close out all the open permits. Nine

 4   are for active construction jobs, five are in

 5   closed out and will be closed out with the town.

 6            Nine are very old, between 2008 and

 7   2016, and predate the current administration.

 8   Hospital’s going to coordinate with the building

 9   department to determine the permit holder so that

10   those permits could be closed out. And the

11   hospital believes, through its investigation of

12   the permits, two are duplicate permits.

13            The hospital also provided a parking

14   demand study. This was required as a condition of

15   the Citron lot site plan approval, which was

16   Resolution 22 of 2000. But the good news is it

17   shows that there’s excess parking capacity on the

18   site, over 200 spaces, more than sufficient

19   parking capacity.

20            Also regarding potential impacts on

21   traffic, I just want to remind the board that

22   this is a one-for-one replacement of the LINAC

23   equipment. There is no new patients or staff that

24   will be operating. The old LINAC, which is the



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 63 Original page ↗

                                                            Page 63
1    May 5, 2026

 2   older technology, is going to be decommissioned,

 3   removed, and that space turned into storage. And

 4   then the new addition will have the new LINAC

 5   machine with the better technology, so there’ll

 6   be no increase in patients or staff, straight

 7   one-for-one replacement. The issue is that the

 8   existing LINAC machine is really near its end of

 9   life, and it’s critical to be able to continue to

10   provide this cancer radiation treatment to the

11   hospital’s patients.

12            We heard the board’s preference during

13   the work session to schedule a public hearing. We

14   would just request that at the same time the

15   board direct its staff to prepare a draft

16   resolution of approval if it’s appropriate to

17   close the public hearing at the June meeting.

18            MR. KESSLER:        That is our intent.

19            MS. ZALANTIS:         Thank you.

20            MR. KESSLER:        So, before we do that, any

21   comments? No. If not, Kevin.

22            MR. KOBASA:        I’d like to make a motion

23   to set a public hearing for the June meeting on

24   6/2, and have the staff prepare a resolution.



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 64 Original page ↗

                                                            Page 64
1    May 5, 2026

 2               MR. KESSLER:     Second, please.

 3               MR. CANTRELL:       Second.

 4               MR. KESSLER:     And on the question? All

 5   in favor?

 6               MULTIPLE:    Aye.

 7               MR. KESSLER:     Opposed?

 8               MS. ZALANTIS:       Thank you.

 9               MR. KESSLER:     See you next month. All

10   right, the final item under old business is the

11   application of John Lentini for the property of J

12   Glamour Nails and Spa for site development plan

13   approval for the conversion of the former La

14   Valletta Restaurant into a nail salon for

15   property located at 3172 East Main Street.

16   Drawings revised February 13, 2026. Hey, John.

17               MR. JOHN LENTINI:       Good evening, Mr.

18   Chairman, town board, town staff. John Lentini,

19   architect for the owners of this property. Could

20   I provide you a little bit of a history, just to

21   get up to speed, because so much time has gone

22   by? My client purchased this property that came,

23   both 3172 and 3176 with a sewer connection from

24   The Crossings. They hired a New York City



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 65 Original page ↗

                                                              Page 65
1    May 5, 2026

 2   architect who came to a determination that they

 3   could do certain things as of right. The

 4   determination turned out to be incorrect, but it

 5   largely had to do with whether or not we actually

 6   keep an existing building and add to it, or tear

 7   it down and build a new one. So it turns out

 8   there’s no way of selling the town that we’re

 9   going to try to add to the existing building to

10   come up with the plans, so we’re tearing it down.

11   Also, on a few first reviews, we were not

12   permitted to park in front, which I fully agree

13   with. There’s not enough space. So by using the

14   rear to satisfy the parking, eventually I took

15   over the plan. I don’t know if you’d call

16   inherited or adopted it, but the other architect

17   quit.

18              The engineer who came with this

19   Crossings sewer quit also, so I ended up with

20   this. I reduced the size of the building so that

21   the balance of parking by the zoning code meets

22   what we’re available, what we can have there.

23   Initially, they wanted to put a second story,

24   then they wanted to expand it. Then because of



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 66 Original page ↗

                                                            Page 66
1    May 5, 2026

 2   nail salons, there’s a ventilation required in

 3   the ceiling, so they raised each story level to

 4   get this ventilation up there, and it just got

 5   bigger. I made it as small as I could. But we did

 6   maintain the setbacks, but now we find that we

 7   need a variance. So I’ve asked to be referred to

 8   the variance board, or could I just apply? But

 9   since we haven’t even gotten through the planning

10   board, I’m not sure how this works.

11            MR. KESSLER:        I’m sorry, a variance for

12   what do you need?

13            MR. LENTINI:        Area variance, because the

14   original building is non-conforming. It’s only

15   five feet from one of the property lines, five or

16   seven feet.

17            MR. KESSLER:        I see.

18            MR. KEHOE:       It’s premature to go to the

19   zoning board until it’s more fleshed out with the

20   planning board. But that’s what we’re working

21   towards, John.

22            MR. LENTINI:        Yes. Well, some of the

23   objections that came back involve the three curb

24   cuts, the residential and the commercial use



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 67 Original page ↗

                                                            Page 67
1    May 5, 2026

 2   sharing one of the driveways, the potential for

 3   intermingling the residents and the people

 4   parking for the nail salon. Also, that there was

 5   not, even though we satisfy the town code, that

 6   we don’t have enough parking. It has been

 7   recommended that we remove one of the curb cuts,

 8   but that’s the only thing we have going for us

 9   now, that you could use the center curb cut to

10   drop people off. You can pull onto the site and

11   come off the site, and then the third eastern

12   curb cut is for the residents primarily.

13            But my client owns both properties, and

14   if he needs to get an easement or some agreement

15   or an association, he’ll satisfy that, but we

16   don’t really want to change the curb cuts. The

17   issue with the residents commingling with the

18   commercial, I’m not sure exactly what the issue

19   would be. But I point out that the town now has

20   four zones that encourage mingling commercial and

21   residents, the DNO, CC, MOD, and the CBD zone.

22   And in some cases, you’ll use the same parking

23   lot. In overlaying the highway commercial, I

24   believe they allow stores underneath apartments,



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 68 Original page ↗

                                                              Page 68
1    May 5, 2026

 2   and you’d have one parking lot. So I don’t --

 3   it’s been operating for a long time, I don’t see

 4   any real hazard with the residential

 5   intermingling with the commercial.

 6              The other thing is garbage disposal.

 7   Without a variance, I’m not sure how deeply I

 8   could dive into anything, but this doesn’t

 9   generate a lot of refuse. It’s a nail salon.

10   Maybe there are lunch bags, a couple of empty

11   bottles. But it’s not really a big issue that I

12   think would prevent us from getting to any other

13   step.

14              We know we have to address renderings,

15   we have to address the lighting, the landscaping.

16   We have to address abandoning the septic system.

17   But here, we were required to first hire another

18   surveyor to get a topo, then we were required to

19   hire an engineer to replace the one that left to

20   be able to connect the sewer. And now we can’t

21   connect the sewer because, to what? We have two

22   spurs. One could go to the residence, but the

23   other one can go to La Viletta Restaurant, which

24   is no longer there. So unless both of them are



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 69 Original page ↗

                                                            Page 69
1    May 5, 2026

 2   dug up and connected together, we’re at an

 3   impasse. We can’t even connect the sewers. At the

 4   beginning of our first several meetings, that

 5   became a very important feature of this, that

 6   you’re not going to get too far unless you

 7   connect these sewers. So we immediately jumped on

 8   that, got the surveyor, got the engineer.

 9            We’re being asked for, now, a traffic

10   study for the curb cuts, lighting, photometric.

11   All those people, if we need it, my client will

12   give it to you, whatever you want. Except that if

13   we’re not going to get the variance, do we go

14   through all of this prior to that? They’re

15   spending money.

16            MR. KESSLER:        Right.

17            MR. LENTINI:        And so we’re looking to

18   get -- and then if we do manage to get to the

19   next step, what are the chances we have a joint

20   public hearing? Where you’ve done it in the past

21   where the variance as a public hearing that the

22   planning board would share.

23            MR. KEHOE:       It would be next to zero.

24            MR. KESSLER:        Right. Yeah. They’re on a



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 70 Original page ↗

                                                            Page 70
1    May 5, 2026

 2   separate schedule than we are.

 3            MR. LENTINI:        Well --

 4            MR. KEHOE:       But John, I think what we’re

 5   suggesting is it would be helpful for the

 6   planning board to go out and see some of the

 7   issues that you’re raising. The house next door,

 8   how it interplays, the sharing of the parking

 9   lot, and that’ll help give the board some ideas

10   about what they think you should do next. So.

11            MR. LENTINI:        One other thing, to tell

12   you how misled my clients were, they bought the

13   brick for the project a couple of years ago.

14            MR. KEHOE:       Yeah, I did notice that.

15            MR. LENTINI:        They’re sitting in the

16   parking lot.

17            MR. KEHOE:       There are several pallets of

18   bricks in the parking lot out there, so they’re

19   ready to go.

20            MR. KESSLER:        Yeah.

21            MR. LENTINI:        They’re ready to go, yeah.

22   But they’re very committed and they’re not --

23   I’ve had clients that are always, Oh, well, can

24   we avoid that? Give them whatever they want, you



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 71 Original page ↗

                                                              Page 71
1    May 5, 2026

 2   know, well, that’s where I am now.

 3              MR. KEHOE:       John, I guess you’re saying

 4   the planning board has to approve a brick

 5   building out there?

 6              MR. LENTINI:        You have to approve what

 7   color of the brick. I don’t know if I can paint

 8   those bricks, or we’ve got a problem.

 9              MR. KESSLER:        All right. So as Chris

10   said, so we’ll come out and see the site end of

11   May, okay.

12              MR. LENTINI:        And then you’ll carry this

13   over to the next?

14              MR. KESSLER:        And then you’ll be back on

15   the agenda, yes.

16              MR. LENTINI:        Thank you. Thank you very

17   much.

18              MR. KESSLER:        All right. So with that,

19   Kellan?

20              MR. CANTRELL:         Yes, Chairman. I proposed

21   a site visit at 5:00 p.m. on May 28th and to

22   refer this back to staff.

23              MR. KESSLER:        Thank you. Second, please.

24              MR. ROTHFEDER:         Second.



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 72 Original page ↗

                                                               Page 72
1    May 5, 2026

 2               MR. KESSLER:        On the question, all in

 3   favor?

 4               MULTIPLE:       Aye.

 5               MR. KESSLER:        Opposed? All right, final

 6   item. New business. It’s the application of Mike,

 7   is it Miele? Meile?

 8               MR. MIKE MIELE:         Miele.

 9               MR. KESSLER:        Mike Miele for property of

10   56 Mistis Roa Hook Road for site development plan

11   approval and a steep slope permit for a proposed

12   16,000 square foot indoor multi-sports facility

13   for property located at 5664 Roa Hook Road,

14   drawings dated February 22, 2025. Good evening.

15               MR. DOUGLAS COOPER:           Good evening.

16               MR. MARK GEERING:          Good evening.

17               MR. COOPER:        I’m Douglas Cooper, this is

18   Mark Geering, and that is property owner Mannie

19   Yanez. And we’re here to present a 160-foot

20   building by 100 building. And it’s situated with

21   its own sewage disposal system. We’re planning to

22   connect with the municipal water that’s in the

23   street. And what else do you want to say, Mark?

24               MR. GEERING:        The parking on the --



                          Geneva Worldwide, Inc.
              228 Park Ave S - PMB 27669. New York, NY 10003

Page 73 Original page ↗

                                                              Page 73
1    May 5, 2026

 2               MR. COOPER:       Parking has overflow on the

 3   adjacent property, which is also owned by the

 4   same property owner, Mannie, here.

 5               MR. KESSLER:       But it’s two separate

 6   lots?

 7               MR. COOPER:       Two separate lots, yes.

 8               MR. ROTHFEDER:        Could you tell us a

 9   little bit about the project? I mean, the

10   facility, what it’s going to do and --

11               MR. COOPER: So it’s a sports complex.

12   It’s supposed to house soccer or pickle ball.

13               MR. ROTHFEDER:        And inside a building

14   where -- this is inside?

15               MR. COOPER:       Indoors.

16               MR. GEERING:       Yes.

17               MR. ROTHFEDER:        Inside, indoor? So it’s

18   all year?

19               MR. COOPER:       All year, yes.

20               MR. ROTHFEDER:        And just soccer and

21   pickle ball?

22               MR. GEERING:       It’ll have a concrete

23   floor, so you can do the either/or, or divide it

24   up into --



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 74 Original page ↗

                                                            Page 74
1    May 5, 2026

 2             MR. ROTHFEDER:        Okay. So it’s a space

 3   that might be used for both, then.

 4             MR. COOPER:       Yeah.

 5             MR. ROTHFEDER:        And that’s the only two

 6   things planned at this point, or is there --

 7             MR. COOPER:       Is that it? Just soccer and

 8   pickle.

 9             MR. MANNIE YANEZ:         Mostly soccer.

10             MR. KESSLER:       Come up to the microphone,

11   please.

12             MR. YANEZ:      Huh?

13             MR. KESSLER:       Just speak into the

14   microphone so we can get it for the record.

15             MR. YANEZ:      Mannie Yanez, the owner of

16   56 and 64 Roa Hook. Mostly it’s going to be just

17   a sports complex, either volleyball, either

18   pickle ball, or padel, that is getting into the

19   U.S., since I have two locations, one in

20   Hartsdale and the other one in Tarrytown. So now

21   we’re trying to perform it in this location,

22   since I tried it before to do storage with cars.

23   It just didn’t go good. So now I’d rather go this

24   route, which I think alleviates most of the



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 75 Original page ↗

                                                            Page 75
1    May 5, 2026

 2   problems of commercial zoning. And also as well,

 3   we tried to do this since we had a visit on my

 4   site. It looks like they might need one of my

 5   locations to put a --

 6            MR. COOPER:        Pump station.

 7            MR. YANEZ:       -- pump station. So that’s

 8   how we laid it out on the way that it works for

 9   everybody.

10            MR. ROTHFEDER:         And who would be coming

11   to this? Teams like from leagues or individuals?

12            MR. YANEZ:       Mostly individuals, or

13   mostly like, for example, my kids, they live --

14   we go to Scarsdale Schools, and we have little

15   leagues, and they go to the site, and they just,

16   instead of like in winter, there’s nothing

17   outside that we can do, so mostly they do indoor

18   soccer fields. But they subdivided 15 by 10 so

19   they can train on their skills mostly.

20            MR. ROTHFEDER:         Okay.

21            MR. KOBASA:        So it wouldn’t be games.

22   You’d be using the space more for training.

23            MR. YANEZ:       I’m sorry?

24            MR. KOBASA:        You’d be using the space



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 76 Original page ↗

                                                              Page 76
1    May 5, 2026

 2   more for training, not actual games?

 3              MR. YANEZ:       Mostly, yes.

 4              MR. KOBASA:        Yeah.

 5              MR. YANEZ:       I mean, mostly, we

 6   communicate with the schools, with private

 7   sectors, that they do training inside of it,

 8   mostly soccer. Now it’s padel, or you guys call

 9   it pickle ball, I think it is.

10              MR. KOBASA:        Oh, that’s what padel?

11              MR. YANEZ:       Yeah.

12              MR. KOBASA:        Oh, okay. I was --

13              MR. YANEZ:       Padel. Yeah, padel, pickle

14   ball.

15              MR. KOBASA:        Okay. All right. I was

16   trying to figure out what that was.

17              MR. YANEZ:       Yeah.

18              MR. ROTHFEDER:         I guess what we’re

19   asking is more along the lines of how much

20   activity is going to be there, how many cars will

21   be going in and out, what hours, that sort of

22   thing. We need more details about that to get a

23   sense. I mean, you can give it to us in writing,

24   but just to get a sense of what the project is.



                         Geneva Worldwide, Inc.
             228 Park Ave S - PMB 27669. New York, NY 10003

Page 77 Original page ↗

                                                            Page 77
1    May 5, 2026

 2              MR. KESSLER:      Yeah, the normal, this

 3   will get referred back to staff. We’ll do some

 4   additional review. We’ll come up with some of the

 5   questions. Specifically, we’re hearing what the

 6   planning board is asking. We’ll put those into

 7   our review memo, give you an opportunity to

 8   respond.

 9              MR. KESSLER:      Right. So once you get

10   those review memos, the faster you get the

11   answers back to us, then we can bring it back on

12   the agenda to continue the discussion and

13   probably then set a public hearing for your

14   application. But the first step, we’re in the

15   very preliminary stages here, is for you to

16   respond to staff’s review.

17              MR. COOPER:      Okay.

18              MR. CANTRELL:       Actually, is this a metal

19   building or a bubble?

20              MR. COOPER:      Metal.

21              MR. CANTRELL:       Metal.

22              MR. KEHOE:     Yeah. Obviously, one of the

23   things we’ll be asking for is building

24   elevations, get a sense of what it’s going to



                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 78 Original page ↗

                                                            Page 78
1    May 5, 2026

 2   look like.

 3            MR. COOPER:        Yep. Construction.

 4            MR. KESSLER:        Any other comments, staff

 5   or the board? So if not, Nora.

 6            MS. HILDINGER:         I’d like to make a

 7   motion to refer back to staff.

 8            MR. CANTRELL:          Second.

 9            MR. KESSLER:        Okay. And on the question.

10   All in favor?

11            MULTIPLE:       Aye.

12            MR. KESSLER:        Opposed? All right. See

13   you soon. Thank you.

14            MR. COOPER:        Thank you very much.

15            MR. YANEZ:       Thank you.

16            MR. KESSLER:        Thanks for coming in.

17            MR. KOBASA:        The time is 7:44. Meeting’s

18   adjourned.

19            MR. KESSLER:        Thank you.

20            (The public board meeting concluded at

21   7:44 p.m.)

22

23

24


                       Geneva Worldwide, Inc.
           228 Park Ave S - PMB 27669. New York, NY 10003

Page 79 Original page ↗

                                                         Page 79


                CERTIFICATE OF ACCURACY



I, Juan Penagos, certify that the foregoing

transcript of the Planning Board meeting of the

Town of Cortlandt on May 5, 2026 was prepared using

the required transcription equipment and is a true

and accurate record of the proceedings.



 Certified By




 ________________________________________



 Date: May 14, 2026